Search results

1 – 10 of over 3000
Open Access
Book part
Publication date: 1 May 2019

Theophilus O.O. Olowa, Emlyn Witt and Irene Lill

BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction…

Abstract

Purpose

BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction education. The purpose of this study is to gain an understanding of existing examples of BIM education, their characteristics, the challenges faced in their implementation and any clear trends to focus the doctoral research effort.

Design/Methodology/Approach

A systematic search of peer-reviewed BIM education literature was carried out. From the articles captured, 51 specific cases of BIM education were identified and analysed.

Findings

Most cases are from the USA with a more global spread from 2013. A tendency towards interdisciplinary collaboration was apparent though single discipline courses remain important. BIM software in education is dominated by Autodesk products. Most cases were found to be BIM-focused with few examples of BIM-enabled education. This was consistent with the most significant BIM education challenges that were found to relate to the skill levels of students, time and the availability of technical support.

Research Limitations/Implications

This is an initial study. It is based on only 51 cases of BIM education, which were partially described in peer reviewed conference and journal papers available in international databases.

Practical Implications

The investigation has shed some light on existing examples of BIM education and these are useful in designing BIM education initiatives as well as directing further research efforts.

Originality/Value

The study offers an original perspective on global BIM education. It also represents the commencement of doctoral research.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Article
Publication date: 20 June 2019

Yaser Gamil and Ismail Abd Rahman Rahman

This paper aims to investigate the awareness of construction practitioners of the adoption of building information modeling (BIM) and identification of the dominant challenges of…

1749

Abstract

Purpose

This paper aims to investigate the awareness of construction practitioners of the adoption of building information modeling (BIM) and identification of the dominant challenges of implementing BIM in the life cycle of a construction project.

Design/methodology/approach

This study was sequentially conducted in the following in three main phases: a preliminary study of archival literature, where a rigorous study of the literature was conducted to identify the challenges of adopting BIM in the construction industry which was to be applied later to the challenges in the case of the Yemen construction industry; data collection, where data were collected using a questionnaire survey targeting 123 Yemeni construction practitioners working in managerial and technical levels; and data analysis, where data were analyzed using descriptive analysis by calculating the average index and standard deviations. The data were analyzed using the SPSS software.

Findings

The results show that the most critical challenges to adopt BIM are financial restrictions, lack of BIM knowledge, improper introduction of BIM concepts, lack of awareness of BIM benefits and no governmental enforcement. The study recommends policymakers and construction players to consider the challenges for a better introduction of BIM in the Yemen construction industry.

Research limitations/implications

This research focuses on the awareness and challenges of implementing BIM in the Yemen construction industry.

Practical implications

The findings of this study will help policymakers develop more constructive strategies to reduce the challenges and introduce governmental agendas towards the widespread use of the BIM concept and technology in the Yemen construction industry. The study suggested an in-depth investigation into the current curriculum in the Yemen universities and recommended the introduction of BIM concept in engineering courses.

Social implications

This study focused on the challenges of implementing BIM and the role of the social aspect in the issue.

Originality/value

From the extensive review of previous findings, this paper concentrates on the challenged to the implementation of BIM in the Yemen construction industry. There are lack of investigative studies that focus on the introduction of new technologies to advance the Yemen construction sector. Therefore, the findings help the authority to diagnose and address the sources of these challenges and introduce new solutions to the industry.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 March 2024

Hemanth Kumar N. and S.P. Sreenivas Padala

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based…

Abstract

Purpose

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based multiobjective optimization (MOO) model integrating the nondominated sorting genetic algorithm III (NSGA-III) to enhance sustainability. The goal is to reduce embodied energy and cost in the design process.

Design/methodology/approach

Through a case study research method, this study uses BIM, NSGA-III and real-world data in five phases: literature review, identification of factors, BIM model development, MOO model creation and validation in the architecture, engineering and construction sectors.

Findings

The innovative BIM-based MOO model optimizes embodied energy and cost to achieve sustainable construction. A commercial building case study validation showed a reduction of 30% in embodied energy and 21% in cost. This study validates the model’s effectiveness in integrating sustainability goals, enhancing decision-making, collaboration, efficiency and providing superior assessment.

Practical implications

This model delivers a unified approach to sustainable design, cutting carbon footprint and strengthening the industry’s ability to attain sustainable solutions. It holds potential for broader application and future integration of social and economic factors.

Originality/value

The research presents a novel BIM-based MOO model, uniquely focusing on sustainable construction with embodied energy and cost considerations. This holistic and innovative framework extends existing methodologies applicable to various buildings and paves the way for additional research in this area.

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 March 2024

Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…

Abstract

Purpose

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.

Design/methodology/approach

Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.

Findings

The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.

Research limitations/implications

The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.

Originality/value

This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 March 2024

Nam Bui, Christoph Merschbrock and Bjørn Erik Munkvold

This paper aims to explore how open innovation communities contribute to the adoption of building information modelling (BIM) in the construction industry.

Abstract

Purpose

This paper aims to explore how open innovation communities contribute to the adoption of building information modelling (BIM) in the construction industry.

Design/methodology/approach

The paper presents a cross-case analysis of two construction communities, buildingSMART Norway and the BIM Vietnam Community. Data were collected based on 21 semi-structured interviews conducted with industry experts actively engaged in these two communities. The theoretical basis for the study was open innovation and the institutional intervention model, which delineates institutional actions related to the adoption of new information technology.

Findings

The findings show both similarities and differences in the way in which the communities contribute to industrial practice. Both communities use similar knowledge channels and repositories but apply different approaches to innovation creation and diffusion. In addition, trust can support BIM innovation in the community context.

Originality/value

The comparison of buildingSMART Norway and the BIM Vietnam Community in accelerating BIM innovation allows for exploring how open innovation communities support BIM adoption in the construction industry. The findings provide insights for construction communities into creating and diffusing BIM innovation. In addition, the examples of gaining benefits from community innovation activities are useful for construction firms and practitioners.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 27 February 2024

Yu Yang, Shiting Shao and Dongping Cao

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility…

Abstract

Purpose

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility design, construction and operation processes, scant scholarly attention has been paid to systematically investigating how and why complex BIM policies are concretely and gradually implemented in different regional contexts from a dynamic policy diffusion perspective. This study aims to empirically investigate how different types of BIM policy instruments are dynamically implemented in heterogeneous regions over time and how the diffusion of BIM policies across different regions is comprehensively impacted by both internal efficiency needs and external legitimacy pressures.

Design/methodology/approach

This study employed a positivist research paradigm in which BIM policy data from 182 prefecture-level and above cities in China during 2011–2022 were analyzed with quantitative approaches for theory verification. Based on the content analysis of the evolutionary characteristics of the adopted BIM policy instruments in heterogeneous regions over time, the event history analysis (EHA) method was then used to further examine the mechanisms underlying the diffusion of BIM policies across different regions.

Findings

The content analysis results show that while environmental instruments (such as technological integration and goal planning) are the primary policy instruments currently adopted in China, recent years have also witnessed increasing adoptions of supply-side instruments (such as fiscal support and information support) and demand-side instruments (such as demonstration projects and tax incentives). After controlling for the impacts of regional fiscal and technical resources, the EHA results illustrate that BIM policy adoption positively relates to regional construction industry scale but negatively relates to regional industry productivity and that compared with public pressures from industry participants, vertical pressures from the central government and horizontal pressures from neighboring regions are more substantial drivers for policy adoption.

Originality/value

As an exploratory effort of using a dynamic policy diffusion perspective to systematically investigate how BIM policies are adopted in heterogeneous regional contexts to facilitate BIM advancement, this study not only characterizes the complexity and dynamics of BIM policies but also provides deepened understandings of the mechanisms underlying policy adoption in the conservative construction industry. The findings hold implications for how multifarious policy instruments can be more effectively and dynamically adopted to facilitate the advancement of BIM and related technologies as innovative solutions in the construction domain.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 February 2024

Abdulkabir Opeyemi Bello and Calistus Ayegba

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to…

Abstract

Purpose

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to investigate the adoption of BIM for post-construction in Nigeria. Specifically, it aims to investigate the barriers hindering BIM adoption, propose strategies to facilitate its integration into the post-construction phase and examine the relationship between the barriers and strategies towards adopting BIM for post-construction.

Design/methodology/approach

This study employs a quantitative approach to gather numerical data on BIM perceived barriers among International Facility Management Association (IFMA) members. The study also develops strategies from an extensive literature review and combines them with insights from preliminary investigation. The data were analysed using descriptive and inferential statistics.

Findings

The top perceived barriers among the professionals are lack of BIM awareness, software availability issues and difficulties using new technologies. Institute training/workshops on BIM software for the professionals in the organisation, including BIM software courses in various related professional exams, and encouraging adoption of BIM from the grassroots, such as higher institutions, emerge as the top strategies. The findings further show a significant relationship between the barriers and strategies, emphasising the recognition that understanding barriers prompts the active development and implementation of strategies.

Originality/value

This study holds originality in its examination of the relationship between the barriers and strategies associated with BIM adoption in Nigerian Architecture, Construction, Engineering and Operation.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 2 February 2024

Zhaofeng Ye, Maxwell Fordjour Antwi-Afari, Algan Tezel and Patrick Manu

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused…

Abstract

Purpose

The impact of building information modeling (BIM) on various aspects of project management has attracted much attention in the past decade. However, previous studies have focused on a particular facet of project management (e.g., safety, quality, facility management) and within identified target journals. Despite numerous existing studies, there is limited research on the mainstream research topics, gaps and future research directions on BIM in project management. This study aims to conduct a bibliometric and science mapping review of published articles on BIM in project management and to identify mainstream research topics, research gaps and future research directions in this domain.

Design/methodology/approach

A science mapping approach consisting of bibliometric search, scientometric analysis and qualitative discussion was used to analyze 521 journal articles that were retrieved from the Scopus database and related to BIM in project management. In the scientometric analysis, keyword co-occurrence analysis and document analysis were performed. This was followed by a qualitative discussion that seeks to propose a framework summarizing the interconnection between the mainstream research topics, research gaps and future research directions.

Findings

Six mainstream research topics were found including (1) BIM-enabled advanced digital technologies, (2) BIM-based reinforcement and enhancement, (3) BIM and project composition, (4) BIM project elements and attributes, (5) BIM-based collaboration and communication and (6) BIM-based information and data. Moreover, this study discussed six research gaps, namely, (1) integration of BIM and other digital technologies, (2) future maturity of BIM applications in project management, (3) application of BIM in project components and processes, (4) role of BIM application in project elements and attributes, (5) impact of collaboration and communication in BIM application and (6) stability of information and data interaction. Furthermore, future research directions were discussed.

Originality/value

The findings and proposed framework contribute to providing a deeper understanding to researchers, policymakers and practitioners in the development of related research and practice in the domain of BIM in project management, thus, promoting digital transformation in project management. Overall, it adds to the global knowledge domain in BIM and promotes the need for digital and data integration, BIM maturity and BIM collaboration.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 3000