Search results
1 – 10 of 59Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang
Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…
Abstract
Purpose
Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.
Design/methodology/approach
Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.
Findings
The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.
Research limitations/implications
The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.
Originality/value
This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.
Details
Keywords
Mohammad S. Al-Mohammad, Ahmad Tarmizi Haron, Rahimi A. Rahman and Yasir Alhammadi
This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors' groupings among architecture…
Abstract
Purpose
This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors' groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics.
Design/methodology/approach
First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test.
Findings
The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public–private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia.
Originality/value
This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors' groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia.
Details
Keywords
Mohammad O. Eriqat, Rateb J. Sweis and Ghaleb J. Sweis
This paper aims to identify and provide a theoretical explanation for the barriers that hinder the adoption of emerging technologies in the architecture, engineering and…
Abstract
Purpose
This paper aims to identify and provide a theoretical explanation for the barriers that hinder the adoption of emerging technologies in the architecture, engineering and construction industry, irrespective of the company’s size, specialization or geographical location. In addition, the paper proposes potential areas for future research in this domain.
Design/methodology/approach
A list of barriers hindering the adoption of emerging technologies was identified and clarified using a systematic literature review of various scientific sources.
Findings
Twenty-five barriers were recognized and explained and some suggestions for future research studies were provided.
Research limitations/implications
The barriers related to a specific country or region or to a specific technology were excluded.
Originality/value
By providing a deeper comprehension of the barriers hindering the adoption of emerging technologies, this review is expected to encourage their adoption in the industry. Furthermore, it could prove valuable in devising effective strategies for the successful implementation of these technologies.
Details
Keywords
Nazanin Hatami and Ali Rashidi
Architecture, engineering and construction (AEC) is an important industry worldwide and one of the largest economic sectors in several developing countries, particularly in Iran…
Abstract
Purpose
Architecture, engineering and construction (AEC) is an important industry worldwide and one of the largest economic sectors in several developing countries, particularly in Iran. The Iranian AEC sector suffers from low productivity and needs to adopt building information modeling (BIM) to reduce inefficiencies. Therefore, this paper was conducted to identify the BIM barriers and propose practical solutions to overcome them in Iran.
Design/methodology/approach
A comprehensive literature review, two rounds of the Delphi technique and semi-structured interviews with 12 Iranian experts in the AEC sector were conducted. The data were analyzed using the mean score, standard deviation and nonparametric tests.
Findings
The present study identified 26 BIM barriers in the Iranian AEC community and provided practical strategies for improving BIM adoption. The identified barriers were categorized into six main groups including source barriers, financial barriers, unawareness barriers, organizational barriers, regulatory barriers and market-demand barriers. The main three BIM barriers in Iran were the lack of government intervention, change-resistant and the gap between industry and academia. Kruskal–Wallis tests revealed that there are no statistically significant differences in perceptions of BIM barriers between respondents. The Mann–Whitney test indicated that there is no statistically significant difference in perceptions between engineers and architects except for one.
Originality/value
There are few studies on BIM adoption across developing countries, particularly in Iran. Moreover, the results can also be used in other developing nations with similar conditions.
Details
Keywords
Janet Chang, Klaudia Jaskula, Eleni Papadonikolaki, Dimitrios Rovas and Ajith Kumar Parlikad
This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction…
Abstract
Purpose
This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction phase. The significance of effective management of handover information is highlighted by global building failures, such as the Grenfell Tower fire in London, UK. Despite existing technological interventions, there remains a paucity of understanding regarding the factors contributing to the decline in the quality of handover information during the post-construction phase.
Design/methodology/approach
This study employed a multi-case studies approach across five higher education institutions. It involved conducting semi-structured interviews with 52 asset management professionals, uncovering the underlying reasons for the decline in handover information quality. Building on these insights, the study performed a mapping exercise to align these identified factors with blockchain technology features and information quality dimensions, aiming to evaluate blockchain’s potential in managing quality handover information.
Findings
The study findings suggest that blockchain technology offers advantages but has limitations in addressing all the identified quality issues of managing handover information. Due to the lack of an automated process and file-based information exchange, updating handover information still requires an error-prone manual process, leading to potential information loss. Additionally, no solutions are available for encoding drawings for updates and validation.
Originality/value
This study proposes a framework integrating blockchain to enhance the information management process and improve handover information quality.
Details
Keywords
Sara Gusmao Brissi and Luciana Debs
This study focuses on identifying key principles for implementing strategic changes in design and construction companies interested in successfully using offsite construction…
Abstract
Purpose
This study focuses on identifying key principles for implementing strategic changes in design and construction companies interested in successfully using offsite construction (OSC) in multifamily housing projects, considering the need for more affordable and sustainable multifamily housing in the United States of America (USA).
Design/methodology/approach
Using mixed methods, the study involved three phases of data collection and data analysis: (1) delphi survey, (2) online survey, (3) proposition of principles and validation interviews.
Findings
The key principles identified by the present research are (1) develop product-oriented business model, (2) promote leadership and mindset engagement with OSC principles, (3) engage in partnerships and more innovative contractual models, (4) shift toward digital transformation, (5) develop training and knowledge management strategies, (6) adopt lean construction (LC) practices, (7) develop training and knowledge management strategies and (8) integrate logistics and supply chain management with AEC (architecture, engineering and construction) processes.
Practical implications
The implementation of the principles and strategic changes identified in this study aims to prepare design and construction companies, especially small and medium-sized enterprises (SMEs), to embrace the increasing use of OSC in multifamily projects in the USA, which will make them more efficient and resilient and, ultimately, will contribute to the construction of more affordable and sustainable multifamily housing projects in the USA.
Originality/value
This is the first research to address holistic strategies to support design and construction companies in adopting OSC.
Details
Keywords
Nam Bui, Christoph Merschbrock and Bjørn Erik Munkvold
This paper aims to explore how open innovation communities contribute to the adoption of building information modelling (BIM) in the construction industry.
Abstract
Purpose
This paper aims to explore how open innovation communities contribute to the adoption of building information modelling (BIM) in the construction industry.
Design/methodology/approach
The paper presents a cross-case analysis of two construction communities, buildingSMART Norway and the BIM Vietnam Community. Data were collected based on 21 semi-structured interviews conducted with industry experts actively engaged in these two communities. The theoretical basis for the study was open innovation and the institutional intervention model, which delineates institutional actions related to the adoption of new information technology.
Findings
The findings show both similarities and differences in the way in which the communities contribute to industrial practice. Both communities use similar knowledge channels and repositories but apply different approaches to innovation creation and diffusion. In addition, trust can support BIM innovation in the community context.
Originality/value
The comparison of buildingSMART Norway and the BIM Vietnam Community in accelerating BIM innovation allows for exploring how open innovation communities support BIM adoption in the construction industry. The findings provide insights for construction communities into creating and diffusing BIM innovation. In addition, the examples of gaining benefits from community innovation activities are useful for construction firms and practitioners.
Details
Keywords
Hong Xue, Sujie Zhang, Zezhou Wu and Lin Zhang
Despite smart construction technology's great potential to improve the productivity of the architectural, engineering and construction (AEC) industry, the implementation of smart…
Abstract
Purpose
Despite smart construction technology's great potential to improve the productivity of the architectural, engineering and construction (AEC) industry, the implementation of smart construction technology has failed to achieve the expected benefits due to the negative usage behaviors of construction enterprise employees. This study aims to identify the determinants and their configuration effects on the smart construction technology usage behavior (SCTUB) based on the Technology-Organization-Environment (TOE) framework. This study then verifies the practical paths to improve the employee's SCTUB from the configuration perspective.
Design/methodology/approach
A mixed-method approach involving survey and qualitative comparative analysis (QCA) is conducted in this study. Based on the detailed literature review and semi-structured interview, this study identifies the factors and proposes the TOE framework to determine the configuration conditions affecting employee's SCTUB and verify practical paths to promote this user behavior.
Findings
The TOE framework's technical, organizational and environmental elements are interdependent. The emergence of a high SCTUB is not determined by a single determinant but by configuration conditions. Four equifinal conditions (e.g. organization-technology type, technology-organization type, environment type and organization-technology balanced type) are verified to promote construction enterprise employee's SCTUB.
Practical implications
The four verified configuration conditions could guide construction enterprises to formulate complementary strategies for promoting the construction enterprises' employees to implement smart construction technology and achieve the enterprise's digital transformation.
Originality/value
The inter-dependence of the three-dimension factors, namely technical, organizational and environmental elements are explored to enrich the literature on the TOE framework. Meanwhile, the configuration effects of these factors on usage behavior are identified, expanding the literature on the information technology acceptance model.
Details
Keywords
Haiyan Xie, Ying Hong, Mengyang Xin, Ioannis Brilakis and Owen Shi
The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish…
Abstract
Purpose
The purpose of this study is to improve communication success through barrier identification and analysis so that the identified barriers can help project teams establish effective information-exchange strategies.
Design/methodology/approach
The recent publications on construction communication about time management are reviewed. Then, the semi-structured interviews are performed with both questionnaires and audio recordings (n1 = 18). Next, the collected data are analyzed using both statistical measures on the questionnaire survey and qualitative coding analysis on the text transcripts from an audio recording. Particularly, the identified barriers are substantiated using a scientometrics approach based on the published articles (2011–2020, n2 = 52,915) for purposeful information-sharing solutions in construction time management. Furthermore, the intervention strategies from the top 10 most-cited articles are analyzed and validated by comparisons with the results from construction surveys and relevant studies.
Findings
Based on the discussed communication difficulties, five main barriers were identified during time-cost risk management: probability and statistical concepts, availability of data from external resources, details of team member experiences, graphics (and graphical presentation skills), and spatial and temporal (a.k.a. 4D) simulation skills. For the improvement of communication skills and presentation quality regarding probability and statistical concepts, project teams should emphasize context awareness, case studies and group discussions. Details of communication techniques can be adjusted based on the backgrounds, experiences and expectations of team members.
Research limitations/implications
The dataset n1 has both size and duration limits because of the availability of the invited industry professionals. The dataset n2 considers the literature from 2011 to 2020. Any before-the-date and unpublished studies are not included in the study.
Practical implications
A thorough comprehension of communication barriers can help project teams develop speaking, writing and analytical thinking skills that will enable the teams to better deliver ideas, thoughts and meanings. Additionally, the established discussion on barrier-removal strategies may enhance time management effectiveness, reduce project delays, avoid confusion and misunderstanding and save rework costs.
Social implications
This research calls for the awareness of communication barriers in construction project execution and team collaboration. The identified barriers and the established solutions enrich the approaches of construction companies to share information with communities and society.
Originality/value
This is the first identification model for communication barriers in the time management of the construction industry to the authors' knowledge. The influencing factors and the countermeasures of communication difficulties highlighted by the research were not examined systematically and holistically in previous studies. The findings provide a new approach to facilitate the development of powerful communication strategies and to improve project execution.
Details
Keywords
Luciana Teixeira Batista, José Ricardo Queiroz Franco, Ricardo Hall Fakury, Marcelo Franco Porto, Lucas Vinicius Ribeiro Alves and Gabriel Santos Kohlmann
The objective of this research is to develop an solution to water management at the scale of buildings, through the technological resources. Automating analysis using 3D models…
Abstract
Purpose
The objective of this research is to develop an solution to water management at the scale of buildings, through the technological resources. Automating analysis using 3D models helps increase efficiency in buildings during the operational phase, consequently promotes sustainability.
Design/methodology/approach
This study presents a methodology based on Design Science Research to automate water management at building scale integrating BIM-IoT-FM. Data from smart meters (IoT) and the BIM model were integrated to be applied in facilities management (FM) to improve performance of the building. The methodology was implemented in a prototype for the web, called AquaBIM, which captures, manages and analyzes the information.
Findings
The application of AquaBIM allowed the theoretical evaluation and practical validation of water management methodology. By BIM–IoT integration, the consumption parameters and ranges for 17 categories of activities were determined to contribute to fulfill the research gap for the commercial buildings. This criterion and other requirements are requirements met in order to obtain the AQUA-HQE environmental sustainability certification.
Practical implications
Traditionally, water management in buildings is based on scarce data. The practical application of digital technologies improves decision-making. Moreover, the creation of consumption indicators for commercial buildings contributes to the discussion in the field of knowledge.
Originality/value
This article emphasizes the investigation of the efficiency of use in commercial buildings using operational data and the use of sustainable consumption indicators to manage water consumption.
Details