Article
Publication date: 9 December 2019

Lei Zhu, Ming Shan and Zhao Xu

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage…

1137

Abstract

Purpose

Although the handover stage is the key transition stage between the construction and operation, there is no critical overview of issues and research at the handover stage, hindering the achievement of sustainable development of buildings. Therefore, the purpose of this paper is to review the building handover-related issues and research in construction and facility management (FM) journals. The specific objectives of this study include: analyze the research trends and overview the handover-related publications; identify the major research topics on the handover of buildings; identify research gaps and propose future research directions.

Design/methodology/approach

This study opted for a four-step systematic review of papers from the well-known academic journals in the construction and FM respects.

Findings

The results first revealed the increasing research interest in the handover of buildings from the researchers. Moreover, the post-construction defects, poor information fidelity, poor interoperability between building information modeling (BIM) and FM technologies, and insufficient consideration of end users were identified as the most concerned challenges for a building handover. Furthermore, identifying and formalizing information requirements for handover, improving the handover process, and improving the interoperability between BIM and FM were solutions mostly emphasized by researchers.

Research limitations/implications

As the first systematic review of building handover-related issues and research, this study is the building block for future research on this topic. The findings provide guidance for researchers in the construction and FM research community, and help them form useful collaboration for future research opportunities and find future research directions.

Practical implications

The identified significant challenges and potential solutions for a building handover could assist practitioners in making rational decisions on developing or adopting relevant technologies, and reshaping their management patterns and working processes. Moreover, the findings could be severed as evidence for policymakers to initiate policies, such as documents e-submission and timely updating BIMs, to achieve the vision of model-based project delivery.

Originality/value

This study contributed to the body of knowledge of sustainable development by providing a new insight to tackle the hindrance to the smooth transition from the construction to the operation.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 May 2024

Janet Chang and Ajith Parlikad

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap…

Abstract

Purpose

Global building failures, such as the Grenfell Tower fire in London, UK, emphasised the need for trustworthy building handover information for safety. However, a notable gap remains in understanding how reliable handover information can ensure the safety of occupants. This study aims to investigate the use and essential quality of handover information to understand the effects of the quality of information on the management of commercial buildings.

Design/methodology/approach

Ninety-four participants from nine organisations who regularly use handover information to manage multiple commercial buildings participated in the semi-structured interviews. Qualitative thematic coding using interview transcripts was performed to identify the utilisation of handover information and its quality requirements.

Findings

This study reveals that as-built drawings and product information are predominately used to fulfil statutory obligations, comply with the organisation’s internal policies, evaluate asset valuation and make informed decisions about capital investment and operating expenses. The quality dimensions of “accuracy”, “timeliness”, and “completeness” are preferred in combination to achieve desired outcomes.

Research limitations/implications

This study focused on using handover information in the management of commercial buildings. However, its results can offer valuable perspectives for improving its application across various sectors in the built environment.

Practical implications

The findings affirm the need for quality handover information for safety, compliance and efficient management in commercial buildings.

Originality/value

This research significantly contributes to the current knowledge of handover information in the building sector. Given the study findings, building owners are equipped to define specific handover information requirements and quality requisites.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 26 June 2019

Marjan Sadeghi, Jonathan Weston Elliott, Nick Porro and Kelly Strong

This paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver…

1713

Abstract

Purpose

This paper aims to represent the results of a case study to establish a building information model (BIM)-enabled workflow to capture and retrieve facility information to deliver integrated handover deliverables.

Design/methodology/approach

The Building Handover Information Model (BHIM) framework proposed herein is contextualized given the Construction Operation Information Exchange (COBie) and the level of development schema. The process uses Autodesk Revit as the primary BIM-authoring tool and Dynamo as an add-in for extending Revit’s parametric functionality, BHIM validation, information retrieval and documentation in generating operation and maintenance (O&M) deliverables in the end-user requested format.

Findings

Given the criticality of semantics for model elements in the BHIM and for appropriate interoperability in BIM collaboration, each discipline should establish model development and exchange protocols that define the elements, geometrical and non-geometrical information requirements and acceptable software applications early in the design phase. In this case study, five information categories (location, specifications, warranty, maintenance instructions and Construction Specifications Institute MasterFormat division) were identified as critical for model elements in the BHIM for handover purposes.

Originality/value

Design- and construction-purposed BIM is a standard platform in collaborative architecture, engineering and construction practice, and the models are available for many recently constructed facilities. However, interoperability issues drastically restrict implementation of these models in building information handover and O&M. This study provides essential input regarding BIM exchange protocols and collaborative BIM libraries for handover purposes in collaborative BIM development.

Details

Journal of Facilities Management , vol. 17 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 4 March 2024

Janet Chang, Klaudia Jaskula, Eleni Papadonikolaki, Dimitrios Rovas and Ajith Kumar Parlikad

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction…

Abstract

Purpose

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction phase. The significance of effective management of handover information is highlighted by global building failures, such as the Grenfell Tower fire in London, UK. Despite existing technological interventions, there remains a paucity of understanding regarding the factors contributing to the decline in the quality of handover information during the post-construction phase.

Design/methodology/approach

This study employed a multi-case studies approach across five higher education institutions. It involved conducting semi-structured interviews with 52 asset management professionals, uncovering the underlying reasons for the decline in handover information quality. Building on these insights, the study performed a mapping exercise to align these identified factors with blockchain technology features and information quality dimensions, aiming to evaluate blockchain’s potential in managing quality handover information.

Findings

The study findings suggest that blockchain technology offers advantages but has limitations in addressing all the identified quality issues of managing handover information. Due to the lack of an automated process and file-based information exchange, updating handover information still requires an error-prone manual process, leading to potential information loss. Additionally, no solutions are available for encoding drawings for updates and validation.

Originality/value

This study proposes a framework integrating blockchain to enhance the information management process and improve handover information quality.

Details

Built Environment Project and Asset Management, vol. 14 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 5 March 2018

Adeline Zhu Teng Tan, Atiq Zaman and Monty Sutrisna

The purpose of this study is to investigate ways of transferring knowledge and information during the life-cycle phases of construction projects, particularly between the…

1985

Abstract

Purpose

The purpose of this study is to investigate ways of transferring knowledge and information during the life-cycle phases of construction projects, particularly between the construction and occupancy phases, and to find an approach to minimise knowledge and information gaps during the handover process.

Design/methodology/approach

The study applied a qualitative approach involving a literature review and an archival analysis of information flow in the studied cases of a construction project, followed by a cross-cases analysis and expert interviews. Data on information flow were collected from three cases of building construction projects in Perth, Western Australia. In addition, a total of 18 local facilities management experts were interviewed to identify the key reasons of knowledge and information gaps and to propose an effective knowledge flow model.

Findings

The findings of this study indicated a significant knowledge and information gap, which exists during the handover process in construction projects in Western Australia. The findings of case analysis and expert interviews identified that the project handover guidelines were often ignored in construction projects in Western Australia, and the handover phase was not given the same priority as the design and construction phases by most of the project stakeholders, which led to information and knowledge gaps between the project construction and post-occupancy phases. The study conducted, integrated knowledge and information flow modelling to analyse the knowledge and information gaps followed by mapping the gaps against existing knowledge sharing frameworks (KSFs) before proposing an integrated knowledge sharing conceptual model to improve current practice and to enhance the information flow during the various phases of the construction project life cycle.

Research limitations/implications

The study is based on three cases in Perth, Western Australia, and thus the findings and recommendations are contextual. Whilst laying a good foundation to do so, further research is needed to investigate more cases in Western Australia and beyond to fully generalise the findings from this study.

Originality/value

The study contributes to improve the handover process and information flows in project life-cycle phases in Western Australia and develop an information flow model followed by bringing together existing KSFs, namely, the open communication channel (OCC), soft landing framework (SLF) and building information modelling (BIM), to propose an integrated knowledge sharing conceptual model. The methodology used here to analyse the information flow in a diagrammatic manner, the mapping of FM issues against the KSFs’ capabilities and a conceptual model to facilitate change in the industry’s silo mindset are the main contributions of this paper.

Details

Facilities, vol. 36 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 18 September 2019

Rajat Gupta, Matthew Gregg and Rohini Cherian

The field of building performance evaluation (BPE) forms a fragmented whole with tools and methods that are not widely applicable. In response, the purpose of this paper is to…

Abstract

Purpose

The field of building performance evaluation (BPE) forms a fragmented whole with tools and methods that are not widely applicable. In response, the purpose of this paper is to develop and demonstrate a novel BPE framework to bring consistency and flexibility in evaluating actual building performance.

Design/methodology/approach

The paper critically reviews and evaluates existing BPE methods and techniques and situates them in different building life stages. Using a hierarchical approach, a “BPE framework” is devised for new and existing buildings as well as refurbishments. The working of the BPE framework is demonstrated by applying it to four discreet BPE studies to enable cross-comparison of different BPE approaches based on their stage of application, depth and duration of BPE investigations.

Findings

The framework is designed to have four graduated levels starting at the “basic” level and developing incrementally to “core”, “comprehensive” and “advanced” levels, thereby focussing on “need to know” rather than “nice to have”. The framework also offers a mechanism to map different types of BPE studies with varying scope and content.

Practical implications

As we enter a world of smart meters and smart buildings, we are transitioning into a new future of understanding building performance. The study helps to better understand which BPE method can be used to study what aspect of building performance and in what building lifecycle stage, against time, cost and user expertise.

Originality/value

The graduated and flexible framework helps to bring consistency in evaluating building performance in an otherwise fragmented field, to help improve building performance.

Details

International Journal of Building Pathology and Adaptation, vol. 38 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 1 March 2019

Agnieszka Zalejska Jonsson and Rosane Hungria Gunnelin

The purpose of this paper is to present defects reported by cooperative owners, and to determine the relationship between building characteristics, developer’s/contractor’s…

1773

Abstract

Purpose

The purpose of this paper is to present defects reported by cooperative owners, and to determine the relationship between building characteristics, developer’s/contractor’s company size and defect type.

Design/methodology/approach

The analysis is based on defects reported by board members of cooperatives in Sweden through a survey questionnaire. The 1,563 questionnaires were posted by regular mail to the boards of cooperatives for buildings. The current research presents results from analysis of responses from 394 regular residential projects constructed between 2006 and 2013. The responses represent owners’ experience from a total 1,107 buildings.

Findings

Findings presented in this study indicate that building quality might be one of the factors contributing to the energy gap. The analysis indicates that the most severe problems reported by cooperatives are issues related to building envelope, particularly shortcomings in the function of windows, issues related to the function of the balcony and cracks in the facade and leakage caused by rain water. The results show that the building quality differs depending on developers’ size, measured by number of employees. The authors have also found a significant relationship between reported defects and location expressed by size of the city/municipality.

Originality/value

The discussion on newly constructed residential buildings has been dominated by the perspective of professionals (inspectors) and contractors (or developers) rather than of the owners/users themselves. This study presents findings from the owners’ perspective, thus contributing the owners’ viewpoint to the debate on building quality.

Details

International Journal of Building Pathology and Adaptation, vol. 37 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 15 November 2018

Ahmed Alnaggar and Michael Pitt

The purpose of this paper is to investigate a systematic methodology to manage asset data flow between building stakeholders throughout building life cycle using the Construction…

1788

Abstract

Purpose

The purpose of this paper is to investigate a systematic methodology to manage asset data flow between building stakeholders throughout building life cycle using the Construction Operation Building Information Exchange (COBie) standard.

Design/methodology/approach

A literature review of the relevant building information modelling (BIM) for facilities management (FM) studies including the gaps and challenges of producing COBie data is analysed. Then a standard project management methodology by Project Management Institute (PMI) is introduced as a theoretical framework to map the different areas of managing COBie data as a project in coordination with Royal Institute of British Architects (RIBA) Plan of work. This theoretical background is coupled with an inductive approach through the placement within a construction company (Bouygues, UK) in the UCLH construction project to produce the conceptual framework that is aligned with industry needs.

Findings

The lack of well-structured approach to manage COBie data throughout building life cycle causes many problems and confusions about the roles and responsibilities of different stakeholders in creating and managing asset data. This confusion in turn results in incomplete and low-quality COBie data at the handover phase which hinders the ability of facility managers to use these data effectively in the operations phase. The proposed conceptual framework provides a standard project management process to systemise the data flow among all stakeholders.

Practical implications

The proposed framework is developed in liaison with a large construction company, so it is well aligned with an actual industry approach to managing COBie data. Furthermore, it provides a systematic step-by-step approach to managing COBie as a project that could be easily implemented in actual construction projects.

Originality/value

The paper introduced a novel approach to manage COBie data using a standard project management methodology based on an actual live construction project perspective coupled with project management theory.

Article
Publication date: 4 September 2017

Nethmin Malshani Pilanawithana and Y.G. Sandanayake

Facilities Management (FM) is a dynamic profession, which supports core business functions by creating cost-effective and risk-free built environment aligned with the strategic…

2062

Abstract

Purpose

Facilities Management (FM) is a dynamic profession, which supports core business functions by creating cost-effective and risk-free built environment aligned with the strategic business directives throughout the building life cycle. This study aims to investigate and position the Facilities Manager’s role during building life cycle based on the stages of RIBA Plan of Work 2013.

Design/methodology/approach

A literature survey and in-depth interviews with experts were used to investigate the role of a Facilities Manager at the different stages of RIBA Plan of Work 2013. The gathered data were analysed using content analysis technique to explore the role of a Facilities Manager.

Findings

Research findings assert that advising the Client on cost-effective building expansion options as a vital role of a Facilities Manager at Strategic Definition stage. Further, briefing the Client’s requirement is a foremost undertaking of a Facilities Manager at Preparation and Brief stage. During the Concept Design and Developed Design stages, Facilities Manager plays a key role in value engineering exercises to ensure value for client?s money and also prepares operations and maintenance strategies to be used at the In Use stage. Moreover, Facilities Manager must have a technical training on buildings, services and systems at Handover stage to manage them at the In Use stages.

Originality/value

The role of a Facilities Manager identified in this study can be used as a guide by the Clients and project teams in obtaining their services during the building life cycle to enhance building performance.

Details

Journal of Facilities Management, vol. 15 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 1 August 2019

Sandra Matarneh, Mark Danso-Amoako, Salam Al-Bizri, Mark Gaterell and Rana Matarneh

The purpose of this study is to address challenges in the current information exchange process between building information modelling (BIM) and facilities management (FM) systems…

1293

Abstract

Purpose

The purpose of this study is to address challenges in the current information exchange process between building information modelling (BIM) and facilities management (FM) systems and to propose a workable solution. This study’s objective is to identify the information exchange requirements and to develop methods for seamless information flow between building information models and FM systems.

Design/methodology/approach

Data collection and analysis was based on an extensive literature review of similar studies followed by a questionnaire survey with a total of 112 participants and 2 focus groups with a total of 12 participants to validate the conceptual framework. The outputs of the survey analysis formed the background of the proposed framework to streamline information exchange process between building information models and FM systems.

Findings

The study findings form a foundation for enabling the integration of various data sources including building information models. Such integrated platforms will enable automated information exchange between the various data sources and FM systems. The study also provides key information requirements sources to complement the existing construction operations building information exchange information and to support standardization for information exchange process.

Originality/value

The contribution of this study is the identification of information exchange requirements and sources to enable seamless information flow between BIM and FM systems. The study findings will also lay the basis for research studies using the developed framework context to enable the identification of specific data outputs for FM systems inputs.

1 – 10 of over 1000