Article
Publication date: 1 April 2024

Zoubeir Lafhaj, Slim Rebai, Olfa Hamdi, Rateb Jabbar, Hamdi Ayech and Pascal Yim

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of…

Abstract

Purpose

This study aims to introduce and evaluate the COPULA framework, a construction project monitoring solution based on blockchain designed to address the inherent challenges of construction project monitoring and management. This research aims to enhance efficiency, transparency and trust within the dynamic and collaborative environment of the construction industry by leveraging the decentralized, secure and immutable nature of blockchain technology.

Design/methodology/approach

This paper employs a comprehensive approach encompassing the formulation of the COPULA model, the development of a digital solution using the ethereum blockchain and extensive testing to assess performance in terms of execution cost, time, integrity, immutability and security. A case analysis is conducted to demonstrate the practical application and benefits of blockchain technology in real-world construction project monitoring scenarios.

Findings

The findings reveal that the COPULA framework effectively addresses critical issues such as centralization, privacy and security vulnerabilities in construction project management. It facilitates seamless data exchange among stakeholders, ensuring real-time transparency and the creation of a tamper-proof communication channel. The framework demonstrates the potential to significantly enhance project efficiency and foster trust among all parties involved.

Research limitations/implications

While the study provides promising insights into the application of blockchain technology in construction project monitoring, future research could explore the integration of COPULA with existing project management methodologies to broaden its applicability and impact. Further investigations into the solution’s scalability and adaptation to various construction project types and sizes are also suggested.

Originality/value

This research offers a comprehensive blockchain solution specifically tailored for the construction industry. Unlike prior studies focusing on theoretical aspects, this paper presents a practical, end-to-end solution encompassing model formulation, digital implementation, proof-of-concept testing and validation analysis. The COPULA framework marks a significant advancement in the digital transformation of construction project monitoring, providing a novel approach to overcoming longstanding industry challenges.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 9 November 2023

Abdulmohsen S. Almohsen, Naif M. Alsanabani, Abdullah M. Alsugair and Khalid S. Al-Gahtani

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the…

Abstract

Purpose

The variance between the winning bid and the owner's estimated cost (OEC) is one of the construction management risks in the pre-tendering phase. The study aims to enhance the quality of the owner's estimation for predicting precisely the contract cost at the pre-tendering phase and avoiding future issues that arise through the construction phase.

Design/methodology/approach

This paper integrated artificial neural networks (ANN), deep neural networks (DNN) and time series (TS) techniques to estimate the ratio of a low bid to the OEC (R) for different size contracts and three types of contracts (building, electric and mechanic) accurately based on 94 contracts from King Saud University. The ANN and DNN models were evaluated using mean absolute percentage error (MAPE), mean sum square error (MSSE) and root mean sums square error (RMSSE).

Findings

The main finding is that the ANN provides high accuracy with MAPE, MSSE and RMSSE a 2.94%, 0.0015 and 0.039, respectively. The DNN's precision was high, with an RMSSE of 0.15 on average.

Practical implications

The owner and consultant are expected to use the study's findings to create more accuracy of the owner's estimate and decrease the difference between the owner's estimate and the lowest submitted offer for better decision-making.

Originality/value

This study fills the knowledge gap by developing an ANN model to handle missing TS data and forecasting the difference between a low bid and an OEC at the pre-tendering phase.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 4 November 2022

Alan J. McNamara, Sara Shirowzhan and Samad M.E. Sepasgozar

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study…

Abstract

Purpose

This paper aims to identify the relevant contributing constructs of readiness for the implementation of intelligent contracts (iContracts) in the construction industry. This study investigates the relationship between the personality dimensions of technology readiness index (TRI) and the system specific factors of technology acceptance model (TAM) within the context of iContracts.

Design/methodology/approach

Drawing insights from the extant literature and the author's previous qualitative investigations into iContract readiness constructs, a quantitative approach is used to operationalise the constructs by offering relevant statements to be measured and validated through a multiple-item scale against the users intent to accept the future iContract technology.

Findings

This study confirms and validates the relationship of the proposed iContract readiness index (iCRI) statements against the established TAM factors by offering 18 new constructs influencing technology readiness of the iContract technology. This study proves 9 of the 12 hypotheses highlighting key factors to be addressed for the successful development of the iContract technology.

Practical implications

This paper contributes to the body of knowledge by proposing a novel iCRI that informs an iContract technology readiness acceptance model (iCTRAM) for a trending technology. The iCTRAM can guide developers in producing an appropriate iContract solution and assess the readiness of users and organisations for the successful adoption of the iContract concept.

Originality/value

This study offers a unique theoretical framework, in an embryonic field, for predicting the success of iContract implementation within construction organisations. This study combines the established studies of TRI and TAM in producing a predictive iContract readiness assessment tool.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 November 2022

Babar Ali, Ajibade A. Aibinu and Vidal Paton-Cole

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and…

Abstract

Purpose

Delay and disruption claims involve a complex process that often result in disputes, unnecessary expenses and time loss on construction projects. This study aims to review and synthesize the contributions of previous research undertaken in this area and propose future directions for improving the process of delay and disruption claims.

Design/methodology/approach

This study adopted a holistic systematic review of literature following Preferred Reporting Items for Systematic Reviews and Meta-Analysis guidelines. A total of 230 articles were shortlisted related to delay and disruption claims in construction using Scopus and Web of Science databases.

Findings

Six research themes were identified and critically reviewed including delay analysis, disruption analysis, claim management, contract administration, dispute resolution and delay and disruption information and records. The systematic review showed that there is a dearth of research on managing the wide-ranging information required for delay and disruption claims, ensuring the transparency and uniformity in delay and disruption claims’ information and adopting an end-user’s centred research approach for resolving the problems in the process of delay and disruption claims.

Practical implications

Complexities in delay and disruption claims are real-world problems faced by industry practitioners. The findings will help the research community and industry practitioners to prioritize their energies toward information management of delay and disruption claims.

Originality/value

This study contributes to the body of knowledge in delay and disruption claims by identifying the need for conducting more research on its information requirements and management. Subsequently, it provides an insight on the use of modern technologies such as drones, building information modeling, radio frequency identifiers, blockchain, Bigdata and machine learning, as tools for more structured and efficient attainment of required information in a transparent and consistent manner. It also recommends greater use of design science research approach for delay and disruption claims. This will help to ensure delay and disruption claims are the least complex and less dispute-prone process.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 26 April 2024

Luís Jacques de Sousa, João Poças Martins and Luís Sanhudo

Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s…

Abstract

Purpose

Factors like bid price, submission time, and number of bidders influence the procurement process in public projects. These factors and the award criteria may impact the project’s financial compliance. Predicting budget compliance in construction projects has been traditionally challenging, but Machine Learning (ML) techniques have revolutionised estimations.

Design/methodology/approach

In this study, Portuguese Public Procurement Data (PPPData) was utilised as the model’s input. Notably, this dataset exhibited a substantial imbalance in the target feature. To address this issue, the study evaluated three distinct data balancing techniques: oversampling, undersampling, and the SMOTE method. Next, a comprehensive feature selection process was conducted, leading to the testing of five different algorithms for forecasting budget compliance. Finally, a secondary test was conducted, refining the features to include only those elements that procurement technicians can modify while also considering the two most accurate predictors identified in the previous test.

Findings

The findings indicate that employing the SMOTE method on the scraped data can achieve a balanced dataset. Furthermore, the results demonstrate that the Adam ANN algorithm outperformed others, boasting a precision rate of 68.1%.

Practical implications

The model can aid procurement technicians during the tendering phase by using historical data and analogous projects to predict performance.

Social implications

Although the study reveals that ML algorithms cannot accurately predict budget compliance using procurement data, they can still provide project owners with insights into the most suitable criteria, aiding decision-making. Further research should assess the model’s impact and capacity within the procurement workflow.

Originality/value

Previous research predominantly focused on forecasting budgets by leveraging data from the private construction execution phase. While some investigations incorporated procurement data, this study distinguishes itself by using an imbalanced dataset and anticipating compliance rather than predicting budgetary figures. The model predicts budget compliance by analysing qualitative and quantitative characteristics of public project contracts. The research paper explores various model architectures and data treatment techniques to develop a model to assist the Client in tender definition.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 November 2022

Andrew Ebekozien and Mohamad Shaharudin Samsurijan

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the…

Abstract

Purpose

Studies showed that digital technology applications in the construction industry are low, especially in many developing nations. Construction incentivisation (CI) is one of the long-standing principles adopted to enhance project performance. There is a paucity of studies concerning CI to improve digital technology applications. Thus, this research investigated the relevance and perceived hindrances that may hinder the implementation of CI from promoting digital technologies and proffer ways to improve digital technology applications in the construction sector.

Design/methodology/approach

In Nigeria’s context, this research is exploratory. Twenty-four semi-structured virtual interviews were conducted in Lagos and Abuja, Nigeria, with knowledgeable participants that indicated interest and were interviewed. The engaged interviewees were drawn from government agencies, academicians in construction consultancy, Internet and communication technology experts, construction contracting firms and construction consulting firms. The collected data were coded and analysed through a thematic method.

Findings

Digitalisation of the industry via CI may face some hindrances. The perceived issues that may hinder CI implementation were classified into most severe, severe and fairly severe in Nigeria’s construction industry context. Findings proffer feasible policy solutions that can mitigate these issues and improve digital technology applications in the industry via the CI.

Research limitations/implications

This study covered the relevance and perceived issues that may hinder the implementation of the CI to improve digital technology applications in the industry. Also, the study proffers policy solutions to enhance digital technology applications in the industry via the CI concept.

Practical implications

Findings from this research will support and offer a valuable understanding of the relevance of the “incentivisation concept” to improve digital technology applications in the Nigerian-built environment. Other developing countries with low applications of digital technology in construction may consider the suggested policy solutions from this research. Also, this study will stir policymakers and construction practitioners to support policies tailored towards improving digital technology applications in construction.

Originality/value

This research contributes by exploring the effectiveness of the CI concept and informing construction practitioners and policymakers on how to improve digital technology applications in the Nigerian construction industry.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Murali Jagannathan, Vijayeta Malla, Venkata Santosh Kumar Delhi and Venkatesan Renganaidu

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid…

Abstract

Purpose

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid conflicts turning into disputes, the parties need to be proactive in identifying and resolving conflicts in their nascent stages. It is here that innovative lean construction practices can potentially act as a game-changer to avoid disputes, and this study aims to attempt to understand this phenomenon empirically.

Design/methodology/approach

A questionnaire-based empirical study, followed by semi-structured interviews, is conducted to understand the relevance of key tenets of lean principles in dispute avoidance.

Findings

Although stakeholders agree on the usefulness and practicality of lean principles in dispute avoidance, the extent of agreement is lesser when it comes to its implementation practicality. Moreover, there is a demographic influence observed on lean tenets such as “open communication”, “stakeholder collaboration” and “constraint identification”.

Practical implications

The results point towards an approach that combines contractual mandate, training and awareness creation to iron out the differences in the usefulness and practicality of lean approaches to avoid disputes.

Originality/value

Lean implementation is widely discussed in many construction contexts, such as sustainability, productivity improvement and planning. However, a discussion on lean philosophy’s role in dispute avoidance is muted. Therefore, this study assumes significance.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 April 2024

Elaine Pinto Varela Alberte and Gabriel de Oliveira Novelli

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and…

Abstract

Purpose

This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and strategies to improve the Brazilian sector through blockchain technology (BT).

Design/methodology/approach

The study collected empirical data through semi-structured interviews with consumers and distributors to identify how the CSCM functions today. The interviews were structured and analyzed around the following topics: processes, digitalization, quality and weakness of the activities performed. The opportunities for using BT in CSCM were identified by crossing these results with evidence in the bibliography.

Findings

The study identified deficiencies, gaps and good practices applied to information management in the sector. Also, it analyzed the features, drivers and barriers of BT from a practical perspective. The findings suggested that BT is feasible and promising, reducing costs and enhancing process transparency. The need to overcome cultural and economic barriers is a challenging task.

Originality/value

This study brings a new perspective on using BT in CSCM, relating it to the demands and particularities of the construction sector in Brazil. The study identifies a limited panorama of chronic CSCM concerns, given BT’s infinite opportunities. And it motivates a gradual transition toward installing a new technological culture based on BT that focuses on priority care for the sector’s chronic deficiencies. The results can guide practical actions for the successful insertion of BT in the CSCM, laying the foundations for significant future research.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 20 February 2024

Huy Minh Vo, Jyh-Bin Yang and Veerakumar Rangasamy

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus…

Abstract

Purpose

Construction projects commonly encounter complicated delay problems. Over the past few decades, numerous delay analysis methods (DAMs) have been developed. There is no consensus on whether existing DAMs effectively resolve delays, particularly in the case of complex concurrent delays. Thus, the primary objective of this study is to undertake a comprehensive and systematic literature review on concurrent delays, aiming to answer the following research question: Do existing delay analysis techniques deal with concurrent delays well?

Design/methodology/approach

This study conducts a comprehensive review of concurrent delays by both bibliometric and systematic analysis of research publications published between 1982 and 2022 in the Web of Science (WoS) and Scopus databases. For quantitative analysis, a bibliometric mapping tool, the VOSviewer, was employed to analyze 68 selected publications to explore the co-occurrence of keywords, co-authorship and direct citation. Additionally, we conducted a qualitative analysis to answer the targeted research question, identify academic knowledge gaps and explore potential research directions for solving the theoretical and practical problems of concurrent delays.

Findings

Concurrent delays are a critical aspect of delay claims. Despite DAMs developed by a limited number of research teams to tackle issues like concurrence, float consumption and the critical path in concurrent delay resolution, practitioners continue to face significant challenges. This study has successfully identified knowledge gaps in defining, identifying, analyzing and allocating liability for concurrent delays while offering promising directions for further research. These findings reveal the incompleteness of available DAMs for solving concurrent delays.

Practical implications

The outcomes of this study are highly beneficial for practitioners and researchers. For practitioners, the discussions on the resolution process of concurrent delays in terms of identification, analysis and apportionment enable them to proactively address concurrent delays and lay the groundwork for preventing and resolving such issues in their construction projects. For researchers, five research directions, including advanced DAMs capable of solving concurrent delays, are proposed for reference.

Originality/value

Existing research on DAMs lacks comprehensive coverage of concurrent delays. Through a scientometric review, it is evident that current DAMs do not deal with concurrent delays well. This review identifies critical knowledge gaps and offers insights into potential directions for future research.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords