1 – 10 of 50Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…
Abstract
Purpose
The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.
Design/methodology/approach
Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.
Findings
Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.
Practical implications
This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.
Originality/value
This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.
Details
Keywords
Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…
Abstract
Purpose
The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.
Design/methodology/approach
To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.
Findings
The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.
Originality/value
This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.
Details
Keywords
This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance…
Abstract
Purpose
This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.
Design/methodology/approach
The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.
Findings
This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.
Originality/value
The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.
Details
Keywords
Sulakshya Gaur and Abhay Tawalare
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…
Abstract
Purpose
Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.
Design/methodology/approach
The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.
Findings
The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.
Research limitations/implications
The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.
Originality/value
The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.
Details
Keywords
Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes
This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…
Abstract
Purpose
This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.
Design/methodology/approach
A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.
Findings
The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.
Originality/value
Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.
Details
Keywords
Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…
Abstract
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.
Design/methodology/approach
A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.
Findings
An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.
Research limitations/implications
The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.
Originality/value
This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.
Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a…
Abstract
Purpose
The existing literature has been mainly focused on local problems but without an overall framework for studying the top-level planning of intelligent construction from a systematic perspective. The purpose of this paper is to fill this gap.
Design/methodology/approach
This research adopts a deductive research approach.
Findings
This research proposes a reference architecture and related business scenario framework for intelligent construction based on the existing theory and industrial practice.
Originality/value
The main contribution of this research is to provide a useful reference to the Chinese government and industry for formulating digital transformation strategies, as well as suggests meaningful future research directions in the construction industry.
Details
Keywords
Jobaer Al Mahmud, Shamsul Arefin and Md Imtiaz Ahmmed
This study aims to examine the historical development, present state and potential future directions of the integration between building information modeling (BIM) and life cycle…
Abstract
Purpose
This study aims to examine the historical development, present state and potential future directions of the integration between building information modeling (BIM) and life cycle assessment (LCA) in the field of construction. Additionally, this paper identifies current problems while offering insight into worldwide BIM research trends.
Design/methodology/approach
This study uses text mining on unstructured abstracts, a novel approach not previously documented in BIM research. By conducting a comprehensive systematic assessment of academic literature, this work uses advanced bibliometric approaches to examine the developmental trajectory of the integration of BIM and LCA. The research incorporates co-citation and keyword co-occurrence mapping, providing a complex visual depiction of the interconnectedness of information across different periods.
Findings
The results of this analysis reveal the historical development of the integration of BIM and LCA, including its roots and the initial research that established the foundation for further investigations. The aforementioned seminal works signify the inception of the discipline, serving as a source of inspiration for current scholarly investigations. Currently, there is a complex network of interdisciplinary cooperation that can be observed, combining knowledge and perspectives from the fields of design, engineering, construction and sustainability.
Originality/value
This research contributes novelty to the scholarly discourse by offering a holistic and up-to-date panorama of the dynamic BIM and LCA research landscape. It identifies emerging trends, influential contributors and uncharted territories, thus providing a foundation for scholars to contribute meaningfully to the advancement of knowledge in sustainable construction practices.
Details
Keywords
Arka Ghosh, Jemal Abawajy and Morshed Chowdhury
This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the…
Abstract
Purpose
This study aims to provide an excellent overview of current research trends in the construction sector in digital advancements. It provides a roadmap to policymakers for the effective utilisation of emergent digital technologies and a need for a managerial shift for its smooth adoption.
Design/methodology/approach
A total of 3,046 peer-reviewed journal review articles covering Internet of Things (IoT), blockchain, building information modelling (BIM) and digital technologies within the construction sector were reviewed using scientometric mapping and weighted mind-map analysis techniques.
Findings
Prominent research clusters identified were: practice-factor-strategy, system, sustainability, BIM and construction worker safety. Leading countries, authors, institutions and their collaborative networks were identified with the UK, the USA, China and Australia leading this field of research. A conceptual framework for an IoT-based concrete lifecycle quality control system is provided.
Originality/value
The study traces the origins of the initial application of Industry 4.0 concepts in the construction field and reviews available literature from 1983 to 2021. It raises awareness of the latest developments and potential landscape realignment of the construction industry through digital technologies conceptual framework for an IoT-based concrete lifecycle quality control system is provided.