Article
Publication date: 29 October 2021

Oluseye Olugboyega and Abimbola Olukemi Windapo

The purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction…

Abstract

Purpose

The purpose of this paper is to investigate the barriers that are constituting significant obstructions to preliminary and sustained BIM adoption in the South African construction industry.

Design/methodology/approach

Implementation Process Theory was used to develop the theoretical model of barriers to continuous and consistent BIM adoption. This enabled the formulation of two hypotheses, the identification of two sub-constructs (barriers to preliminary BIM adoption and barriers to sustained BIM adoption), and five variables (resources, knowledge, work process, organisational and planning barriers), which were validated using structural equation modelling (SEM).

Findings

The SEM results show pieces of evidence that validate the hypotheses in the theoretical model. The path analysis confirms that the two sub-constructs and five variables are statistically significant.

Research limitations/implications

This research extends the postulations on the barriers to BIM adoption by demonstrating that organisational challenges and planning difficulties constitute barriers to sustained BIM adoption in the South African construction industry.

Practical implications

The findings of this research are useful in understanding the planning scope and organisational requirements towards continuous and consistent BIM adoption in the South African construction industry.

Originality/value

The difficulties with BIM adoption are the issues with the performance of BIM on projects and are the major reason for the non-consistent adoption of BIM on projects. Having difficulties adopting BIM on projects suggests that BIM adoption is majorly on a preliminary or trial basis in the developing countries. This research tests this theory by proposing two types of BIM adoption and their associated barriers.

Details

Construction Innovation , vol. 22 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 24 March 2023

Oluseye Olugboyega

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of…

Abstract

Purpose

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of BIM in projects. The BIM literature has not provided evidence to support this claim or identify the fundamental BIM implementation strategies. This study filled this gap by identifying and investigating the effect of fundamental BIM implementation methodologies on the occurrence of proportional impacts between stages.

Design/methodology/approach

The findings indicate a positive and crucial relationship between the stages of the BIM implementation strategies and the reduction of barriers (r = 1.79, z = 2.15), preliminary and sustained BIM adoption barriers (r = 1.53, z = 60.83), BIM adoption on projects and BIM-enabled integration and collaboration (r = 0.7, z = 2.74). This validates the model's hypotheses and demonstrates that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering the obstacles alone will not secure BIM adoption.

Findings

The validation of the model's hypotheses demonstrated that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering BIM adoption obstacles alone will not secure BIM adoption. This study proposes that BIM deployment tactics be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance.

Research limitations/implications

In line with the findings of this study, BIM adoption must be consistent and long-term before the benefits in project execution become evident and substantiated. The BIM abilities of project participants, the feasibility of BIM conventions and the proficiency of BIM supervisors may all play a role in this.

Practical implications

This research implies a few approaches and tactics for implementing BIM in an efficient and beneficial manner. The study's findings imply that BIM deployment tactics should be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance. It also explains how to structure BIM implementation strategies in developing countries. Another significant practical implication is the model's conclusion on the benefits of BIM adoption.

Originality/value

This study emphasises the significance of understanding the interrelatedness between the stages of the BIM implementation process in order to promote unavoidable and high-quality BIM adoption, as well as identifying the essential strategies that will guide policymakers and industry players in improving and pursuing successful BIM implementation. This study adds to BIM implementation theories by providing new information on the models, stages and interconnections of the BIM implementation process. However, the study could not identify the factors that impede BIM adoption despite the reduction in barriers and use of fundamental BIM implementation strategies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 February 2021

Oludolapo Ibrahim Olanrewaju, Sunday Ajiboye Babarinde, Nicholas Chileshe and Malindu Sandanayake

The Nigerian construction industry, like in most emerging economies has been slow with technological advances such as building information modeling (BIM). More so, the application…

Abstract

Purpose

The Nigerian construction industry, like in most emerging economies has been slow with technological advances such as building information modeling (BIM). More so, the application of BIM among Nigerian practitioners is rather limited to architects’ usage for schematic design and presentation of drawings. The purpose of this study is to enhance BIM’s uptake, this study explores the drivers for the implementation of BIM within the Nigerian construction industry.

Design/methodology/approach

An interpretivist epistemological design was adapted to extensively manually review and search the literature on BIM implementation drivers. Based on 14 drivers for BIM implementation drivers identified, a survey questionnaire was used to collect data from the Nigerian construction practitioners. The data obtained is then subjected to descriptive, inferential statistics and multivariate techniques such as factor analysis.

Findings

The study, through factor analysis, categorized the 14 drivers to BIM implementation into four principal factors. The factors are construction related-drivers; process digitalization and economic-related drivers; sustainability and efficiency-related drivers; and visualization and productivity-related drivers.

Practical implications

To effectively adopt BIM in the construction industry, it is necessary to identify the BIM implementing drivers, which can act as catalysts of change and, thus leading to sustained adoption of BIM. Therefore, the identified drivers and categorization of principal factors could provide managerial implications for better execution and adoption of BIM, as well as the creation of the required change for the BIM implementation.

Originality/value

The research provides insights into the implementation drivers of BIM in lesser studies in a developing country such as Nigeria. The study further contributes to this research sphere by using factor analysis to customize and contextualize the drivers that were previously identified.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 3
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 19 July 2023

Oluseye Olugboyega, Itunnu Dorcas Elubode, Godwin Ehis Oseghale and Clinton Aigbavboa

This study investigated the concerns and plans of construction professionals about building information modeling (BIM) implementation, found the acceptable BIM implementation…

Abstract

Purpose

This study investigated the concerns and plans of construction professionals about building information modeling (BIM) implementation, found the acceptable BIM implementation driving forces and strategies for them and developed a prescriptive BIM implementation model to help understand how BIM implementation concerns, intentions, driving forces and strategies are connected.

Design/methodology/approach

This study employs a positivist paradigm with a hypothetico-deductive research strategy as well as concern-based adoption theory as a conceptual lens to distinguish construction professionals (CPs)' BIM implementation concerns and intentions. This implies that the forces driving BIM implementation intentions and concerns are related to BIM implementation methods and that their concentrations are proportional to the intensity of BIM implementation strategies. A 16-item questionnaire tailored to the operations of CPs was used for data collection. The data collected from respondents were utilized to evaluate the proposed model using structural equation modeling (SEM) techniques.

Findings

Findings from the data collected from the respondents revealed that CPs are concerned about the impact of BIM deployment on their time and service quality. Their main purpose was to take drives to learn more about BIM in order to pique their curiosity. Embracing the latest digital technology and beginning self-initiated BIM training are two strategies that would be quite effective in boosting BIM deployment.

Research limitations/implications

The study identifies promising directions for future BIM implementation research and development. The study's findings imply that more theoretically motivated research, rather than just empirical research, is required to refine BIM implementation concerns.

Practical implications

The study has implications for the professional development of CPs as well as understanding the process of implementing BIM change. The study's findings will help to understand the resource system for assessing CPs' needs and concerns and selecting personalized BIM implementation strategies.

Originality/value

Before this study, BIM-related studies had ignored the concerns and goals of the CPs when it came to implementing BIM. Using the CPs' concerns and hopes for BIM implementation, a systemic BIM implementation model was developed that would help and speed up BIM adoption.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 18 August 2022

Oluseye Olugboyega, Abimbola Windapo, Clinton Aigbavboa and Godwin Ehis Oseghale

Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adoption. As…

1414

Abstract

Purpose

Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adoption. As a result, this study looked into the parts of the BIM implementation model that had the most impact on increasing the percentage of BIM adoption in South Africa.

Design/methodology/approach

This study developed a four-wheel model of BIM implementation based on implementation process theory, which includes BIM inspiration, BIM capacity development, BIM use and BIM commitment. To assess BIM capacity development, two sub-constructs (BIM learning process and BIM learning methodologies) were used. Two sub-constructs were used to assess BIM utilisation (efficient BIM application and effective BIM application). The sub-constructs employed to quantify BIM motivation were organisational competitiveness, societal conformity and contractual obligations. Incentives, investments and obligations were used to assess BIM commitment. The model was validated using four assumptions and maximum likelihood estimation – structural equation modelling (MLE-SEM).

Findings

The MLE-SEM results demonstrated unequivocally that all of the constructions are critical components of the BIM deployment paradigm in the South African construction industry. BIM motivation, as characterised by organisational competitiveness and social compliance, has the greatest impact. The findings on BIM motivation also revealed that the desire for technological sophistication, competitiveness and social acceptance by clients are encouraging construction organisations and professionals to embrace BIM adoption.

Research limitations/implications

This study's findings have contributed to the increasing body of literature on BIM deployment. The study has significant implications for achieving BIM implementation in underdeveloped nations where BIM deployment is either non-existent or in its early stages. The theoretical component of the study serves as the foundation for further analysis of BIM deployment.

Practical implications

This research is important for identifying BIM goals, developing a BIM implementation framework, allocating resources for BIM implementation and defining key performance indicators for BIM implementation. The BIM implementation aspects outlined in this study will be effective in lowering BIM adoption hurdles.

Originality/value

This study makes a unique contribution to BIM research by providing theoretical and empirical analysis into the elements of the BIM implementation model in a developing country. The study offers an excellent opportunity to further our understanding of BIM application in underdeveloped nations.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 7 September 2023

Himal Suranga Jayasena, Niraj Thurairajah, B.A.K.S. Perera and Mohan Siriwardena

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of…

Abstract

Purpose

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of understanding that supports contextualized understanding of BIM adoption decisions in a BIM infant industry. The framework bridges the gap in current knowledge in terms of the absence of such a framework, which has hindered the structured understanding of the BIM decision of an adopter, curtailing the appropriate strategizing of their BIM adoption.

Design/methodology/approach

The study focuses on a BIM infant industry, where early adopters begin using BIM, allowing insights into this crucial initial stage of adoption. Identifying affordances as a versatile concept that could effectively represent not only what an adopter perceives and expects from BIM implementation, but also, what the adopter, in fact, can achieve from it, an affordance-led framework of understanding (AFU) was developed to comprehensively capture varying dynamics of BIM decision process. The study took a qualitative retroductive approach to theory with semi-structured interviews to gather necessary data from a sample of BIM adopters purposively selected to maximize the breadth and depth of data.

Findings

The study concludes by identifying and defining pertinent affordances as a new concept and a compulsory state for BIM adoption. Findings further demonstrate that existing theories can be linked to the AFU to strategically direct the affordances dynamics towards the pertinent state.

Originality/value

The AFU enables a deeper contextualizable view of innovation adoption that was absent in existing innovation studies. It significantly enhances the precision of strategizing BIM adoption compared to previous approaches, enabling adopters to plan and implement BIM in a manner that aligns well with their expectations and specific conditions.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 10 June 2022

Seda Tan and Gulden Gumusburun Ayalp

Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM

Abstract

Purpose

Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.

Design/methodology/approach

A questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.

Findings

Eight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.

Research limitations/implications

This study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.

Originality/value

Several studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.

Open Access
Article
Publication date: 17 June 2022

Oluseye Olugboyega and Abimbola Windapo

BIM research to date has in general zeroed in on featuring the significance of BIM-enabled integration and collaboration (BIMIC) rather than giving exact proof of its occurrence…

Abstract

Purpose

BIM research to date has in general zeroed in on featuring the significance of BIM-enabled integration and collaboration (BIMIC) rather than giving exact proof of its occurrence. Accordingly, this research quantitatively explored the determinants of BIMIC in South Africa.

Design/methodology/approach

This research conceptualized a four-pillar model of BIM-enabled integration and collaboration. The speculations in the model were examined using SEM-MLE.

Findings

The aftereffects of the SEM-MLE demonstrated that network communication, knowledge sharing, and transfer, information sharing and exchange and trust-based relationships are critical determinants of BIMIC. The model's prescient power demonstrates an acceptable validity, and the boundary gauges showed that all the hypotheses were measurably huge.

Research limitations/implications

This research gives a hypothetical premise for further investigation of BIMIC by supporting the postulations on the occurrence of collaboration and integrations among the BIM-SCM.

Practical implications

The idea investigated involving SEM in this research gives a holistic view to the BIM managers in arranging BIM-based activities and overseeing BIM cycles and supply chain members. It likewise offers rules and structures for accomplishing and overseeing integration and collaboration among the BIM supply chain members.

Originality/value

Despite 20 years of exploration on the BIM concept and adoption, no idea has been given to clarify the determinants of integration and collaboration as a BIM cycle. The four-pillar model of BIMIC created and tested in this research clarified BIMIC and contributed a new model to the current literature on the BIM process.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 24 May 2023

Mohammad S. Al-Mohammad, Ahmad Tarmizi Haron, Rahimi A. Rahman and Yasir Alhammadi

This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors' groupings among architecture…

Abstract

Purpose

This study examines the underlying relationships between the critical factors of building information modeling (BIM) implementation and the factors' groupings among architecture, engineering and construction (AEC) organizations in Saudi Arabia. The objectives of the study are to (1) identify the critical factors for BIM implementation, (2) analyze the interrelationships between the critical factors and (3) compare the critical factors between the different organizational characteristics.

Design/methodology/approach

First, potential factors were identified through a systematic literature review and interviews with AEC professionals. Then, a questionnaire survey was sent to AEC professionals and the collected data were analyzed using the following techniques and tests: mean score ranking, standard deviation, normalized value, factor analysis (FA), analysis of variance (ANOVA) and post-hoc Tukey test.

Findings

The analyses show that 14 factors are critical for BIM implementation in Saudi Arabia. The top critical factors include the existence of standard contracts on data security and user confidentiality, consistent views on BIM among stakeholders and the availability of guidelines for implementing BIM. Of the 14 critical factors, 9 can be grouped into 4 underlying factors: environmental, governmental, legal and organizational. The analysis shows that the criticality of the most critical factors grouped by the FA varies between different levels of BIM competency. Finally, the presence of public–private partnerships (PPPs) in realizing BIM projects is a new and emerging critical factor for BIM implementation in Saudi Arabia.

Originality/value

This study differs from prior works on BIM implementation in Saudi Arabia by using FA to explore the underlying relationships among factors of BIM implementation and the factors' groupings. Based on the FA results, a roadmap for implementing the BIM was developed. These findings will help to purposefully and efficiently customize BIM implementation strategies and initiatives to ensure successful BIM implementation in Saudi Arabia.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of 548