Doris Entner, Thorsten Prante, Thomas Vosgien, Alexandru-Ciprian Zăvoianu, Susanne Saminger-Platz, Martin Schwarz and Klara Fink

The paper aims to raise awareness in the industry of design automation tools, especially in early design phases, by demonstrating along a case study the seamless integration of a…

1682

Abstract

Purpose

The paper aims to raise awareness in the industry of design automation tools, especially in early design phases, by demonstrating along a case study the seamless integration of a prototypically implemented optimization, supporting design space exploration in the early design phase and an in operational use product configurator, supporting the drafting and detailing of the solution predominantly in the later design phase.

Design/methodology/approach

Based on the comparison of modeled as-is and to-be processes of ascent assembly designs with and without design automation tools, an automation roadmap is developed. Using qualitative and quantitative assessments, the potentials and benefits, as well as acceptance and usage aspects, are evaluated.

Findings

Engineers tend to consider design automation for routine tasks. Yet, prototypical implementations support the communication and identification of the potential for the early stages of the design process to explore solution spaces. In this context, choosing from and interactively working with automatically generated alternative solutions emerged as a particular focus. Translators, enabling automatic downstream propagation of changes and thus ensuring consistency as to change management were also evaluated to be of major value.

Research limitations/implications

A systematic validation of design automation in design practice is presented. For generalization, more case studies are needed. Further, the derivation of appropriate metrics needs to be investigated to normalize validation of design automation in future research.

Practical implications

Integration of design automation in early design phases has great potential for reducing costs in the market launch. Prototypical implementations are an important ingredient for potential evaluation of actual usage and acceptance before implementing a live system.

Originality/value

There is a lack of systematic validation of design automation tools supporting early design phases. In this context, this work contributes a systematically validated industrial case study. Early design-phases-support technology transfer is important because of high leverage potential.

Details

Journal of Engineering, Design and Technology , vol. 17 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 February 2020

Ruochen Zeng, Abdol Chini and Robert Ries

As green building movement is widespread throughout the world, low-energy building becomes the standard. A designer's selection of building systems and materials during early

1032

Abstract

Purpose

As green building movement is widespread throughout the world, low-energy building becomes the standard. A designer's selection of building systems and materials during early design phase becomes more important. It is essential that designers include embodied energy and emissions among other criteria they use in selecting materials during the design development phase of a building. The aim of this study is to develop a model to integrate the embodied energy, embodied emissions, and cost of the alternative structure and envelope systems of a building during the design development stage.

Design/methodology/approach

A conceptual model is proposed to integrate the embodied energy, embodied emissions, and cost of the alternative structure and envelope systems of a building. A case study is used to test the proposed model in predicting the embodied impacts and cost of structure and envelope systems for an educational building.

Findings

The proposed model can assist designers in making informed decisions at the early design stage and selecting alternative structure and envelope systems considering embodied impacts and costs.

Social implications

Designers consider reducing embodied impacts of buildings during early design phase as an important social responsibility, especially for megaprojects, which have great impact on our daily life.

Originality/value

Development of a model that can be used to support design decisions regarding sustainable design (embodied energy and embodied carbon emissions) and costs of buildings in early design phase.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 23 December 2022

Rouzbeh Shabani, Tobias Onshuus Malvik, Agnar Johansen and Olav Torp

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end…

2039

Abstract

Purpose

Uncertainty management (UM) in projects has been a point of attention for researchers for many years. Research on UM has mainly been aimed at uncertainty analyses in the front-end and managing uncertainty in the construction phase. In contrast, UM components in the design phase have received less attention. This research aims to improve knowledge about the key components of UM in the design phase of large road projects.

Design/methodology/approach

This study adopted a literature review and case study. The literature review was used to identify relevant criteria for UM. These criteria helped to design the interview guide. Multiple case study research was conducted, and data were collected through document study and interviews with project stakeholders in two road projects. Each case's owners, contractors and consultants were interviewed individually.

Findings

The data analysis obtained helpful information on the involved parties, process and exploit tools and techniques during the design phase. Johansen's (2015) framework [(a) human and organisation, (b) process and (c) tools and techniques)] was completed and developed by identifying relevant criteria (such as risk averse or risk-taker, culture and documentation level) for each component. These criteria help to measure UM performance. The authors found that owners and contractors are major formal UM actors, not consultants. Empirical data showed the effectiveness of Web-based tools in UM.

Research limitations/implications

The studied cases were Norwegian, and this study focussed on uncertainties in the project's design phase. Relevant criteria did not cover all the criteria for evaluating the performance of UM. Qualitative evaluation of criteria allows further quantitative analysis in the future.

Practical implications

This paper gave project owners and managers a better understanding of relevant criteria for measuring UM in the owners and managers' projects. The paper provides policy-makers with a deeper understanding of creating rigorous project criteria for UM during the design phase. This paper also provides a guideline for UM in road projects.

Originality/value

This research gives a holistic evaluation of UM by noticing relevant criteria and criteria's interconnection in the design phase.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 30 July 2018

Ki Pyung Kim and Kenneth Sungho Park

The purpose of this study is to identify building information modelling (BIM) input data sets within a BIM-embedded housing refurbishment process and enable construction…

Abstract

Purpose

The purpose of this study is to identify building information modelling (BIM) input data sets within a BIM-embedded housing refurbishment process and enable construction professionals to use BIM as an information management platform for housing refurbishment projects.

Design/methodology/approach

A hypothetical case study using BIM tools for a housing refurbishment project is adopted to identify BIM input data sets to create a housing information model within a BIM system. Reliability of the research outcome is examined by conducting a comparative analysis between existing and simulated research outcomes.

Findings

This research identifies essential BIM input data sets during the early design phase. The importance of a well-integrated housing information model containing accurate as-built condition, cost and thermal performance information is essential to use BIM for housing refurbishment. BIM can be feasible for housing refurbishment when an information-enriched housing information model is constructed. Furthermore, the capability of BIM that can enable key project stakeholders to determine the most affordable refurbishment solution among various alternatives is identified as BIM can provide reliable cost estimations and thermal performance of refurbishment alternatives at the early design stage.

Research limitations/implications

The examined refurbishment processes and input data sets are confined to the early design phases as BIM use for housing refurbishment is limited.

Practical implications

This research will contribute to use BIM for housing refurbishment by providing essential BIM input data sets and BIM-embedded refurbishment processes.

Originality/value

This research reveals primary housing information data sets and BIM-embedded refurbishment processes at the early design phase.

Details

Journal of Facilities Management, vol. 16 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 9 July 2021

Phuoc Luong Le and Nguyen Thi Duc Nguyen

To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management (CSCM…

1267

Abstract

Purpose

To deal with the present situation and recover after the COVID-19 pandemic, construction firms are required to recognise the trends in construction supply chain management (CSCM) for the upcoming years and determine the appropriate practices towards the trends for the improvement of construction activities in terms of strategy, tactic and operations. This paper aims to recognise key trends in CSCM and uses these trends as strategic criteria for the evaluation and prioritisation of lean construction (LC) tools at different project phases including design and architectural engineering, planning and control, on-site construction and safety management.

Design/methodology/approach

The integrated analytic hierarchy process–Delphi method is used to collect and analyse the data from construction experts to evaluate the importance levels of the CSCM trends and recommend the appropriate tools for LC practices to improve project performances.

Findings

Seven key CSCM trends are identified: lean supply chain management (SCM), supply chain (SC) integration, SC standardisation, SC problem-solving, SC information-sharing, SC flexibility and SC sustainability. Based on these trends, a set of prioritised lean tools are suggested for LC practices, in which “virtual design construction” (VDC) and “last planner system” are considered as the central tools. These two LC practices can be integrated with other effective tools to support the strategic, tactical and operational targets in construction supply chain (CSC) projects.

Research limitations/implications

This study gives the managerial implications by developing an application framework of LC practices for CSC projects. The framework promotes “VDC” as a strategic tool for the phase of design and architectural engineering and considers “last planner system” as the central LC practice for the phase of project planning and control. The framework also focuses on the improvement of efficiency in construction operations by taking into account the aspects of on-site collaboration, problem-solving, improvement and safety.

Originality/value

Up to date, there is still a lack of researches in classifying and prioritising the significant LC tools for each project phase to deal with CSC issues in both breadth and depth. Thus, this study is performed to provide construction managers with the awareness of CSCM trends on which they can focus to have strategic criteria for selecting LC practices to improve CSC performances.

Details

International Journal of Lean Six Sigma, vol. 13 no. 3
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 3 May 2017

Valentina Zileska Pancovska, Silvana Petrusheva and Aleksandar Petrovski

Integrating the aspects of sustainability into facilities design has become a designers’ challenge, and the early design phase is seen as the most important in implementing…

Abstract

Purpose

Integrating the aspects of sustainability into facilities design has become a designers’ challenge, and the early design phase is seen as the most important in implementing sustainability into facilities design. Therefore, this paper aims to analyze the factors that influence sustainability assessment of preliminary design of facilities and predicts sustainability assessment depending on those factors.

Design/methodology/approach

Data were collected by survey questionnaire distributed to project managers using a six-point Likert scale. Obtained data were modeled with general regression neural network (GRNN) using DTREG software. In total, 27 factors were chosen for determining the most accurate predictive model, and their importance was computed.

Findings

The six most important factors for sustainability assessment of facilities design are: work experience, work on several outline design proposals, resolving issues between stakeholders, prioritization of participants in the design phase, procurement management and defining projects’ program and goals. The predictive model that was used for prediction of the sustainability assessment was shown to be highly accurate, with MAPE (mean absolute percentage error) amounting to 2.58 per cent.

Practical implications

Using the same approach, assessment of every other factor for the preliminary design can be predicted and the factors that are most influential to its sustainability can be obtained.

Originality/value

The paper supports the sustainability improvement of the preliminary design of future facilities’ projects, as well as support during the decision-making process.

Details

Facilities, vol. 35 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 16 July 2018

Giuditta Pezzotta, Claudio Sassanelli, Fabiana Pirola, Roberto Sala, Monica Rossi, Sophia Fotia, Angelos Koutoupes, Sergio Terzi and Dimitris Mourtzis

Nowadays manufacturers companies are increasingly compelled to navigate towards servitization. Different methods and approaches were proposed in literature to support them to…

2167

Abstract

Purpose

Nowadays manufacturers companies are increasingly compelled to navigate towards servitization. Different methods and approaches were proposed in literature to support them to switch from traditional product-based business model to product service systems (PSSs). However, new knowledge, capabilities and skills were needed to consistently develop PSSs, since they need a joint focus on both customer’s perspective and company’s internal performance and at the same time a proper support for the integration of product and service design. The purpose of this paper is to propose the Product Service System Lean Design Methodology (PSSLDM), a structured methodology to develop PSSs along their entire lifecycle.

Design/methodology/approach

Retrieving concepts from interpretative, interactive and system development research traditions, and strongly reminding the design research methodology framework, the adopted research methodology is composed of three main phases (observation and conceptualization, theory building and tool development, validation) and involved three heterogeneous companies.

Findings

This paper provides an overview of the PSSLDM, explaining how the different methods supporting its conduction should contribute to properly design an integrated PSS. Moreover, companies highlighted several benefits in the different stages along the PSS lifecycle deriving by the adoption of the PSSLDM.

Research limitations/implications

The development of a platform based on the PSSLDM methodology raises a discussion on the possible changes needed by current Product Lifecycle Management (PLM) models and systems when they have to do with PSSs.

Originality/value

The PSSLDM enriches the already proposed SErvice Engineering Methodology, introducing new several components linked by lean rules in each of its phases (starting from customer analysis, going through solution concept and detailed design, until the offering analysis) and better supprting the deatil design of both prodcut and service components.

Details

Journal of Manufacturing Technology Management, vol. 29 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 9 July 2020

Sepehr Abrishami, Jack Goulding and Farzad Rahimian

The integration and automation of the whole design and implementation process have become a pivotal factor in construction projects. Problems of process integration, particularly…

1313

Abstract

Purpose

The integration and automation of the whole design and implementation process have become a pivotal factor in construction projects. Problems of process integration, particularly at the conceptual design stage, often manifest through a number of significant areas, from design representation, cognition and translation to process fragmentation and loss of design integrity. Whilst building information modelling (BIM) applications can be used to support design automation, particularly through the modelling, amendment and management stages, they do not explicitly provide whole design integration. This is a significant challenge. However, advances in generative design now offer significant potential for enhancing the design experience to mitigate this challenge.

Design/methodology/approach

The approach outlined in this paper specifically addresses BIM deficiencies at the conceptual design stage, where the core drivers and indicators of BIM and generative design are identified and mapped into a generative BIM (G-BIM) framework and subsequently embedded into a G-BIM prototype. This actively engages generative design methods into a single dynamic BIM environment to support the early conceptual design process. The developed prototype followed the CIFE “horseshoe” methodology of aligning theoretical research with scientific methods to procure architecture, construction and engineering (AEC)-based solutions. This G-BIM prototype was also tested and validated through a focus group workshop engaging five AEC domain experts.

Findings

The G-BIM prototype presents a valuable set of rubrics to support the conceptual design stage using generative design. It benefits from the advanced features of BIM tools in relation to illustration and collaboration (coupled with BIM's parametric change management features).

Research limitations/implications

This prototype has been evaluated through multiple projects and scenarios. However, additional test data is needed to further improve system veracity using conventional and non-standard real-life design settings (and contexts). This will be reported in later works.

Originality/value

Originality and value rest with addressing the shortcomings of previous research on automation during the design process. It also addresses novel computational issues relating to the implementation of generative design systems, where, for example, instead of engaging static and formal description of the domain concepts, G-BIM actively enhances the applicability of BIM during the early design stages to generate optimised (and more purposeful) design solutions.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 September 2019

Ayman Ahmed Ezzat Othman and Sherouk Mohamed Abdelrahim

The purpose of this paper is to investigate the role of Value Management towards achieving sustainability through reducing the construction waste during the design process.

1510

Abstract

Purpose

The purpose of this paper is to investigate the role of Value Management towards achieving sustainability through reducing the construction waste during the design process.

Design/methodology/approach

To achieve the abovementioned aim, a research methodology consisting literature review and survey questionnaire is designed to achieve the following objectives: first, building a comprehensive understanding of the research topic through reviewing literature related to the nature of the construction industry, waste in construction, sustainability, the design phase and Value Management; second, presenting and analysing two case studies to validate the role of Value Management towards reducing waste in construction projects; third, conducting a survey questionnaire with a representative sample of architectural design firms (ADFs) in Egypt to evaluate their perception and application of Value Management towards reducing the construction waste during the design phase; and finally, proposing a business improvement framework to facilitate the integration of Value Management into the design phase as an approach for reducing construction waste.

Findings

The construction waste has a negative impact on achieving sustainability objectives. The design process plays a major role in generating waste throughout the project life cycle. This is a result of improper decisions taken during the design phase. Egypt as a developing country does not have the required technical or financial resources to deal with the huge amount of waste generated during the construction process. The Egyptian Sustainable Development Strategy 2030 focussed on eradicating the waste from its source (i.e. design phase). Integrating Value Management into the design phase will help developing creative ideas and better decisions, which will enable achieving sustainability objectives and reducing construction waste.

Originality/value

The Egyptian Sustainable Development Strategy 2030 has discussed the importance of dealing with the wastes from the source. Although the construction waste is a dangerous type of waste, most research studies have not focussed on the design process as a source for the construction waste. In this research, the design phase was discussed as an important element in reducing the construction waste by using Value Management approach.

Details

Journal of Engineering, Design and Technology, vol. 18 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 1 September 1998

Saskia M. de Theije, Peter C. Sander and Aarnout C. Brombacher

Because of the importance of the product design process, a good control of it is of vital importance. It is shown how design tests can be defined and executed that are able to…

1873

Abstract

Because of the importance of the product design process, a good control of it is of vital importance. It is shown how design tests can be defined and executed that are able to identify quality problem. Emphasis will be on the early detection of reliability problems. The quality control method itself and the results reached at Philips Electronics Industries‐Consumer Electronics Division (PEI‐CED) in Taiwan will be discussed. First, the organisation of a design process and design reliability evaluation program in general will be considered. Next, it will be explained what opportunities for improvement of reliability control in the design process at PEI‐CED were detected. A risk analysis, aimed at identifying reliability risks and analysing them, will be the basis for the reliability tests that will be elaborated next.

Details