Article
Publication date: 17 December 2021

Geraldine John Kikwasi

Claims are increasingly becoming a norm in construction projects and thus an area that is attracting interventions through researches. This paper aims to establish causes–effects

Abstract

Purpose

Claims are increasingly becoming a norm in construction projects and thus an area that is attracting interventions through researches. This paper aims to establish causes–effects relationship of claims in construction projects.

Design/methodology/approach

This is correlation study type of study that attempts to establish causes–effects relationship of claims in construction projects. Significant causes and effects of construction claims were determined using one-sample t-test. To establish the relationship, the significant causes and effects of construction claims were correlated using bivariate correlation analysis.

Findings

Among the significant causes, variations, change of scope of the project and delay in completion of works have high level of significant positive relationship with five to six other causes and positive relationship with multiple effects ranging from five to six. Besides, among significant effects, delay in completion and delivering of construction projects, poor contractual relationship among parties and extension of time have significant positive relationship with multiple causes.

Research limitations/implications

The findings of this study are limited to causes-causes relationship and causes–effects relationship of claims in construction projects. This means effectseffects relationship was not covered that could be an important area to investigate as some of causes and effects are at times termed interchangeably.

Practical implications

With reference to previous studies which have focused on determining the causes and effects of construction claims, the findings of the current study have specific contribution on claims management as it divulges the causes of constructions claims that have multiplier effects to the project as a result of their linkage.

Originality/value

The paper unveils causes of claims with multiplier effects to construction projects for project participants to devise strategies to minimize and consequently eliminate them.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 March 2017

Murali Sambasivan, T.J. Deepak, Ali Nasoor Salim and Venishri Ponniah

The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation…

1619

Abstract

Purpose

The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM).

Design/methodology/approach

This study was conducted in the construction industry in Tanzania. A questionnaire-based survey method was used. A total of 308 respondents participated in the study. The relationships between the cause and effect factors were analyzed using SEM.

Findings

The important findings are as follows:cost overrun can be explained by consultant-related and material-related factors; disputes can be explained by cost overrun; arbitration can be explained by consultant-related, cost overrun, and dispute factors; litigation can be explained by client-related, disputes, and arbitration factors; and abandonment can be explained by consultant-related, external-related, disputes, arbitration, and litigation factors.

Originality/value

The main contributions of this study are theoretical development and comprehensive analyses of “cause” and “effect” factors of delays in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 24 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 January 2015

Charles Teye Amoatey, Yaa Asabea Ameyaw, Ebenezer Adaku and Samuel Famiyeh

– The purpose of this paper is to assess the causes and effects of delays in public sector housing projects in Ghana.

4105

Abstract

Purpose

The purpose of this paper is to assess the causes and effects of delays in public sector housing projects in Ghana.

Design/methodology/approach

A purposive sampling approach was used in selecting the respondents for the study. These were experts working on various state housing construction projects in Ghana.

Findings

Results from the study showed that the critical factors that contribute to project delays in Ghana are; delay in payment to contractor/supplier, inflation/price fluctuation, price increases in materials, inadequate funds from sponsors/clients, variation orders and poor financial/capital market. The critical effects of delays are cost overrun, time overrun, litigation, lack of continuity by client and arbitration.

Research limitations/implications

This paper is limited to causes and effects of project delays in Ghana based on data collected from only one state institution. Due to geographic constraints the researchers were unable to sample state institutions across Ghana involved in various housing projects.

Practical implications

This paper has documented the critical state housing construction project delay factors in Ghana. The results will help project managers and policymakers appreciate the effects of these delays on project outcomes.

Social implications

Measures aimed at reducing cost of housing projects in Ghana can translate into significant benefits to the poor and support achievement of government objective of providing affordable housing to low income citizens.

Originality/value

This research focussed on the key factors and best practices that lead to the success of state housing projects within the Ghanaian context.

Details

International Journal of Managing Projects in Business, vol. 8 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Article
Publication date: 14 October 2021

Hui Yu, Wei Yang, Na Xu and Yang Du

After receiving advertising messages, most consumers rarely purchase the advertised products at once, which results in a delay between advertising exposure and its effect. This…

Abstract

Purpose

After receiving advertising messages, most consumers rarely purchase the advertised products at once, which results in a delay between advertising exposure and its effect. This paper is devoted to exploring the advertising decision and coordination issues for a supply chain system subject to advertising immediate and delayed effects.

Design/methodology/approach

By applying the game theory, the differential game models with delay are constructed for the supply chain to examine the equilibrium advertising efforts, brand goodwill and the optimal profits under the different cooperation situations. A class of transfer payment contracts is designed to achieve the best outcome of the supply chain. Illustrative examples are given to demonstrate the effectiveness of addressed results and provide some managerial perspectives.

Findings

It can be found that the complete cooperation situation can stimulate the advertising investment, drive the product demand and improve the economic profit. Also, a class of transfer payment contracts is designed in this paper, such that the supply chain can perfectly realize the profit maximization, and each member can achieve the Pareto improvement.

Research limitations/implications

This work does not address the random market environment, which can be filled in the future. Furthermore, this paper has been done in a single supply chain structure. It is an interesting future line of research when taking competitive behavior (e.g. competition among manufacturers, retailers or supply chains) into account.

Practical implications

This study will help managers make advertising strategies, advise an optimal cooperation way and design the coordination contracts to ensure the economic development of the supply chain. These obtained conclusions may provide a valuable decision-support for marketing management.

Originality/value

For a supply chain, the most previous literature about dynamic advertising models focused on a single advertising effect-immediate effect. This work explores advertising strategy with double advertising effects and investigates the coordinating power of new transfer payment contracts.

Details

Kybernetes, vol. 52 no. 1
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 14 September 2023

Yongchang Jiang, Hejie Zhu and E. Bai

The existence of the advertising delay effect and its impact on supply chain operations have been demonstrated in the current study. Therefore, this study develops a timely…

Abstract

Purpose

The existence of the advertising delay effect and its impact on supply chain operations have been demonstrated in the current study. Therefore, this study develops a timely inventory control strategy for the fresh produce supply chain to address the advertising delay effect in the fresh produce supply chain.

Design/methodology/approach

This study proposes a game model based on the Nerlove-Arrow time delay differential equation and Pontryagin's maximum principle. Through comparative analyses of the optimal equilibrium strategies, the authors compare the optimal equilibrium strategies, product goodwill and optimal inventory trajectories for suppliers and retailers under secondary replenishment decisions and decentralized decisions.

Findings

The authors find that (1) Only when the sales cycle meets certain conditions can the overall profit of the supply chain under the secondary replenishment decision be greater than that under the decentralized decision. As the price markup coefficient increases, the total profit of the supply chain first increases and then decreases. (2) With the increase in the delay time, the replenishment quantity during the initial period gradually decreases. After the delay time elapses, the inventory depletion rate under secondary replenishment decisions is faster than that under decentralized decision-making. (3) Although there is a continuously increasing maximum value of product goodwill with the increase in delay time, it becomes difficult to achieve this value for longer delays.

Practical implications

The authors’ findings provide a theoretical basis for supply chain members of fresh agricultural products to select replenishment and inventory control strategies when adopting different levels of delay in advertising marketing.

Originality/value

Firstly, this paper explains the impact of advertising delay effect on fresh produce supply chain from a dynamic perspective, and secondly, it provides guidance on advertising formulation and inventory replenishment for fresh produce retailers under the influence of advertising delay effect.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 24 June 2020

Tapio Niemi, Ari-Pekka Hameri, Petro Kolesnyk and Patrik Appelqvist

Delivery punctuality is essential in supply chain management, yet the cost of untimely delivery is usually assumed to be given or based on intuition and not quantified by facts.

Abstract

Purpose

Delivery punctuality is essential in supply chain management, yet the cost of untimely delivery is usually assumed to be given or based on intuition and not quantified by facts.

Design/methodology/approach

The authors used a data set containing detailed transaction data for a nine-year period on orders and deliveries of sport goods. The methodology is based on applying a polynomial distributed lag model to longitudinal data on supply chain transactions.

Findings

The results indicate that small delivery delays up to two weeks decrease the sales by maximum 10% during a period of 3–4 weeks. Longer delays, up to 45 days, have a larger negative effect on sales, which can also last longer. For this case company, the estimated lost sales due to late deliveries (=5 days) were 5.1% of the delivery value. The longer delays got, the large the cost was: delays at least 45 days long were the most costly causing almost 40% of the estimated lost sales.

Practical implications

This study offers a methodology for quantifying lost sales due to delivery delays and estimating how long the poor delivery performance affects retailers' order behaviour.

Originality/value

The results give a quantitative decision-making tool for supply chain managers to estimate the profitability of investments in the supply chain performance, especially on improving punctuality.

Details

Journal of Advances in Management Research, vol. 17 no. 4
Type: Research Article
ISSN: 0972-7981

Keywords

Article
Publication date: 3 October 2016

Suhaiza Zailani, Hazrina Aziz Md. Ariffin, Mohammad Iranmanesh, Soroush Moeinzadeh and Masoomeh Iranmanesh

This paper aims to explore the relationship between delay factors and construction project performance with respect to project risk mitigation strategies as moderators.

2010

Abstract

Purpose

This paper aims to explore the relationship between delay factors and construction project performance with respect to project risk mitigation strategies as moderators.

Design/methodology/approach

Random sampling was used to select the sample of the study. Data were gathered through a survey of 204 Malaysian construction companies. The data were analysed using the partial least squares technique.

Findings

The results indicate that environmental, resource and coordination issues negatively affect construction project performance. Project visibility and flexibility can mitigate the negative effects of both resource and coordination issues on project performance. Furthermore, supplier development can mitigate the negative effects of coordination issues.

Practical implications

The findings of the study will be useful for construction firms to complete construction projects timely, within a scheduled budget and with only minor defects if adopted.

Originality/value

This study is among the first to empirically test the moderating role of risk mitigation strategies on the relationship between delay factors and project performance in the construction industry.

Details

Journal of Science and Technology Policy Management, vol. 7 no. 3
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 30 September 2014

Devendra Kumar Sharma, Brajesh Kumar Kaushik and R.K. Sharma

The purpose of this research paper is to analyze the combined effects of driver size and coupling parasitics on crosstalk noise and delay for static and dynamically switching…

Abstract

Purpose

The purpose of this research paper is to analyze the combined effects of driver size and coupling parasitics on crosstalk noise and delay for static and dynamically switching victim line. Furthermore, this paper shows the effect of inductance on delay and qualitatively optimizes its value to obtain minimum delay.

Design/methodology/approach

The interwire parasitics are the primary sources of crosstalk or coupled noise that may lead to critical delays/logic malfunctions. This paper is based on simulating a pair of distributed resistance inductance capacitance (RLC) interconnects coupled capacitively and inductively for measurements of crosstalk noise/delay. The combined effects of driver sizing and interwire parasitics on peak overshoot noise/delay are observed through simulation program with integrated circuit emphasis (SPICE) simulations for different switching patterns. Furthermore, the analysis of inductive effect on propagation delay as a function of coupling capacitance is carried out and the optimization of delay is worked out qualitatively. The simulations are carried out at 0.13 μm, 1.5 V technology node.

Findings

This paper observes the contradictory effects of coupling parasitics on wire propagation delay; however, the effect on peak noise is of a different kind. Further, this paper shows that the driver size exhibits opposite kind of behavior on propagation delay than peak over shoot noise. It is observed that the delay is affected in presence of inductance; thus, the optimization of delay is carried out.

Originality/value

The effects of driver sizing and interwire parasitics are analyzed through simulations. The optimum value of coupling capacitance for delay is found qualitatively. These findings are important for designing very large scale integration (VLSI) interconnects.

Details

Journal of Engineering, Design and Technology, vol. 12 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 29 March 2011

D.K. Sharma, B.K. Kaushik and R.K. Sharma

The purpose of this paper is to explore the functioning of very‐large‐scale integration (VLSI) interconnects and modeling of interconnects and evaluate different approaches of…

Abstract

Purpose

The purpose of this paper is to explore the functioning of very‐large‐scale integration (VLSI) interconnects and modeling of interconnects and evaluate different approaches of testing interconnects.

Design/methodology/approach

In the past, on‐chip interconnect wires were not considered in circuit analysis except in high precision analysis. Wiring‐up of on‐chip devices takes place through various conductors produced during fabrication process. The shrinking size of metal‐oxide semiconductor field effect transistor devices is largely responsible for growth of VLSI circuits. With deep sub‐micron (DSM) technology, the interconnect geometry is scaled down for high wiring density. The complex geometry of interconnects and high operational frequency introduce wire parasitics and inter‐wire parasitics. These parasitics causes delay, power dissipation, and crosstalk that may affect the signal integrity in VLSI system. Accurate analysis, sophisticated design, and effective test methods are the requirement to ensure the proper functionality and reliability of VLSI circuits. The testing of interconnect is becoming important and a challenge in the current technology.

Findings

The effects of interconnect on signal integrity, power dissipation, and delay emerges significantly in DSM technology. For proper performance of the circuit, testing of interconnect is important and emerging challenge in the nanotechnology era. Although some work has been done for testing of interconnect, however, it is still an open area to test the parasitics effects of VLSI/ultra‐large‐scale integration interconnects. Efforts are required to analyze and to develop test methods for crosstalk, delay and power dissipation in current technology with solutions to minimize this effect.

Originality/value

This paper reviews the functioning of VLSI interconnects from micrometer to nanometer technology. The development of various interconnect models from simple short circuit to latest resistance inductance capacitance transmission line model are discussed. Furthermore, various methodologies such as built‐in self test and other techniques for testing interconnect for crosstalk and delay are discussed.

Details

Journal of Engineering, Design and Technology, vol. 9 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 July 2021

Md. Ikramul Hoque, Md. Abu Safayet, Md. Jewel Rana, Abu Yousuf Bhuiyan and Golam Sadmani Quraishy

Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and…

Abstract

Purpose

Construction delay is the most common issue and creates many adverse effects in any construction industry. This study has investigated the views of engineers, project managers and contractors on the causes of delay during a construction phase to identify potential delay factors, negative effects on project delivery and prioritize the delay factors.

Design/methodology/approach

An extensive literature review and interview with construction stakeholders have been conducted to identify potential causes of construction delays and design a questionnaire survey. The final questionnaire was designed with 40 potential delay factors, and a total of 102 valid Bangladeshi construction stakeholders responded to it. The result was analyzed by the relative importance index.

Findings

Among the 40 delay factors, the top five most influencing delay factors are “delay in progress payments,” “rework due to mistakes during construction,” “lack of skilled labor,” “poor monitoring and control of activities” and “delays in the making of a decision.” The top five most damaging effects of delay are “time overrun,” “cost overrun,” “disputes,” “arbitration” and “litigation,” among ten negative effects of construction delay. All construction stakeholders believe that the owner-related, consultant-related and contractor-related groups are the first, second and third most important groups of delay factors.

Originality/value

The outcome of this study would enable the Bangladeshi construction industry to develop strategies to overcome delay factors and their harmful effects. By focusing on the outcome of this research and prioritizing the critical factors, the construction industry of Bangladesh will be able to minimize construction delay significantly and propagate the progress of the construction industry by delivering quality projects timely.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 2
Type: Research Article
ISSN: 2398-4708

Keywords