Article
Publication date: 6 October 2022

Ahmed Gouda Mohamed and Amr Mousa

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building…

Abstract

Purpose

Current research efforts exhibit a surge imperative for a building information modelling (BIM) approach that embodies a repository of all relevant data of existing building components while monitoring and consistently recording numerous components’ functions throughout its lifecycle, especially in Egypt. This research paper aims to develop an integrated as-is BIM-facility management (FM) information model for the existing building’s components via a case study, depicting a repository for historical data and knowledge amassed from inspections and conveying maintenance decisions automatically during the FM practices.

Design/methodology/approach

The developed approach pursues four successive steps: data acquisition and processing of building components; components recognition from point clouds; modelling scanned point clouds; and quick response code information transfer to BIM components.

Findings

The proposed approach incorporates the as-is BIM with the building components’ as-is FM information to portray a repository for historical data and knowledge collected from inspections to proactively benefit facility managers in simplifying, expediting and enhancing maintenance decisions automatically during FM practices.

Originality/value

This paper presents a digital alternative to manual maintenance recordkeeping concerning building components to retrieve their as-is and historical data using a case study in Egypt. This paper proposes a broad scan to as-is information BIM approach for the existing building’s components to condone maintenance interventions using a versatile, affordable, readily available and multi-functional method for scanning the building’s components using a handheld tool.

Details

Journal of Facilities Management , vol. 22 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 10 July 2024

Hasan Fevzi Cugen, Semra Arslan Selcuk and Yusuf Arayici

Building Information Modelling in building processes brings significant efficiency gains. However, its use in restoration projects is still experimental. On the other hand, more…

Abstract

Purpose

Building Information Modelling in building processes brings significant efficiency gains. However, its use in restoration projects is still experimental. On the other hand, more than traditional methods are needed for communication, collaboration, and shared understanding. Hence, the main research question is how to enhance these aspects in multinational projects with information transparency challenges and the need for shared understanding among stakeholders. This research aims to develop and propose a hybrid modelling approach that integrates traditional and BIM-based information process workflows through testing and evaluating to what extent BIM can be used in restoration projects without excessive efforts.

Design/methodology/approach

Considering this aim, the case study, the Mahmud Pasha Hammam as the heritage building, a 15th-century structure located in Serbia, was studied with the action research strategy to enable action-based learning by doing. Alongside the 2D documentation as the traditional method for the existing structure, restoration design proposals were also produced for the new additions to the heritage structure with BIM.

Findings

A new BIM use scenario was experimented with and proposed, proving BIM implementation's potential impact on heritage restoration projects. A hybrid model was developed that meets the requirements of existing regulations and specifications, where restoration proposals were visualized quickly, quantity take-off was produced, and technical drawings were generated instantly.

Originality/value

This hybrid modelling workflow integrates HBIM with traditional methods in restoration projects to improve communication, efficiency, and collaboration in a real-time professional project.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 15 February 2023

Sochea Khan, Kriengsak Panuwatwanich and Sasiporn Usanavasin

This paper presents a developed BIMxAR application, an integration of building information modeling (BIM) with augmented reality (AR) linked with real-time online database to…

Abstract

Purpose

This paper presents a developed BIMxAR application, an integration of building information modeling (BIM) with augmented reality (AR) linked with real-time online database to support the building facility management work. The primary aim of this research was to develop and empirically examine the applicability of a BIM-based AR (BIMxAR) application in building facility management.

Design/methodology/approach

The BIMxAR application was developed and experimented with maintenance work of a university laboratory building. The experiment consisted of a comparison of supportive maintenance tasks performed using the traditional approach and the BIMxAR approach by 38 university students. The time taken to complete each task was recorded and analyzed using statistical analyses to compare the performance between the tasks completed using each approach.

Findings

The results indicated that the group using the BIMxAR application approach completed the tasks correctly in a significantly shorter time compared to that using the traditional approach. The findings supported the applicability of the developed BIMxAR application and the improvement of the building facility management tasks when using the proposed approach.

Originality/value

This paper presents a methodological approach in developing a mobile application that integrates BIM with AR for facility management work, leveraging real-time information exchange through a cloud-based platform. The paper also provides empirical evidence that demonstrates how the integration between BIM and AR could be achieved and implemented to help facilitate building maintenance tasks.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 September 2024

Alireza Arbabi, Roohollah Taherkhani and Ramin Ansari

With the advancement of technology and more attention to environmental issues, building information modeling (BIM) and green building have become two new and growing trends in the…

Abstract

Purpose

With the advancement of technology and more attention to environmental issues, building information modeling (BIM) and green building have become two new and growing trends in the construction industry. Therefore, this study proposes a new strategy that integrates BIM and green building rating assessments with an emphasis on Iran Green Building Rating System (IGBRS).

Design/methodology/approach

By creating a Revit-IGBRS project template that includes sheets related to all credits, the project compliance with the IGBRS credits and management of submittal documents for certification has been facilitated. Finally, a case study of the materials and resources category of the IGBRS system was performed to validate the BIM-IGBRS application model. All 8 criteria of this category were examined by using Dynamo programming for the Revit sample project.

Findings

A practical model for BIM and IGBRS integration is presented, which allows designers to be aware of the IGBRS scores obtained before the project’s construction phase and examine different scenarios for the highest scores. Overall, this study showed that integrating BIM and the Iranian rating system is possible with some constraints, and adding some features to BIM software can promote this integration.

Originality/value

Given that no study has been conducted on the integration of BIM with the Iran Green Building Rating System (IGBRS), the present research investigates utilizing building information modeling to meet the credits requirements of this rating system. The results of this research can be generalized and used in other green rating systems.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 July 2023

Ruochen Zeng, Jonathan J.S. Shi, Chao Wang and Tao Lu

As laser scanning technology becomes readily available and affordable, there is an increasing demand of using point cloud data collected from a laser scanner to create as-built…

Abstract

Purpose

As laser scanning technology becomes readily available and affordable, there is an increasing demand of using point cloud data collected from a laser scanner to create as-built building information modeling (BIM) models for quality assessment, schedule control and energy performance within construction projects. To enhance the as-built modeling efficiency, this study explores an integrated system, called Auto-Scan-To-BIM (ASTB), with an aim to automatically generate a complete Industry Foundation Classes (IFC) model consisted of the 3D building elements for the given building based on its point cloud without requiring additional modeling tools.

Design/methodology/approach

ASTB has been developed with three function modules. Taking the scanned point data as input, Module 1 is built on the basis of the widely used region segmentation methodology and expanded with enhanced plane boundary line detection methods and corner recalibration algorithms. Then, Module 2 is developed with a domain knowledge-based heuristic method to analyze the features of the recognized planes, to associate them with corresponding building elements and to create BIM models. Based on the spatial relationships between these building elements, Module 3 generates a complete IFC model for the entire project compatible with any BIM software.

Findings

A case study validated the ASTB with an application with five common types of building elements (e.g. wall, floor, ceiling, window and door).

Originality/value

First, an integrated system, ASTB, is developed to generate a BIM model from scanned point cloud data without using additional modeling tools. Second, an enhanced plane boundary line detection method and a corner recalibration algorithm are developed in ASTB with high accuracy in obtaining the true surface planes. At last, the research contributes to develop a module, which can automatically convert the identified building elements into an IFC format based on the geometry and spatial relationships of each plan.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 August 2024

Heap-Yih Chong, Yufan Zhang, Cen Ying Lee, Fei Wang and Yubin Zhang

Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail…

Abstract

Purpose

Audit trail cost management is crucial for ensuring accountability and enhancing quality assurance in construction management. Despite limited practical studies on audit trail management from a cost perspective; this study developed a lifecycle-based audit trail cost management framework. It used synchronized Building Information Modeling (BIM) cost models and Bills of Quantities (BoQs) to address the existing gap.

Design/methodology/approach

This study employed a descriptive case study approach of a real-life hospital project in China. Data triangulation was achieved through interviews, observations, documents, and relevant artifacts.

Findings

The study identified three key factors contributing to cost variances between BIM cost models and BoQs: differences in measurement rules, model precision, and professional errors, particularly evident during the preliminary estimate stage. Notably, significant cost savings of approximately RMB 5.811 million were achieved during the detailed estimate stage. During the construction phase, a synchronized approach was deployed to improve precise payment verification and modifications to the BIM model. In the post-construction phase, the synchronized as-built BIM models and BoQs served as primary references to facilitate the resolution of operational discrepancies.

Practical implications

The research contributes to the literature by proposing a synchronized approach of BIM cost models and BoQs. This approach enhances traceability and accountability of project information, catering to the digitalization needs of the construction industry.

Originality/value

This study unveils a pragmatic approach to enhancing transparency and accountability in audit-trail cost management by synchronizing BIM cost models and BoQs at various project stages. The synchronized approach offers a promising direction for future research and implementation of audit trail frameworks to enhance cost management in construction.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 July 2024

Bruno Lot Tanko, Jack Thomas Oakley, Zainab Jagun and Upeksha Madanayake

Sustainable and resilient infrastructure projects aim to reduce flooding impacts and improve community adaptability. For instance, flood-resistant stilts elevate structures…

Abstract

Purpose

Sustainable and resilient infrastructure projects aim to reduce flooding impacts and improve community adaptability. For instance, flood-resistant stilts elevate structures, mitigating flood damage. Comprehensive consideration is crucial when adding elements to housing projects, incurring costs for all involved parties. This study aims to assess the viability of concrete stilts for cost-effective flood mitigation in Malaysian terrace housing.

Design/methodology/approach

The study evaluates cost implications through a comparative 5D building information modeling (BIM) cost analysis of stilted and conventional (standard) housing models. This assesses the percentage increase in total cost. Furthermore, a survey of construction professionals was undertaken. The study used online convenience and stratified sampling techniques. Out of the 222 emails that were sent, 27 construction professionals located in Johor, Sabah and Selangor within Malaysia participated in the research survey. Their perspectives on stilt housing prospects and factors for costing such structures were analyzed through a descriptive analysis using SPSS.

Findings

The case study models revealed that the incorporation of stilts could lead to a 21.64% increase in the overall cost per unit. This cost increase was primarily attributed to the additional reinforcement required. However, the survey findings highlighted that a majority of construction professionals perceived the cost increment to fall within the range of 10%–20%. Consequently, it becomes imperative to meticulously consider cost factors such as foundational requirements, staircases, and the extended construction duration to effectively curtail expenditures. The prospect of heightened costs potentially posing a threat to profit margins and discouraging developers necessitates careful financial management. Notwithstanding these challenges, the survey's insights underscored that professionals in the construction industry indeed recognize the potential of stilt technology in the realm of flood mitigation and management, particularly within housing projects.

Practical implications

This research has significant practical implications. It provides a precise financial contrast between housing categories using 5D BIM and incorporates construction experts’ viewpoints on raised housing. Enhanced design considerations for raised housing can make it economically viable, offering a cost-effective, nature-based approach to flood mitigation. This approach can bring substantial benefits to residents by reducing flood-related damages and enhancing community resilience.

Originality/value

One of the notable aspects of this research is its originality. It uses a dual quantitative methodology involving modeling and survey techniques to address its objectives effectively. This approach contributes significantly to the relatively limited body of research focused on stilt housing and the application of 5D BIM. By combining these methodologies, the study explores a relatively uncharted area, making a valuable contribution to the field.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 August 2022

Muhammad Azeem Abbas, Saheed O. Ajayi, Adekunle Sabitu Oyegoke and Hafiz Alaka

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based…

2716

Abstract

Purpose

Master information delivery plan (MIDP) is a key requirement for building information modelling (BIM) execution plan (BEP) that enlists all information deliverables in BIM-based project, containing information about what would be prepared, when, by who, as well as the procedures and protocols to be used. In a well-conceived BEP, the MIDP facilitates collaboration among stakeholders. However, current approaches to generating MIDP are manual, making it tedious, error-prone and inconsistent, thereby limiting some expected benefits of BIM implementation. The purpose of this study is to automate the MIDP and demonstrate a collaborative BIM system that overcomes the problems associated with the traditional approach.

Design/methodology/approach

A BIM cloud-based system (named Auto-BIMApp) involving naming that automated MIDP generation is presented. A participatory action research methodology involving academia and industry stakeholders is followed to design and validate the Auto-BIMApp.

Findings

A mixed-method experiment is conducted to compare the proposed automated generation of MIDP using Auto-BIMApp with the traditional practice of using spreadsheets. The quantitative results show over 500% increased work efficiency, with improved and error-free collaboration among team members through Auto-BIMApp. Moreover, the responses from the participants using Auto-BIMApp during the experiment shows positive feedback in term of ease of use and automated functionalities of the Auto-BIMApp.

Originality/value

The replacement of traditional practices to a complete automated collaborative system for the generation of MIDP, with substantial productivity improvement, brings novelty to the present research. The Auto-BIMApp involve multidimensional information, multiple platforms, multiple types and levels of users, and generates three different representations of MIDP.

Article
Publication date: 21 June 2023

Luciana Teixeira Batista, José Ricardo Queiroz Franco, Ricardo Hall Fakury, Marcelo Franco Porto, Lucas Vinicius Ribeiro Alves and Gabriel Santos Kohlmann

The objective of this research is to develop an solution to water management at the scale of buildings, through the technological resources. Automating analysis using 3D models…

Abstract

Purpose

The objective of this research is to develop an solution to water management at the scale of buildings, through the technological resources. Automating analysis using 3D models helps increase efficiency in buildings during the operational phase, consequently promotes sustainability.

Design/methodology/approach

This study presents a methodology based on Design Science Research to automate water management at building scale integrating BIM-IoT-FM. Data from smart meters (IoT) and the BIM model were integrated to be applied in facilities management (FM) to improve performance of the building. The methodology was implemented in a prototype for the web, called AquaBIM, which captures, manages and analyzes the information.

Findings

The application of AquaBIM allowed the theoretical evaluation and practical validation of water management methodology. By BIM–IoT integration, the consumption parameters and ranges for 17 categories of activities were determined to contribute to fulfill the research gap for the commercial buildings. This criterion and other requirements are requirements met in order to obtain the AQUA-HQE environmental sustainability certification.

Practical implications

Traditionally, water management in buildings is based on scarce data. The practical application of digital technologies improves decision-making. Moreover, the creation of consumption indicators for commercial buildings contributes to the discussion in the field of knowledge.

Originality/value

This article emphasizes the investigation of the efficiency of use in commercial buildings using operational data and the use of sustainable consumption indicators to manage water consumption.