1 – 10 of 17Mohamed Marzouk and Mohamed Zaher
Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing…
Abstract
Purpose
Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing complexity of different systems, facility managers may suffer from a lack of information. The purpose of this paper is to propose a new facility management approach that links segmented assets to the vital data required for managing facilities.
Design/methodology/approach
Automatic point cloud segmentation is one of the most crucial processes required for modelling building facilities. In this research, laser scanning is used for point cloud acquisition. The research utilises region growing algorithm, colour-based region-growing algorithm and Euclidean cluster algorithm.
Findings
A case study is worked out to test the accuracy of the considered point cloud segmentation algorithms utilising metrics precision, recall and F-score. The results indicate that Euclidean cluster extraction and region growing algorithm revealed high accuracy for segmentation.
Originality/value
The research presents a comparative approach for selecting the most appropriate segmentation approach required for accurate modelling. As such, the segmented assets can be linked easily with the data required for facility management.
Details
Keywords
Mohamed Marzouk and Dina Hamdala
The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…
Abstract
Purpose
The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.
Design/methodology/approach
The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.
Findings
The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.
Research limitations/implications
The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.
Originality/value
The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.
Details
Keywords
Mohamed Battour, Khalid Mady, Mohamed Salaheldeen, Ririn Tri Ratnasari, Ramzi Sallem and Saleh Al Sinawi
The huge Muslim population has increased the demand for halal tourism products and destination factors in this niche tourism segment. Despite the growing body of research…
Abstract
Purpose
The huge Muslim population has increased the demand for halal tourism products and destination factors in this niche tourism segment. Despite the growing body of research conducted regarding ChatGPT’s revolutionary impact on the tourism industry, the use of such an artificial intelligence (AI) tool in halal tourism needs more attention. This study aims to provide a comprehensive an overview of using ChatGPT in the tourism industry, specifically in halal tourism, and offer an agenda for further essential research questions exploration.
Design/methodology/approach
Through the intensive examination of the tourism literature dealing with AI and halal tourism, this review identifies the implications related to the use of ChatGPT for Muslim travelers and future trends in halal tourism.
Findings
This paper identified the possible utilization of ChatGPT in assisting Muslim travelers across various stages of their journey, encompassing pre-trip, staying and post-trip phases. Subsequently, this paper identified the opportunities and challenges associated with implementing ChatGPT in the context of halal tourism. Finally, the paper delves into potential avenues for future research.
Practical implications
The findings serve as crucial implications, contributing to the theory of halal tourism development and the applications of ChatGPT in halal tourism.
Originality/value
This paper provides essential foundational knowledge for upcoming research on halal tourism theory, ChatGPT and the development of halal tourism sector.
Details
Keywords
Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current…
Abstract
Purpose
Key performance indicators (KPIs) play a pivotal role in evaluating the level of success of an organization in achieving its business objectives. The objective of the current research is to identify and prioritize effective KPIs in branding products and construction projects, which contribute to the success of construction companies in a competitive environment.
Design/methodology/approach
The present research is of an inferential, descriptive and survey nature. In this study, we identified the influential key performance indicators of construction companies in branding products and construction projects for success in a competitive environment through a literature review and expert opinions. The data were collected using a questionnaire, and a combination of the one-sample t-test method with a 95% confidence level and the fuzzy multiple attribute decision-making (FMADM) method was employed for analysis.
Findings
The results indicate that the most influential key performance indicators for construction companies in branding products and construction projects for success in a competitive environment are, in order of significance, the following indices: “Marketing and Advertising,” “Financial,” “Creativity,” “Technical and Operational” and “Social and Political.”
Originality/value
The present research examines the importance of branding construction products and projects for the success of construction companies by improving their business objectives and utilizing key performance indicators throughout the product lifecycle (production and construction). This study provides solutions on how construction companies can increase their competitive advantage through branding and achieve long-term success in the global construction industry.
Details
Keywords
Haitham Alajmani, Salma Ahmed and Sameh Monir El-Sayegh
This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19…
Abstract
Purpose
This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19 pandemic onset. The study also measures the likelihood of the effects caused by these delays.
Design/methodology/approach
A mixed approach of both qualitative and quantitative. Literature review was conducted to extract 40 factors of delays and 10 effects of delays. A survey was then administered to construction professionals in the UAE to collect the perceptions on the severity and frequency of factors of the causes of delays using a Likert Scale of 1–5 where 1 represented very low and 5 represented very high. Similarly, the respondents were also asked to rate the likelihood of the occurrence of the effects of the delays based on a Likert scale of 1–5 as well. Furthermore, Spearman’s rank correlation was also conducted to compute the level of agreement between the different parties; owner, consultants and contractors.
Findings
The results revealed that the top five factors of delays include: award the project for the lowest bidder, delay in progress payment, change orders by the owner, poor subcontractor performance and inadequate planning and scheduling by the contractor. The findings of this study emphasize the financial challenges and economic crisis brought upon the construction industry due to the pandemic. Furthermore, the pandemic also shifted the perceptions of construction professionals, who are now more aware of the delays caused by awarding the project to the lowest bidder who would not have the required qualifications to conduct efficient planning and scheduling that are relevant in the case of extraordinary events such as Covid-19. Moreover, a high level of agreement between the consultants and contractors was observed, with a Spearman’s rank correlation of 0.804. Additionally, the most likely effects of delays concluded from this study were time overrun/extension and poor quality of work.
Originality/value
Literature review is very rich in the field of construction projects delays. However, there is very limited research on the impact of Covid-19 in the context of construction projects delays, and insights from construction professionals regarding this matter are particularly lacking in literature. Therefore, this paper bridges the gap in literature by providing perceptions of construction professionals on the impact of Covid-19 on the factors causing delays in the UAE construction industry. The findings of this research are expected to be an invaluable resource for future to help the construction industry heal faster when encountering similar epidemics or extraordinary events.
Details
Keywords
Odey Alshboul, Ali Shehadeh, Omer Tatari, Ghassan Almasabha and Eman Saleh
Efficient management of earthmoving equipment is critical for decision-makers in construction engineering management. Thus, the purpose of this paper is to prudently identify…
Abstract
Purpose
Efficient management of earthmoving equipment is critical for decision-makers in construction engineering management. Thus, the purpose of this paper is to prudently identify, select, manage and optimize the associated decision variables (e.g. capacity, number and speed) for trucks and loaders equipment to minimize cost and time objectives.
Design/methodology/approach
This paper addresses an innovative multiobjective and multivariable mathematical optimization model to generate a Pareto-optimality set of solutions that offers insights of optimal tradeoffs between minimizing earthmoving activity’s cost and time. The proposed model has three major stages: first, define all related decision variables for trucks and loaders and detect all related constraints that affect the optimization model; second, derive the mathematical optimization model and apply the multiobjective genetic algorithms and classify all inputs and outputs related to the mathematical model; and third, model validation.
Findings
The efficiency of the proposed optimization model has been validated using a case study of earthmoving activities based on data collected from the real-world construction site. The outputs of the conducted optimization process promise the model’s originality and efficiency in generating optimal solutions for optimal time and cost objectives.
Originality/value
This model provides the decision-maker with an efficient tool to select the optimal design variables to minimize the activity's time and cost.
Details
Keywords
Ernest Kissi, Clinton Aigbavboa and Prosper Babon-Ayeng
The purpose of this study was to identify key areas for benchmarking (BM) towards the improvement of small and medium scale enterprises (SMEs) construction firms in developing…
Abstract
Purpose
The purpose of this study was to identify key areas for benchmarking (BM) towards the improvement of small and medium scale enterprises (SMEs) construction firms in developing countries.
Design/methodology/approach
The study employed the use of the quantitative research method in the collection and analysis of primary data collected from field surveys using a piloted close-ended questionnaire created following a review of available literature on BM. Based on 63 solicited views of professionals with SMEs (quantity surveyors, project managers and architects) data collected were statistically analysed using a one-sample t-test.
Findings
The findings of the study indicate that the key areas for BM towards the improvement of SME construction firms in developing countries in order of relevance are “Financial Performance”, “Competitiveness”, “Customer Satisfaction”, “Technology Advancement”, “Communication Skills”, “Collaboration”, “Employee Satisfaction” and “Product orientation”.
Practical implications
The study has given more insight into the areas that need more attention for SMEs BM to achieve improvement. It can therefore be suggested firms that adapted identified areas will derive the benefits of BM. It is further opined that more BM education should be provided to various SMEs construction firms to facilitate an effective and efficient BM regime aiming at performance enhancement in project delivery.
Originality/value
This forging research attempts to identify the key areas for BM towards the improvement of SMEs construction firms in developing countries. Although there have been several efforts to create BM tools for the construction industry.
Details
Keywords
Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole
Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…
Abstract
Purpose
Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.
Design/methodology/approach
This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.
Findings
Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.
Practical implications
Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.
Originality/value
This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.
Details
Keywords
Ram Asra Khural, Shashi, Myriam Ertz and Roberto Cerchione
This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable…
Abstract
Purpose
This study explores the relationships among sustainability implementation barriers (resource, managerial and regulatory barriers), sustainability practices (sustainable construction materials, sustainable construction design, modern construction methods and environmental provisions and reporting) and sustainability performance (environmental, economic and social) in hill road construction (HRC).
Design/methodology/approach
Primary data were collected from the 313 HRC practitioners with the help of a questionnaire, and research hypotheses were tested employing structural equation modeling.
Findings
The findings reveal a mixed effect of sustainability implementation barriers. Resource (managerial) barriers are negatively related to all practices except environmental provisions and reporting (sustainable construction materials), while regulatory barriers only negatively impact modern construction methods. On the other hand, all sustainability practices positively impact environmental performance, whereas economic (social) performance is positively influenced by all practices, except environmental provisions and reporting (modern construction methods), and positively affects economic performance.
Originality/value
In order to transform HRC toward sustainability, the barriers to sustainability implementation, sustainability practices and performance need to be understood by practitioners; however, the relationships have not previously been empirically assessed in extant literature. Besides, past research appears to be predominantly focused on the environmental aspect, thereby neglecting economic and social aspects. This study is a modest attempt to bridge these research gaps.
Details
Keywords
Richard Kadan, Temitope Seun Omotayo, Prince Boateng, Gabriel Nani and Mark Wilson
This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While…
Abstract
Purpose
This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While past studies concentrated on selection and relationships, this study delved into how effective subcontractor management impacts project success.
Design/methodology/approach
This study used the Bayesian Network analysis approach, through a meticulously developed questionnaire survey refined through a piloting stage involving experienced industry professionals. The survey was ultimately distributed among participants based in Accra, Ghana, resulting in a response rate of approximately 63%.
Findings
The research identified diverse components contributing to subcontractor disruptions, highlighted the necessity of a clear regulatory framework, emphasized the impact of financial and leadership assessments on performance, and underscored the crucial role of main contractors in Integrated Project and Labour Cost Management with Subcontractor Oversight and Coordination.
Originality/value
Previous studies have not considered the challenges subcontractors face in projects. This investigation bridges this gap from multiple perspectives, using Bayesian network analysis to enhance subcontractor management, thereby contributing to the successful completion of construction projects.
Details