Article
Publication date: 11 May 2020

Tochukwu Moses, David Heesom and David Oloke

The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information…

2867

Abstract

Purpose

The purpose of this paper is to report on primary research findings that sought to investigate and analyse salient issues on the implementation of 5D building information modelling (BIM) from the UK contractors’ perspective. Previous research and efforts have predominantly focussed on the use of technologies for cost estimation and quantity takeoff within a more traditional-led procurement, with a paucity of research focussing on how 5D BIM could facilitate costing within contractor-led procurement. This study fills this current knowledge gap and enhances the understanding of the specific costing challenges faced by contractors in contractor-led projects, leading to the development of 5D framework for use in future projects.

Design/methodology/approach

To develop a fully detailed understanding of the challenges and issues being faced in this regard, a phenomenological, qualitative-based study was undertaken through interviews involving 21 participants from UK-wide construction organisations. A thematic data analytical process was applied to the data to derive key issues, and this was then used to inform the development of a 5D-BIM costing framework.

Findings

Multi-disciplinary findings reveal a range of issues faced by contractors when implementing 5D BIM. These exist at strategic, operational and technological levels which require addressing successful implementation of 5D BIM on contractor-led projects adhering to Level 2 BIM standards. These findings cut across the range of stakeholders on contractor-led projects. Ultimately, the findings suggest strong commitment and leadership from organisational management are required to facilitate cost savings and generate accurate cost information.

Practical implications

This study highlights key issues for any party seeking to effectively deploy 5D BIM on a contractor-led construction project. A considerable cultural shift towards automating and digitising cost functions virtually, stronger collaborative working relationship relative to costing in design development, construction practice, maintenance and operation is required.

Originality/value

By analysing findings from primary research data, the work concludes with the development of a 5D BIM costing framework to support contractor-led projects which can be implemented to ensure that 5D BIM is successfully implemented.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 February 2019

Mohammad Mayouf, Michael Gerges and Sharon Cox

This paper aims to investigate the integration of a quantity surveyor (QS) role and practice within the building information modelling (BIM) process to enable better…

5745

Abstract

Purpose

This paper aims to investigate the integration of a quantity surveyor (QS) role and practice within the building information modelling (BIM) process to enable better implementation of five-dimensional building information modelling (5D BIM) (D is a result of the data/information dimension integrated in a BIM model). It proposes the use of a “level of development and level of detail” to provide a structured approach for QSs’ integration within the BIM process for an improved implementation of 5D BIM.

Design/methodology/approach

This paper uses semi-structured interviews with QSs from academic and industry in the UK. A total of 20 face-to-face semi-structured interviews were conducted with two groups (industrial and academic) of ten participants from the West Midlands region in the UK. The interview questions have focussed on gaining perspectives on BIM, BIM and government protocols for the QS profession, expectations and challenges when implementing 5D BIM.

Findings

The findings show that BIM is perceived differently, and limitation of information obtained from the 3D models in BIM reduce the reliability of 5D BIM for QSs and implementing of 5D BIM needs an understanding of BIM workflow and information requirements.

Research limitations/implications

Although the findings reveal many of the complexities that face QSs within the BIM process and the shortfalls of 5D BIM technology, the results may lack generalisation. Thus, future research seeks to test the proposed framework further.

Practical implications

This paper elicits implications of shortfalls that impact the implementation of 5D BIM technology and the complexities that face QSs within the BIM process.

Originality/value

This paper reveals the need to understand the process of integrating stakeholders and their information requirements for better implementation of technologies within BIM.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 10 August 2020

Faris Elghaish, Sepehr Abrishami, M. Reza Hosseini and Soliman Abu-Samra

The amalgamation of integrated project delivery (IPD) and building information modelling (BIM) is highly recommended for successful project delivery. However, IPD lacks an…

2168

Abstract

Purpose

The amalgamation of integrated project delivery (IPD) and building information modelling (BIM) is highly recommended for successful project delivery. However, IPD lacks an accurate cost estimation methodology at the “front-end” of projects, when little project information is available. This study aims to tackle this issue, through presenting analytical aspects, theoretical grounds and practical steps/procedures for integrating target value design (TVD), activity-based costing (ABC) and Monte Carlo simulation into the IPD cost structure, within a BIM-enabled platform.

Design/methodology/approach

A critical review was conducted to study the status of cost estimation within IPD, as well as exploring methods and tools that can enhance the cost estimation process for IPD. Thereafter, a framework is developed to present the proposed methodology of cost estimation for IPD throughout its entire stages. A case project is used to validate the practicality of the developed solution through comparing the profit-at-risk percentage for each party, using both traditional cost estimation and the proposed solution.

Findings

After applying the proposed IPD's cost estimation framework, on a real-life case project, the findings demonstrated significant deviations in the profit-at-risk value for various work packages of the project (approximately 100% of the finishing package and 22% of openings package). By providing a precise allocation of overhead costs, the solution can be used in real-life projects to change the entire IPD cost structure and ensure a fair sharing of risk–rewards among the involved parties in IPD projects.

Practical implications

Using the proposed methodology of cost estimation for IPD can enhance the relationship among IPD's core team members; all revealed financial deficiencies will be considered (i.e. compensation structure, profit pooling), hence enhancing the IPD performance.

Originality/value

This paper presents a comprehensive solution for integrating BIM and IPD in terms of cost estimation, offering three main contributions: (1) an innovate approach to utilise five-dimensional (5D) BIM capabilities with Monte Carlo simulation, hence providing reliable cost estimating during the conceptual TVD stage; (2) mathematical models that are developed through integrating ABC into the detailed 5D BIM to determine the three IPD's cost structure limbs; and (3) a novel mechanism of managing cost saving (rewards) through distinguishing between saved resources from organisation level, to daily task level, to increase trust among parties.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 February 2022

Farzaneh Moshtaghian and Esmatullah Noorzai

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Abstract

Purpose

This research has been conducted with a view to creating a framework to integrate risk management based on building information modeling (BIM) information.

Design/methodology/approach

In this research, all the information related to the construction of a residential project including 3D, 4D and 5D BIM models and the execution and control phases information was collected, and the risk list was determined for each activity accordingly.

Findings

The present study has suggested a framework for risk management in order to optimize project changes.

Originality/value

The lack of integration between 3D, 4D and 5D modeling besides execution information is a fundamental problem in many projects. The gap between these two groups of information will lead to improper management and late decisions, eventually imposing unforeseen delays and cost overruns. Risk management by the means of adopting a new approach has been addressed in recent studies using new methods, such as BIM and its associated technologies, some of which were mentioned in the review of theoretical literature in this research.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Book part
Publication date: 29 March 2021

Benjamin Gbolahan Ekemode and Daramola Thompson Olapade

The purpose of this chapter is to investigate the adoption and use of building information modelling (BIM) for residential real estate development in Nigeria (using Lagos as a…

Abstract

The purpose of this chapter is to investigate the adoption and use of building information modelling (BIM) for residential real estate development in Nigeria (using Lagos as a case study), with a view to providing information towards improving BIM uptake, which could enhance sustainable housing delivery in the country. A quantitative research methodology was adopted involving the use of questionnaire survey to collect primary data. The data were obtained from private real estate developers in Lagos State. The self-administered questionnaire was distributed to all the 72 active real estate developers in the study area, and the response rate was 62.5%. The collected data were analysed using statistical tools such as frequency and percentages, mean rating and chi-square. The results revealed a low level of awareness and usage of the transformative and contemporary BIM technology (6D BIM version) by real estate developers. It was established that the 2D and 3D BIM traditional versions were the most utilised across the phases of real estate development process. It was also found that the level of BIM utilisation has a significant relationship with the age and asset base of the real estate developers. The chapter concludes by advocating increase in the asset base and organisational profile of real estate developers to enhance BIM adoption, especially, the 6D BIM, which could facilitate sustainable real estate development.

Details

Sustainable Real Estate in the Developing World
Type: Book
ISBN: 978-1-83867-838-8

Keywords

Article
Publication date: 25 June 2019

Wei He, Yichao Shi and Dewei Kong

The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the…

Abstract

Purpose

The construction industry is characterized by a long construction period, high cost and many uncontrollable factors. The owners and contractors are increasingly focusing on the efficiency of their construction and costs in pursuit of greater economic benefits. However, current methods used in the construction period and cost optimization analysis with multiple constraints the have their own limitations. Therefore, this study aims to propose a combination of genetic algorithm (GA) and building information modeling (BIM) to construct a five-dimensional construction duration-cost optimization model with the advantages of optimization and simulation for optimization.

Design/methodology/approach

This design first analyzed the characteristics of changing construction period and cost and then improved the genetic mechanism and the data processing method in the GA according to the aforementioned characteristics. Then, BIM technology was combined with GA to testify the feasibility of the model in the practical engineering project.

Findings

The result proved that this new method was reasonable and effective in dealing with the complicated problem of period and cost. GA accelerated the optimization process and yielded a reliable Pareto solution. BIM technology simulated the construction process before construction to increase the feasibility of the construction scheme.

Originality/value

This method not only can rapidly provide the best construction period/cost decision to the architect according to the previous working period/cost or contract data that can meet the demands of the architect but also visualize the construction and give a dynamic schedule of the project.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 February 2024

Mojdeh Naderi, Ahad Nazari, Ali Shafaat and Sepehr Abrishami

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of…

Abstract

Purpose

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of enhancing the accuracy of cost performance indicators in construction project management.

Design/methodology/approach

An innovative approach is proposed, employing the activity-based costing (ABC) accounting method combined with building information modelling (BIM) to assign real overhead costs to project activities. This study, distinguished by its incorporation of a real case study, focuses on an administrative building with a four-story concrete structure. It establishes an automated method for evaluating project cost performance through the detailed analysis of earned value management (EVM) cost indicators derived from ABC results and BIM data.

Findings

The results show that the ABC integration improves the accuracy of cost performance indicators by over 9%, revealing the project's true cost index for the first time and demonstrating the substantial value of the approach in construction engineering and management.

Research limitations/implications

The current study highlights a notable gap in the existing literature, addressing the challenges in onsite overhead cost estimation and offering a solution that incorporates the state-of-the-art techniques.

Practical implications

The proposed method has significant implications for project managers and practitioners, enabling better-informed decisions based on precise cost data, ultimately leading to enhanced project outcomes.

Originality/value

This research uniquely combines ABC and BIM, presenting a pioneering solution for the accurate estimation and management of COCs in construction projects, adding significant value to the current body of knowledge in this field.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 November 2019

Solomon Olusola Babatunde, Srinath Perera, Damilola Ekundayo and Tolulope Esther Adeleye

Although studies have shown the relevance of building information modeling (BIM) in cost estimating process, efforts at investigating BIM based detailed cost estimating among…

3212

Abstract

Purpose

Although studies have shown the relevance of building information modeling (BIM) in cost estimating process, efforts at investigating BIM based detailed cost estimating among professional quantity surveyors through quantitative approach are scanty. The purpose of this study is to identify and examine the usage of BIM-based detailed cost estimating software and assesses the drivers to BIM adoption within the Nigerian quantity surveying consulting firms.

Design/methodology/approach

A comprehensive literature review, pilot study and questionnaire survey were adopted. The survey targeted both the BIM users and non- BIM users’ quantity surveying consulting firms in Lagos, Nigeria. The data collected were analyzed using frequency, percentage, mean score, standard deviation, Mann–Whitney test and factor analysis.

Findings

The study found that 46.58 per cent of quantity surveying consulting firms are aware of BIM and have adopted it for detailed cost estimating, while 49.32 per cent of quantity surveying consulting firms are aware but have not adopted BIM-based detailed cost estimating, and 4.10 per cent of quantity surveying consulting firms are not aware at all. Also, the study identified various BIM-based detailed cost estimating software used in quantity surveying practices and found that Microsoft Excel is often used alongside 3D software, Autodesk QTO, Navisworks, Innovaya Composer and CostX are prevalent BIM software used for detailed cost estimating. In addition, the study identified 21 drivers to the adoption of BIM in quantity surveying practices. The result of factor analysis grouped the 21 identified drivers into five principal factors: improved whole lifecycle/design quality, enhanced decision and visualization, cost and time saving, marketing and support for quantity surveyor tasks and government and client pressure.

Practical implications

This study provides significant insight into the application of BIM to quantity surveying consulting practices, thereby enabling consultant quantity surveyors to make informed decisions to select BIM cost estimating software to suit their practices. Further, the study findings can be useful for individuals’, clients’ and contractors’ quantity surveyors to be fully aware of the opportunities BIM could bring in relation to their service delivery.

Originality/value

Accurate cost estimating, effective cost monitoring and control are essential elements to a construction project success. This study further emphasized the importance of BIM to quantity surveying practices, particularly in the area of the detailed cost estimating.

Details

Journal of Financial Management of Property and Construction , vol. 25 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 January 2023

Syahrul Nizam Kamaruzzaman, Sarah Nabiha Suznan and Nik Elyna Myeda

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks…

Abstract

Purpose

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks at identifying the information needed to implement BIM application in FM, to determine the level of implementation of BIMFM as well as to recommend BIMFM application mapping for building life cycle.

Design/methodology/approach

This study applied qualitative methodology, upon which a purposive sampling to 16 interviewees were conducted among professionals involved in any BIM, FM, BIMFM projects. Final analysis was conducted using thematical analysis by ATLAS.ti software.

Findings

The types of information required to implement BIMFM range from managerial information, commercial information, technical information and all full life cycle data. The implementation of BIMFM is agreed as beneficial, as it builds up efficiency of building performance, able to close gap of loses information, helps to improve FM in terms of data management, mitigates the problems, identifies priority defects and to enhance the FM processes. Respondents also believed that the causes where there is no implementation of BIMFM is in the situations where things are in order and when it becomes very expensive.

Originality/value

This paper has managed to gather the essential elements toward leveraging the implementation of BIMFM in digital construction project which are in the means of information types, the needs of BIMFM implementation and towards the end drawing the BIMFM implementation plan framework that could be used as a reference for the practitioners and industry.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 10 August 2018

Kudirat Olabisi Ayinla and Zulfikar Adamu

In the architecture, engineering and construction (AEC) industry, a “digital divide” exists in technology adoption because SMEs (who often form the bulk of AEC organisations in…

3311

Abstract

Purpose

In the architecture, engineering and construction (AEC) industry, a “digital divide” exists in technology adoption because SMEs (who often form the bulk of AEC organisations in most countries) are thought to be “Late Majority” and “Laggards” in the adoption of Building information modelling (BIM) technology. Larger organisations not saddled with financial and socio-technical constraints might be considered as being among the “Early Majority” or “Innovators”. It is crucial to understand how these organisations differ in their speed of BIM technology adoption and the rationale for this difference. The purpose of this paper is to investigate the potential causes of the digital divide and suggest solutions for bridging the gap.

Design/methodology/approach

Using mixed research method, data were collected through online questionnaire survey of over 240 global respondents as well as a semi-structured interview with nine experts for which statistical and thematic analyses were used, respectively.

Findings

Organisations can be zoned into “layers” and “levels” of BIM technology adoption and their size is not always significant in terms of the speed at which they adopt BIM. The digital divide is unequal across layers/levels and large organisations utilise technologies across the BIM maturity levels depending on project circumstances. A conceptual model for BIM technology was developed to aid identification of the “Laggards” and “Late Majority” from the “Innovators” through which change agents can customise adoption strategies for each group.

Originality/value

The developed model could serve as a tool for engagement and policy making and it contributes to the body of knowledge in the field of BIM technology adoption.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988