Search results
1 – 10 of over 2000Betsy Stringam and John Gerdes
The purpose of this paper is to investigate how well hotel website load time performance compared against customer expectation benchmarks. In a competitive market, service…
Abstract
Purpose
The purpose of this paper is to investigate how well hotel website load time performance compared against customer expectation benchmarks. In a competitive market, service interactions are important. As customers move to mobile devices, the time to load a website is a critical part of the service delivery. Long load times can lead to poor service experiences, customer frustration and lost business. Hotel website load times on both mobile and desktop devices were examined and compared to service expectations.
Design/methodology/approach
The study used an online service to assess and compare website load performance using both desktop and mobile devices for 259 international hotel company and sub-brand websites.
Findings
The time to load hotel websites was significantly slower on mobile devices compared to desktops. Load times on both platforms exceeded 3 s, which is considered best practice. Long load times represent a service gap and can cause dissatisfaction resulting in a potential customer abandoning the website for a competitor’s site, thus affecting sales.
Research limitations/implications
While the population for the study was robust in size and contained most of the major hotel companies worldwide, it was not exhaustive. Data also represent a snapshot and will change over time. Load times vary based on test location, access device and network traffic. Additionally, web page load times and customer expectations will change as technology evolves.
Originality/value
Increased use of mobile devices for hotel reservations increases the importance of mobile service delivery. This is the first known study to measure hotel website load times for mobile devices, and to examine both mobile and desktop performance against best practice. The results of this study highlight a service gap, which can lead to loss of business. Given the consistency of the results, the authors suspect that this is an issue that has not been recognized within the industry. This study is valuable because it exposes an issue of website design not generally addressed in the hospitality industry, even though tools are available to monitor site performance.
Details
Keywords
The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…
Abstract
Purpose
The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.
Design/methodology/approach
The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.
Findings
Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.
Originality/value
Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.
Details
Keywords
Rosemary J. Hollick, Alison J. Black, David M. Reid and Lorna McKee
Using a complexity-informed approach, we aim to understand why introduction of a mobile service delivery model for osteoporosis across diverse organisational and country contexts…
Abstract
Purpose
Using a complexity-informed approach, we aim to understand why introduction of a mobile service delivery model for osteoporosis across diverse organisational and country contexts in the UK National Health Service (NHS) met with variable success.
Design/methodology/approach
Six comparative case studies; three prospectively in Scotland using an action research-informed approach; and three retrospectively in England with variable degrees of success. The Non-adoption, Abandonment, Scale-up, Spread and Sustainability framework explored interactions between multi-level contextual factors and their influence on efforts to introduce and sustain services.
Findings
Cross-boundary service development was a continuous process of adaptation and evolution in rapidly shifting healthcare context. Whilst the outer healthcare policy context differed significantly across cases, inner contextual features predominated in shaping the success or otherwise of service innovations. Technical and logistical issues, organisational resources, patient and staff actions combined in unpredictable ways to shape the lifecycle of service change. Patient and staff thoughts about place and access to services actively shaped service development. The use of tacit “soft intelligence” and a sense of “chronic unease” emerged as important in successfully navigating around awkward people and places.
Practical implications
“Chronic unease” and “soft intelligence” can be used to help individuals and organisations “tame” complexity, identify hidden threats and opportunities to achieving change in a particular context, and anticipate how these may change over time. Understanding how patients think and feel about where, when and how care is delivered provides unique insights into previously unseen aspects of context, and can usefully inform development and sustainability of patient-centred healthcare services.
Originality/value
This study has uniquely traced the fortunes of a single service innovation across diverse organisational and country contexts. Novel application of the NASSS framework enabled comparative analysis across real-time service change and historical failures. This study also adds to theories of context and complexity by surfacing the neglected role of patients in shaping healthcare context.
Details
Keywords
Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…
Abstract
Purpose
Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.
Design/methodology/approach
Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.
Findings
The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.
Originality/value
A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.
Details
Keywords
Abstract
Details
Keywords