Article
Publication date: 13 May 2020

Ying Xia

This study aims to analyze the dynamic monitoring of deformation damage of steel structure buildings in long-term use. Although the steel structure building has the advantage of…

Abstract

Purpose

This study aims to analyze the dynamic monitoring of deformation damage of steel structure buildings in long-term use. Although the steel structure building has the advantage of high structural strength, it will be deformed after being affected by factors such as corrosion and impact during long-term use, and which will affect building safety, especially the public building facilities. The dynamic monitoring of its security is an indispensable means.

Design/methodology/approach

This paper briefly introduced the principle of building information modeling (BIM)-based steel structure building information monitoring and the dynamic information monitoring system based on this principle. Then the monitoring system was used to analyze an operational steel structure suspension bridge in Xinxiang City, Henan Province, China, and compared it with the monitoring system based on back propagation (BP) neural network.

Findings

The results showed that the fitting degree of the dynamic deformation displacement data processed by BIM-based monitoring system was higher than that processed by BP-based monitoring system. Based on the comprehensive comparison of the dynamic data of all monitoring points, the BIM-based monitoring system had higher accuracy of deformation displacement monitoring and reliability of structural safety evaluation.

Originality/value

In summary, the BIM-based steel structure building monitoring system can effectively monitor the dynamic information of steel structure information.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 May 2023

Hongliang Yu, Zhen Peng, Zirui He and Chun Huang

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and…

114

Abstract

Purpose

The purpose of this paper is to establish a maturity evaluation model for the application of construction steel structure welding robotics suitable for the actual situation and specific characteristics of engineering projects in China and then to assess the maturity level of the technology in the application of domestic engineering projects more scientifically.

Design/methodology/approach

The research follows a qualitative and quantitative analysis method. In the first stage, the structure of the maturity model is constructed and the evaluation index system is designed by using the ideas of the capability maturity model and WSR methodology for reference. In the second stage, the design of the evaluation process and the selection of evaluation methods (analytic hierarchy process method, multi-level gray comprehensive evaluation method). In the third stage, the data are collected and organized (preparation of questionnaires, distribution of questionnaires, questionnaire collection). In the fourth stage, the established maturity evaluation model is used to analyze the data.

Findings

The evaluation model established by using multi-level gray theory can effectively transform various complex indicators into an intuitive maturity level or score status. The conclusion shows that the application maturity of building steel structure welding robot technology in this project is at the development level as a whole. The maturity levels of “WuLi – ShiLi – RenLi” are respectively: development level, development level, between starting level and development level. Comparison of maturity evaluation values of five important factors (from high to low): environmental factors, technical factors, management factors, benefit factors, personnel and group factors.

Originality/value

In this paper, based on the existing research related to construction steel structure welding robot technology, a quantitative and holistic evaluation of the application of construction steel structure welding robot technology in domestic engineering projects is conducted for the first time from a project perspective by designing a maturity evaluation index system and establishing a maturity evaluation model. This research will help the project team to evaluate the application level (maturity) of the welding robot in the actual project, identify the shortcomings and defects of the application of this technology, then improve the weak links pertinently, and finally realize the gradual improvement of the overall application level of welding robot technology for building steel structure.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 October 2020

Jiaqiang Chen

The main supporting frame of steel structure buildings is steel, and the beam-column joints of the steel structure directly affect the stability and strength of the supporting…

Abstract

Purpose

The main supporting frame of steel structure buildings is steel, and the beam-column joints of the steel structure directly affect the stability and strength of the supporting frame.

Design/methodology/approach

This paper briefly introduced the beam-column joints which are used for ensuring the stability of buildings in the steel structure building, selected the fabricated beam-column joints which were different from the traditional welding methods, tested the fabricated beam-column joints with the reaction frame and jack and detected the influence of the thickness and length of the splice plate on the mechanical properties of joints.

Findings

The results showed that the joint stress and the displacement in the vertical direction increased under greater load no matter which kind of fabricated joint was used; under the same load, the thickness and length of the splice significantly affected the mechanical properties of joints, and the larger the thickness and length, the smaller the joint stress and displacement in the vertical direction.

Originality/value

To sum up, increasing the thickness or length of the splice plate of the fabricated joint can effectively improve the mechanical properties of joints.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 17 May 2021

Jingyu Yu, Jingfeng Wang, Zhengmao Hua and Xingxing Wang

Airports are booming in China, to enlarge their capacities and stimulate economic development. Large-span spatial steel structures are commonly used in the terminal buildings of…

Abstract

Purpose

Airports are booming in China, to enlarge their capacities and stimulate economic development. Large-span spatial steel structures are commonly used in the terminal buildings of airport projects. Their advantages include prefabrication, strength, usability, adaptability and aesthetic quality. To manage large-span spatial steel structure projects, building information modeling (BIM) is recommended. Although there are plenty of studies on BIM application in steel structure projects, it is still rare to apply BIM to optimize the schedule and cost of steel structures, especially for airport projects.

Design/methodology/approach

This paper aims to develop a framework in which BIM and a time-cost optimization model are integrated to optimize construction costs and the duration of large-span spatial steel structure projects. A real case study was conducted to verify the feasibility of the BIM-based time-cost optimization model in an airport terminal building, which was built with a large-span spatial steel structure.

Findings

The results preliminarily support the reliability of the proposed BIM-based time-cost optimization model. The BIM-based time-cost optimization model will benefit construction planning for professionals and enrich relevant research on the application of BIM in large-span spatial steel structure projects.

Originality/value

The steel structure is difficult to control budgets and progress. This paper is expected to be adopted for optimizing the time and cost plans for projects involving steel structures in airport terminal buildings.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 16 June 2023

Sou-Sen Leu, Kuang-Jen Huang, Cathy Chang-Wei Hung and Pei-Lin Wu

In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size…

Abstract

Purpose

In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size, complexity and location. The steel structure change ratio in Taiwan is from 1 to 18% in statistics. The contractors always put every possible effort into preventing or mitigating project cost overruns, and one of the approaches is an accurate cost overrun risk estimate. Traditional project cost overrun risk assessment models mainly focus on macro-level evaluation and may not function well for the project-specific level (micro-level). This study creates a network-like connection model between the outcome (i.e. cost overrun risk) and the associated root causes in which the project status evaluation checklists of design, manufacturing, construction and interfaces are used to evaluate the checklists' influences through the Bayesian network (BN) composed by intermediate causes.

Design/methodology/approach

Due to the constraint of data availability, BN nodes, relationships and conditional probabilities are defined to establish a BN-based steel building project cost overrun assessment model following the knowledge of experts. Because of the complexity of the BN, the construction of the BN structure is first to build BN's fault tree (FT) hierarchy. And then, basic BN framework is constructed by the transformation of the FT hierarchy. Furthermore, some worthwhile additional arcs among BN nodes are inserted if necessary. Furthermore, conditional probability tables (CPTs) among BN nodes are explored by experts following the concept of the ranked node. Finally, the BN-based model was validated against the final cost analysis reports of 15 steel building projects done in Taiwan and both were highly consistent. The overall BN-based model construction process consists of three steps: (1) FT construction and BN framework transformation, (2) CPT computation and (3) model validation.

Findings

This study established a network-like bridge model between the outcome (i.e. cost overrun risk) and the root causes in a network of which cost influences are evaluated through the project-specific status evaluation checklists of design, manufacturing, construction and interfaces. This study overcame several limitations of the previous cost overrun risk assessment models: (1) few past research support assessment of cost overrun based on real-time project-owned data and (2) the traditional causal models inadequately depict interdependencies among influence factors of cost overrun at the network. The main influence factors of the cost overrun risk at the steel building projects in Taiwan were also examined using sensitivity analysis. The main root causes of cost overrun in steel building projects are design management and interface integration.

Originality/value

The proposed model belongs to the project-specific causal assessment model using real-time project-owned status checklist data as input. Such a model was seldom surveyed in the past due to the complicated interdependence among causes in the network. For practical use, a convenient and simple regression equation was also developed to forecast the cost overrun risk of the steel building project based on the root causes as input. Based on the analysis of cost overrun risk and significant influence factors, proper tailor-made preventive strategies are established to reduce the occurrence of cost overrun at the project.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 October 2019

Zijing Wang

Special shaped columns composed of concrete-filled square steel tubes have broad application prospects in steel structure residential buildings. The paper aims to discuss this…

Abstract

Purpose

Special shaped columns composed of concrete-filled square steel tubes have broad application prospects in steel structure residential buildings. The paper aims to discuss this issue.

Design/methodology/approach

In this paper, the thermal bridge problem of special-shaped column structures is studied, T-shaped column composed of concrete-filled square steel tubes is taken as an example, the finite element thermal bridge model is established by ANSYS software, the heat treatment is calculated by the software and the results are output.

Findings

According to the finite element results, it can be found that in the thermal bridge model, the temperature distribution is uniform, the heat flux density is small and the heat dissipation where the steel plate locates is serious. The lowest temperature of the thermal bridge is greater than the air condensation temperature, and the affected area is about 0.2 m, which is larger than the thickness of the wall and will not cause too much impact on the wall. It will help to suppress heat dissipation and achieve energy-saving and heat preservation inside the buildings.

Originality/value

The experimental results prove the effectiveness of the special-shaped column structure for building energy-saving buildings. This study provides some theoretical basis for further application of special-shaped column structures in architecture.

Details

International Journal of Building Pathology and Adaptation, vol. 38 no. 3
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 9 December 2021

Riza Suwondo, Lee Cunningham, Martin Gillie, Made Suangga and Irpan Hidayat

The robustness of building structures in a fire has recently drawn wide attention. This study presents the progressive collapse analysis of steel frame building structures under…

Abstract

Purpose

The robustness of building structures in a fire has recently drawn wide attention. This study presents the progressive collapse analysis of steel frame building structures under localised fire. The main objective of this study is to propose methods to enhance the structural collapse resistance of such structures in fire.

Design/methodology/approach

A modelling method was developed and validated against both experimental and analytical studies. Then, a series of robustness analyses were performed to investigate the interaction among the members and the pattern of load distribution within the structures. These analyses show that lateral resistance and load redistribution have a vital role in the robustness of the building. Thus, two approaches have been adopted to enhance the robustness of the focused steel frame during a fire.

Findings

It is found that increased size of floor beams and vertical bracing systems are effective measures in preventing whole structure collapse. The larger beam section is able to prevent catenary action so that the load in the failed columns can safely transfer to the adjacent columns without buckling. On the other hand, the bracing system improves the lateral resistance that can accommodate the lateral force when catenary action occurs in the beam.

Originality/value

Previous studies have focused on the collapse mechanism of steel frame structures. However, the parameters affecting the structural robustness in a fire have not yet been explored. To address this gap, this study adopted numerical modelling to undertake parametric studies to identify effective methods to improve the robustness of such structures under fire conditions.

Details

Journal of Structural Fire Engineering, vol. 13 no. 3
Type: Research Article
ISSN: 2040-2317

Keywords

Article
Publication date: 7 December 2023

Mohammed Jazeel, Sam Paul P., Lawrance Gunaraj and Hemalatha G.

Nowadays, in building structures, dampers are connected to the building structure to reduce the damages caused by seismicity in addition to enhancing structural stability, and to…

37

Abstract

Purpose

Nowadays, in building structures, dampers are connected to the building structure to reduce the damages caused by seismicity in addition to enhancing structural stability, and to connect dampers with the structure, joints are used. In this paper, three different configurations of double-lap joints were designed, developed and tested.

Design/methodology/approach

This paper aims to analyze three different categories of double-lap single-bolted joints that are used in connecting dampers with concrete and steel frame structures. These joints were designed and tested using computational, numerical and experimental methods. The studies were conducted to examine the reactions of the joints during loading conditions and to select the best joints for the structures that allow easy maintenance of the dampers and also withstand structural deformation when the damper is active during seismicity. Also, a computational analysis was performed on the designed joints integrated with the M25 concrete beam column junction. In this investigation, experimental study was carried out in addition to numerical and computational methods during cyclic load.

Findings

It was observed from the result that during deformation the double-base multiplate lap joint was suitable for buildings because the deformations on the joint base was negligible when compared with other joints. From the computational analysis, it was revealed that the three double joints while integrated with the beam column junction of M25 grade concrete structure, the damages induced by the double-base multiplate joint was negligible when compared with other two joints used in this study.

Originality/value

To prevent the collapse of the building during seismicity, dampers are used and further connecting the damper with the building structures, joints are used. In this paper, three double-lap joints in different design configuration were studied using computational, numerical and experimental techniques.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 6 February 2020

Ruochen Zeng, Abdol Chini and Robert Ries

As green building movement is widespread throughout the world, low-energy building becomes the standard. A designer's selection of building systems and materials during early…

1033

Abstract

Purpose

As green building movement is widespread throughout the world, low-energy building becomes the standard. A designer's selection of building systems and materials during early design phase becomes more important. It is essential that designers include embodied energy and emissions among other criteria they use in selecting materials during the design development phase of a building. The aim of this study is to develop a model to integrate the embodied energy, embodied emissions, and cost of the alternative structure and envelope systems of a building during the design development stage.

Design/methodology/approach

A conceptual model is proposed to integrate the embodied energy, embodied emissions, and cost of the alternative structure and envelope systems of a building. A case study is used to test the proposed model in predicting the embodied impacts and cost of structure and envelope systems for an educational building.

Findings

The proposed model can assist designers in making informed decisions at the early design stage and selecting alternative structure and envelope systems considering embodied impacts and costs.

Social implications

Designers consider reducing embodied impacts of buildings during early design phase as an important social responsibility, especially for megaprojects, which have great impact on our daily life.

Originality/value

Development of a model that can be used to support design decisions regarding sustainable design (embodied energy and embodied carbon emissions) and costs of buildings in early design phase.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 May 2023

Rakesh Sai Kumar Mandala and R. Ramesh Nayaka

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also…

Abstract

Purpose

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also providing long-term sustainable benefits that are desperately needed in today's construction industry.

Design/methodology/approach

The need for housing is growing worldwide, but traditional construction cannot cater to the demand due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society. This paper presented a state-of-the-art review of modern construction techniques practiced worldwide and their advantages in affordable housing construction by conducting a systematic literature review and applying the backward snowball technique. The paper reviews modern prefabrication techniques and interlocking systems such as modular construction, formwork systems, light gauge steel/cold form steel construction and sandwich panel construction, which have been globally well practiced. It was understood from the overview that modular construction, including modular steel construction and precast concrete construction, could reduce time and costs efficiently. Further enhancement in the quality was also noticed. Besides, it was observed that light gauge steel construction is a modern phase of steel that eases construction execution efficiently. Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time, which leads to faster construction than traditional formwork. However, the cost is subjected to the repetitions of the formwork. An interlocking system is an innovative approach to construction that uses bricks made of sustainable materials such as earth that conserve time and cost.

Findings

The study finds that the prefabrication techniques and interlocking system have a lot of unique attributes that can enable the modern construction sector to flourish. The study summarizes modern construction techniques that can save time and cost, enhancing the sustainability of construction practices, which is the need of the Indian construction industry in particular.

Research limitations/implications

This study is limited to identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Practical implications

Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time which leads to faster construction than traditional formwork.

Social implications

The need for housing is growing rapidly all over the world, but traditional construction cannot cater to the need due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society.

Originality/value

This study is unique in identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords