Search results

1 – 10 of over 3000
Open Access
Book part
Publication date: 1 May 2019

Theophilus O.O. Olowa, Emlyn Witt and Irene Lill

BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction…

Abstract

Purpose

BIM education for construction professionals has tended to lag industry developments. This investigation initiates doctoral research into the use of BIM for construction education. The purpose of this study is to gain an understanding of existing examples of BIM education, their characteristics, the challenges faced in their implementation and any clear trends to focus the doctoral research effort.

Design/Methodology/Approach

A systematic search of peer-reviewed BIM education literature was carried out. From the articles captured, 51 specific cases of BIM education were identified and analysed.

Findings

Most cases are from the USA with a more global spread from 2013. A tendency towards interdisciplinary collaboration was apparent though single discipline courses remain important. BIM software in education is dominated by Autodesk products. Most cases were found to be BIM-focused with few examples of BIM-enabled education. This was consistent with the most significant BIM education challenges that were found to relate to the skill levels of students, time and the availability of technical support.

Research Limitations/Implications

This is an initial study. It is based on only 51 cases of BIM education, which were partially described in peer reviewed conference and journal papers available in international databases.

Practical Implications

The investigation has shed some light on existing examples of BIM education and these are useful in designing BIM education initiatives as well as directing further research efforts.

Originality/Value

The study offers an original perspective on global BIM education. It also represents the commencement of doctoral research.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Article
Publication date: 20 June 2019

Yaser Gamil and Ismail Abd Rahman Rahman

This paper aims to investigate the awareness of construction practitioners of the adoption of building information modeling (BIM) and identification of the dominant challenges of…

1787

Abstract

Purpose

This paper aims to investigate the awareness of construction practitioners of the adoption of building information modeling (BIM) and identification of the dominant challenges of implementing BIM in the life cycle of a construction project.

Design/methodology/approach

This study was sequentially conducted in the following in three main phases: a preliminary study of archival literature, where a rigorous study of the literature was conducted to identify the challenges of adopting BIM in the construction industry which was to be applied later to the challenges in the case of the Yemen construction industry; data collection, where data were collected using a questionnaire survey targeting 123 Yemeni construction practitioners working in managerial and technical levels; and data analysis, where data were analyzed using descriptive analysis by calculating the average index and standard deviations. The data were analyzed using the SPSS software.

Findings

The results show that the most critical challenges to adopt BIM are financial restrictions, lack of BIM knowledge, improper introduction of BIM concepts, lack of awareness of BIM benefits and no governmental enforcement. The study recommends policymakers and construction players to consider the challenges for a better introduction of BIM in the Yemen construction industry.

Research limitations/implications

This research focuses on the awareness and challenges of implementing BIM in the Yemen construction industry.

Practical implications

The findings of this study will help policymakers develop more constructive strategies to reduce the challenges and introduce governmental agendas towards the widespread use of the BIM concept and technology in the Yemen construction industry. The study suggested an in-depth investigation into the current curriculum in the Yemen universities and recommended the introduction of BIM concept in engineering courses.

Social implications

This study focused on the challenges of implementing BIM and the role of the social aspect in the issue.

Originality/value

From the extensive review of previous findings, this paper concentrates on the challenged to the implementation of BIM in the Yemen construction industry. There are lack of investigative studies that focus on the introduction of new technologies to advance the Yemen construction sector. Therefore, the findings help the authority to diagnose and address the sources of these challenges and introduce new solutions to the industry.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 April 2024

Carlos Alejandro Diaz Schery, Rodrigo Goyannes Gusmão Caiado, Soraida Aguilar Vargas and Yiselis Rodriguez Vignon

The purpose of this paper is twofold: first, to present a rigorous bibliometric analysis and a systematic literature review of the critical success factors (CSFs) for Building…

Abstract

Purpose

The purpose of this paper is twofold: first, to present a rigorous bibliometric analysis and a systematic literature review of the critical success factors (CSFs) for Building information modelling (BIM)-based digital transformation; second, to identify the relationship between the dimensions in favour of BIM implementation.

Design/methodology/approach

This study adopts a two-step approach to combine bibliometric and systematic literature review to explore the research topic of BIM and CSFs. Bibliometric tools such as Biblioshiny in R language and Ucinet software were applied to this study.

Findings

Besides identifying the two most influential authors (e.g. Bryde and Antwi-Afari), the key journal for disseminating articles, and the most influential countries in this discourse (e.g. Hong Kong and Australia), the study also identifies four pivotal research themes derived from the co-occurrence analysis of keywords: the fusion of sustainability and technology with BIM; practical application and its integration within construction management; innovation and engineering paradigms; and the advent of emerging technologies (e.g. Blockchain) within developing nations. Additionally, the paper introduces a comprehensive framework for selecting CSFs pertinent to BIM-centred digital transformation as viewed through the lens of dynamic capabilities.

Originality/value

This paper establishes a link between dynamic capabilities theory, CSFs, and BIM dimensions, presenting a multifaceted framework guiding future paths and offering practical insights for managerial and political decision-makers engaged in digital transformation endeavours. The study positions dynamic capabilities as pivotal, aligning digital technologies with continuous business performance, and advocates for a strategic focus on digital transformation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 April 2024

Yibin Ao, Panyu Peng, Mingyang Li, Jiayue Li, Yan Wang and Igor Martek

Building Information Modeling (BIM) competitions are a beneficial approach to enhance BIM education, offering students practical experience in BIM application, including mastering…

Abstract

Purpose

Building Information Modeling (BIM) competitions are a beneficial approach to enhance BIM education, offering students practical experience in BIM application, including mastering workflows and technical tools. However, research exploring the individual perceptions influencing participation intentions and behaviors in BIM competitions is limited. Therefore, this study aims to investigate the factors affecting university students' behavioral intention and behavior in BIM competitions, providing theoretical support for BIM competitions and educational reform.

Design/methodology/approach

This study employs the Structural Equation Modeling (SEM) based on the Unified Theory of Acceptance and Use of Technology (UTAUT) framework to analyze the factors influencing BIM competition participation among 970 Architecture, Engineering, and Construction (AEC) university students.

Findings

The results of the study show that social influence, attitude, and self-efficacy play critical roles in shaping students' intentions to participate in BIM competitions. Furthermore, self-efficacy, facilitating conditions, and behavioral intention significantly influence students' actual engagement in such competitions. Surprisingly, effort expectancy negatively influences intentions, as less challenging tasks can lead students to perceive their participation as less impactful on their skills and learning, reducing their behavioral intention to participate.

Originality/value

This research provides valuable insights into the effectiveness of BIM competitions in enhancing BIM education for AEC students. Extending the UTAUT model to include self-efficacy and attitude, provides a novel perspective for understanding students' intentions and behaviors regarding BIM competitions. The study’s theoretical support proposes incorporating BIM competitions to augment BIM teaching methods and offers suggestions for advancing the efficacy of students' involvement in BIM competitions within higher education, thus contributing to educational reform in the AEC sector.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Article
Publication date: 4 March 2024

Hemanth Kumar N. and S.P. Sreenivas Padala

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based…

Abstract

Purpose

The construction industry is tasked with creating sustainable, efficient and cost-effective buildings. This study aims to develop a building information modeling (BIM)-based multiobjective optimization (MOO) model integrating the nondominated sorting genetic algorithm III (NSGA-III) to enhance sustainability. The goal is to reduce embodied energy and cost in the design process.

Design/methodology/approach

Through a case study research method, this study uses BIM, NSGA-III and real-world data in five phases: literature review, identification of factors, BIM model development, MOO model creation and validation in the architecture, engineering and construction sectors.

Findings

The innovative BIM-based MOO model optimizes embodied energy and cost to achieve sustainable construction. A commercial building case study validation showed a reduction of 30% in embodied energy and 21% in cost. This study validates the model’s effectiveness in integrating sustainability goals, enhancing decision-making, collaboration, efficiency and providing superior assessment.

Practical implications

This model delivers a unified approach to sustainable design, cutting carbon footprint and strengthening the industry’s ability to attain sustainable solutions. It holds potential for broader application and future integration of social and economic factors.

Originality/value

The research presents a novel BIM-based MOO model, uniquely focusing on sustainable construction with embodied energy and cost considerations. This holistic and innovative framework extends existing methodologies applicable to various buildings and paves the way for additional research in this area.

Open Access
Article
Publication date: 13 March 2024

Lina Gharaibeh, Kristina Eriksson and Björn Lantz

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to…

Abstract

Purpose

Perceived benefits of building information modelling (BIM) have been discussed for some time, but cost–benefit benchmarking has been inconsistent. The purpose of this paper is to investigate BIM feasibility and evaluate investment worth to elucidate and develop the current understanding of BIM merit. The aim of the study is to propose a research agenda towards a more holistic perspective of BIM use incorporating quantifying investment return.

Design/methodology/approach

An in-depth examination of research patterns has been conducted to identify challenges in the assessment of the investment value and return on investment (ROI) for BIM in the construction industry. A total of 75 research articles were considered for the final literature review. An evaluation of the literature is conducted using a combination of bibliometric analysis and systematic reviews.

Findings

This study, which analysed 75 articles, unveils key findings in quantifying BIM benefits, primarily through ROI calculation. Two major research gaps are identified: the absence of a standardized BIM ROI method and insufficient exploration of intangible benefits. Research focus varies across phases, emphasizing design and construction integration and exploring post-construction phases. The study categorizes quantifiable factors, including productivity, changes and rework reduction, requests for information reduction, schedule efficiency, safety, environmental sustainability and operations and facility management. These findings offer vital insights for researchers and practitioners, enhancing understanding of ’BIM’s financial benefits and signalling areas for further exploration in construction.

Originality/value

The ’study’s outcomes offer the latest insights for researchers and practitioners to create effective approaches for quantifying ’BIM’s financial benefits. Additionally, the proposed research agenda aims to improve the current limited understanding of BIM feasibility and investment worth evaluation. Results of the study could assist practitioners in overcoming limitations associated with BIM investment and economic evaluations in the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 March 2024

Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…

Abstract

Purpose

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.

Design/methodology/approach

Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.

Findings

The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.

Research limitations/implications

The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.

Originality/value

This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 3000