Search results

1 – 10 of 52
Article
Publication date: 20 April 2022

Michael McCarney, Chris Ian Goodier and Alistair Gibb

This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom

Abstract

Purpose

This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom construction.

Design/methodology/approach

A literature review identified 16 process and people factors. A mixed method approach was used to analyse data from eight offsite bathroom case study projects. A ranking approach determined the main process and people factors, consequently analysed using (Minitab) Frequency analysis, the Wilcoxon Signed Rank test and thematic analysis to establish the contributing sub-factors and their inter-relationships, to each other and to the literature. These factors and sub-factors formed the final conceptual model, bringing together interface management and offsite bathroom construction.

Findings

The nine factors instrumental to the conceptual model include six process factors: procurement, design management, supply chain management, health and safety, tolerance and quality and three people factors: communication, client/design team and project manager, reflecting the construction industry focus on hard processes over soft. The role of the project manager and communication, however, are the main factors which contribute to overall project success. Direct management of the offsite works by the contractor’s project manager is also highly significant.

Research limitations/implications

Limitations include the (UK) geographical focus of the research and the focus on bathroom pods in buildings.

Social implications

The research recognises three people (social) factors: communication, client/design team and project manager, with the first and third being the main factors which contribute to overall project success.

Originality/value

Originality stems from the focus on organisational interface management and how this relates to offsite bathroom construction (a practice gaining considerable momentum in industry) and the resultant model. Being grounded on more than one body of academic literature as well as 8 case studies and 82 industry interviews, there is value to both researchers and construction industry practitioners alike.

Details

Construction Innovation , vol. 23 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 January 2009

Wei Pan and Alistair G.F. Gibb

Offsite is one of the main innovative techniques employed in the contemporary UK construction sector. Building maintenance accounts for over 5 percent of the UK's gross domestic…

1732

Abstract

Purpose

Offsite is one of the main innovative techniques employed in the contemporary UK construction sector. Building maintenance accounts for over 5 percent of the UK's gross domestic product of which bathrooms are regarded as a critical area, with potential high risks and defects. However, the importance of its maintenance has been largely underestimated and research into this area appears to be limited. This paper aims to address this knowledge gap by investigating the maintenance performance of offsite and in situ bathrooms for student accommodation.

Design/methodology/approach

The paper examines 732 maintenance records over three years of 216 precast concrete modules, 84 Glass Reinforced Polyester (GRP) modules and 96 traditionally‐built in situ bathrooms.

Findings

The research found that offsite modules outperformed in situ bathrooms in terms of maintenance. GRP modules created the least maintenance problems, compared to precast modules and in situ bathrooms. The maintenance of in situ bathrooms was more complex than offsite modules, and involved more diverse problematic areas. The main causes of the problems included inappropriate design; poor build workmanship, lack of quality of component materials and improper usage by occupants. This supports a parallel study that found that the costs associated with maintenance were significantly higher for in situ bathrooms than for the equivalent offsite solutions.

Research limitations/implications

The paper contributes to understanding the problems of offsite bathroom modules requiring maintenance in comparison with in situ bathrooms and their possible causes. Key aspects of offsite bathrooms including drainage, toilets, vents and sinks should be improved. Quality of component materials used for in situ bathrooms should be ensured. These improvements can only be achieved through better design for maintenance with clients' aspiration embodied. The findings should assist in design decision making of selecting bathrooms for residential buildings. However, a balanced approach, taking into account other factors for such selection, is open for future investigation.

Originality/value

The framework of strategies developed should improve the innovative design of bathrooms manufactured offsite and help maintain them for better lifecycle performance.

Details

Construction Innovation, vol. 9 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 February 2021

Joseph Kwame Ofori-Kuragu and Robert Osei-Kyei

The purpose of this paper is to explore the current state of popular modern methods of construction (MMC) and pre-manufactured construction in the construction industry and…

1289

Abstract

Purpose

The purpose of this paper is to explore the current state of popular modern methods of construction (MMC) and pre-manufactured construction in the construction industry and propose a framework for future implications for practice and future research.

Design/methodology/approach

This technical paper is based on a narrative review of the extant literature on the subject. First, the Scopus search engine was used to retrieve relevant papers on MMC, offsite and pre-manufactured construction. Second, institutional literature such as reports by industry professional and trade bodies, literature from leading technology firms and contractors with experience of MMC were extracted. These two strands of literature were synthesised and a comprehensive discussion on the topic was provided.

Findings

Results show that journal publications on MMC and pre-manufactured construction have increased in the past decade. The paper found significant advances in the development of premanufactured and offsite construction approaches with many benefits. Offsite and pre-manufactured construction are viable and sustainable systems currently suitable for wider adoption as the mainstream construction method.

Research limitations/implications

This technical paper based on an integrative review of relevant literature could have benefitted from interviews of professionals with experience of offsite and pre-manufacture techniques and from wider availability of current academic publications on the subject. Validation of the framework has not been undertaken.

Originality/value

Not much-published work has been undertaken on the current state of development globally and the viability of these construction approaches. This paper evaluates evidence from academic and industry sources to address this gap. A framework has been developed which can help the industry’s industrialisation drive.

Article
Publication date: 12 February 2021

Tong Lin, Sainan Lyu, Rebecca Jing Yang and Linda Tivendale

Prefabricated housing has become a boom industry across the world; however, the uptake of offsite construction (OSC) approaches in Australian low-rise buildings is rather low…

1526

Abstract

Purpose

Prefabricated housing has become a boom industry across the world; however, the uptake of offsite construction (OSC) approaches in Australian low-rise buildings is rather low compared with high-rise buildings in other countries. This study aims to investigate and analyse the adoption of different levels of OSC approaches and the selection of different procurement options in Australian low-rise residential buildings.

Design/methodology/approach

The research objectives were pursued through a mixed research method. An empirical questionnaire survey was carried out with 35 professionals in the Australian building and construction industry. Semi-structured interviews were conducted with 20 interviewees and analysed using thematic analysis method in NVivo software.

Findings

The research results found that the most suitable OSC level for Australian low-rise buildings is components-based prefabrication and identified the barriers to OSC uptake for each OSC level. The study also showed that the best option of procuring prefabricated products is from Australian manufacturers, followed by Australian suppliers/dealers and overseas manufacturers. Panelised prefabrication and components-based prefabrication are ranked as the most suitable OSC approaches for Australian manufacturers. Modular prefabrication is regarded as the most suitable for overseas manufacturer, while components-based prefabrication is the most suitable for Australian suppliers/dealers.

Originality/value

The selection of various OSC approaches and different procurement options in the low-rise residential buildings are scarcely explored topic, and thus, this study provides knowledge of interest for both researchers and practitioners.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 October 2016

Sherif Mostafa, Nicholas Chileshe and Tariq Abdelhamid

The purpose of this study is to systematically analyse and synthesise the existing research published on offsite manufacturing/construction. The study aims to highlight and…

4385

Abstract

Purpose

The purpose of this study is to systematically analyse and synthesise the existing research published on offsite manufacturing/construction. The study aims to highlight and associate the core elements for adopting the offsite concept in different construction contexts. This ultimately facilitates the enhancement of the offsite uptake.

Design/methodology/approach

The research study was carried out through a systematic literature review (SLR). The SLR was conducted to identify and understand the existing themes in the offsite research landscape, evaluate contributions and compile knowledge, thereby identifying potential directions of future research. The grand electronic databases were explored to gather literature on the offsite concept, lean and agile principles and simulation. A total of 62 related articles published between 1992 and 2015 have been included in this study. The relevant literature was systematically analysed and synthesised to present the emerging offsite themes.

Findings

The descriptive and thematic analyses presented in this paper have identified related offsite research studies that have contributed to setting a firm foundation of the offsite concept in different construction contexts. Each of the 62 articles was examined for achieving the aim and objectives of this study, the method of data collection and coverage of offsite themes. The results of the analyses revealed that the articles mostly provide information on the offsite concept and its definitions (53 per cent) and offsite barriers and/or drivers (27 per cent). However, limited attention has been paid to the integration of lean and agile principles (13 per cent) and simulation (7 per cent) within the offsite concept, which are therefore more open to research within the offsite concept.

Research limitations/implications

The literature review highlights the main themes and components of the offsite construction concept. This forms a solid basis and motivation for researchers and practitioners to build on to enhance the uptake of the offsite concept in different contexts. This study also presents a research roadmap within the offsite concept, along with a recommendation for further research to be conducted using the research framework proposed in this study. The framework could lead to validation of using simulation to integrate lean and agile principles within the offsite concept.

Originality/value

This paper presents a systematic review of the literature related to offsite construction in different contexts. The emerging components, that is, offsite definitions, drivers and/or barriers, lean and agile principles and simulation have been highlighted and discussed thematically. A research framework that enables pursuit of the integration of lean and agile principles offsite through the lens of simulation has been proposed. The framework is expected to open up new opportunities on the effectiveness of offsite development in different contexts.

Article
Publication date: 3 August 2021

Tarek Salama, Ahmad Salah and Osama Moselhi

The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical…

1077

Abstract

Purpose

The purpose of this paper is to present a new method for project tracking and control of integrated offsite and onsite activities in modular construction considering practical characteristics associated with this type of construction.

Design/methodology/approach

The design embraces building information modelling and integrates last planner system (LPS), linear scheduling method (LSM) and critical chain project management (CCPM) to develop tracking and control procedures for modular construction projects. The developed method accounts for constraints of resources continuity and uncertainties associated with activity duration. Features of proposed method are illustrated in a case example for tracking and control of modular projects.

Findings

Comparison between developed schedule and Monte Carlo simulation showed that baseline duration generated from simulation exceeds that produced by developed method by 12% and 10% for schedules with 50% and 90% confidence level, respectively. These percentages decrease based on interventions of members of project team in the LPS sessions. The case example results indicate that project is delayed 5% and experienced cost overrun of 2.5%.

Originality/value

Developed method integrated LPS, LSM and CCPM while using metrics for reliability assessment of linear schedules, namely, critical percent plan complete (PPCcr) and buffer index (BI). PPCcr and BI measure percentage of plan completion for critical activities and buffer consumption, respectively. The developed method provides a systematic procedure for forecasting look-ahead schedules using forecasting correction factor Δt and a newly developed tracking and control procedure that uses PPCcr and BI. Quantitative cost analysis is also provided to forecast and monitor project costs to prove the robustness of proposed framework.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 April 2023

Wajiha Mohsin Shahzad, Siddenki Mahender Reddy, Ravindu Kahandawa and James Olabode Bamidele Rotimi

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption…

Abstract

Purpose

The ascendancy of modular offsite construction (MOSC) over traditional construction methods is well known. Despite the known potential of this construction approach, its adoption is minimal in New Zealand construction industry. This article investigates the potential benefits of using MOSC for delivery of high-rise buildings in New Zealand, underlying factors responsible for its low uptake and the measures that can facilitate its improved uptake.

Design/methodology/approach

This study utilised a mixed research approach. An empirical questionnaire survey was carried out with New Zealand construction industry professionals with expertise in MOSC. Factor analysis of survey data was carried out using SPSS software. Semi-structured interviews were carried out with subject matter experts to get further insights and expand the survey findings. Interview data were analysed using thematic analysis.

Findings

Study identified benefits of MOSC, thus establishing potential of its uptake for high-rise building construction. Constraining factors were investigated, most pronounced being low level of skills in construction industry to design, manufacture and integrate supply chain of MOSC, high initial investment, high cost of importing modules and negative perception about offsite manufactured buildings. This study also highlighted the enablers to improve uptake of MOSC. These enablers included; loan and mortgage policies to suit MOSC paradigm, building regulations to support OSC industry, increased support from the government and awareness and acceptance of standardised building designs among the clients.

Originality/value

Originality of this paper harps from little to no research carried out to investigate use of MOSC for high-rise buildings in New Zealand context.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 November 2022

Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…

Abstract

Purpose

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.

Design/methodology/approach

A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.

Findings

The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.

Originality/value

To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 December 2019

Kudirat Olabisi Ayinla, Franco Cheung and Abdel-Rahman Tawil

This study aims to develop a more inclusive working definition and a formalised classification system for offsite construction to enable common basis of evaluation and…

1024

Abstract

Purpose

This study aims to develop a more inclusive working definition and a formalised classification system for offsite construction to enable common basis of evaluation and communication. Offsite manufacturing (OSM) is continuously getting recognised as a way to increase efficiency and boost productivity of the construction industry in many countries. However, the knowledge of OSM varies across different countries, construction practices and individual experts thus resulting into major misconceptions. The lack of consensus of what OSM is and what constitutes its methods creates a lot of misunderstanding across Architecture Engineering and Construction (AEC) industry professionals, therefore, inhibiting a global view and understanding for multicultural collaboration. Therefore, there is a need to revisit these issues with the aim to develop a deep understanding of the concepts and ascertain what is deemed inclusive or exclusive.

Design/methodology/approach

A state-of-the-art review and analysis of literature on OSM was conducted to observe trends in OSM definitions and classifications. The paper identifies gaps in existing methods and proposes a future direction.

Findings

Findings suggest that classifications are mostly aimed towards a particular purpose and existing classification system are not robust enough to cover all aspects. Therefore, there is need to extend these classification systems to be fit for various purposes.

Originality/value

This paper contributes to the body of literature on offsite concepts, definition and classification, and provides knowledge on the broader context on the fundamentals of OSM.

Article
Publication date: 11 January 2011

Wafaa Nadim and Jack S. Goulding

Recent calls were launched worldwide for the “revival” of offsite production (OSP) (under numerous nomenclatures) in order to improve the construction industry, meet market…

5601

Abstract

Purpose

Recent calls were launched worldwide for the “revival” of offsite production (OSP) (under numerous nomenclatures) in order to improve the construction industry, meet market demand; and furthermore, overcome the dependence on skilled labour. Despite the well‐documented benefits of OSP, the construction industry seems to be somewhat hesitant in effectively responding to those calls. Forming part of a triangulated research, this paper aims to explore the European Union (EU) construction industry main patterns of concern with regard to OSP. The findings from this paper are set to guide the development of an OSP training and education model (not reported in this paper).

Design/methodology/approach

A qualitative approach using the content analysis technique was employed to analyse secondary data (transcripts) from 54 open‐ended questionnaires carried out under the ManuBuild EU research project, to deeply explore the EU construction industry main perceptions/concerns which may represent a barrier to the wider uptake of OSP.

Findings

The EU construction industry reluctance to embrace OSP practices is largely attributable (amongst others) to the unsuccessful past experiences associated with this approach. While the findings were in line with extant literature “hard” issues/concerns such as cost and productivity, additional findings revealed “softer” issues/concerns such as the flexibility of the OSP approach, preservation of the identity of cities, and the ability to adapt OSP buildings to older generations' needs and requirements.

Originality/value

This paper condensed and synchronised all OSP‐related patterns of concern in a conceptual model. The model expanded on the well documented triad model of “people”, “technology”, and “process”; and further added the “product” and “market” pattern to it. Should all these main five OSP patterns of concerns be addressed, it is postulated that this would help support the wider uptake of OSP within the EU construction industry; and furthermore create a shared understanding between industry and training/education institutions to enable an OSP knowledgeable industry.

Details

Engineering, Construction and Architectural Management, vol. 18 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 52