BIM-based time-cost optimization of a large-span spatial steel structure in an airport terminal building

Jingyu Yu (School of Civil Engineering, Hefei University of Technology, Hefei, China)
Jingfeng Wang (Department of Civil Engineering, Hefei University of Technology, Hefei, China)
Zhengmao Hua (School of Civil Engineering, Hefei University of Technology, Hefei, China)
Xingxing Wang (School of Civil Engineering, Hefei University of Technology, Hefei, China)

Journal of Facilities Management

ISSN: 1472-5967

Article publication date: 17 May 2021

Issue publication date: 31 May 2022

450

Abstract

Purpose

Airports are booming in China, to enlarge their capacities and stimulate economic development. Large-span spatial steel structures are commonly used in the terminal buildings of airport projects. Their advantages include prefabrication, strength, usability, adaptability and aesthetic quality. To manage large-span spatial steel structure projects, building information modeling (BIM) is recommended. Although there are plenty of studies on BIM application in steel structure projects, it is still rare to apply BIM to optimize the schedule and cost of steel structures, especially for airport projects.

Design/methodology/approach

This paper aims to develop a framework in which BIM and a time-cost optimization model are integrated to optimize construction costs and the duration of large-span spatial steel structure projects. A real case study was conducted to verify the feasibility of the BIM-based time-cost optimization model in an airport terminal building, which was built with a large-span spatial steel structure.

Findings

The results preliminarily support the reliability of the proposed BIM-based time-cost optimization model. The BIM-based time-cost optimization model will benefit construction planning for professionals and enrich relevant research on the application of BIM in large-span spatial steel structure projects.

Originality/value

The steel structure is difficult to control budgets and progress. This paper is expected to be adopted for optimizing the time and cost plans for projects involving steel structures in airport terminal buildings.

Keywords

Citation

Yu, J., Wang, J., Hua, Z. and Wang, X. (2022), "BIM-based time-cost optimization of a large-span spatial steel structure in an airport terminal building", Journal of Facilities Management, Vol. 20 No. 3, pp. 469-484. https://doi.org/10.1108/JFM-12-2020-0097

Publisher

:

Emerald Publishing Limited

Copyright © 2021, Emerald Publishing Limited

Related articles