Publication date: 24 March 2023

Oluseye Olugboyega

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of…

Abstract

Purpose

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of BIM in projects. The BIM literature has not provided evidence to support this claim or identify the fundamental BIM implementation strategies. This study filled this gap by identifying and investigating the effect of fundamental BIM implementation methodologies on the occurrence of proportional impacts between stages.

Design/methodology/approach

The findings indicate a positive and crucial relationship between the stages of the BIM implementation strategies and the reduction of barriers (r = 1.79, z = 2.15), preliminary and sustained BIM adoption barriers (r = 1.53, z = 60.83), BIM adoption on projects and BIM-enabled integration and collaboration (r = 0.7, z = 2.74). This validates the model's hypotheses and demonstrates that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering the obstacles alone will not secure BIM adoption.

Findings

The validation of the model's hypotheses demonstrated that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering BIM adoption obstacles alone will not secure BIM adoption. This study proposes that BIM deployment tactics be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance.

Research limitations/implications

In line with the findings of this study, BIM adoption must be consistent and long-term before the benefits in project execution become evident and substantiated. The BIM abilities of project participants, the feasibility of BIM conventions and the proficiency of BIM supervisors may all play a role in this.

Practical implications

This research implies a few approaches and tactics for implementing BIM in an efficient and beneficial manner. The study's findings imply that BIM deployment tactics should be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance. It also explains how to structure BIM implementation strategies in developing countries. Another significant practical implication is the model's conclusion on the benefits of BIM adoption.

Originality/value

This study emphasises the significance of understanding the interrelatedness between the stages of the BIM implementation process in order to promote unavoidable and high-quality BIM adoption, as well as identifying the essential strategies that will guide policymakers and industry players in improving and pursuing successful BIM implementation. This study adds to BIM implementation theories by providing new information on the models, stages and interconnections of the BIM implementation process. However, the study could not identify the factors that impede BIM adoption despite the reduction in barriers and use of fundamental BIM implementation strategies.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 8
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 July 2023

Oluseye Olugboyega, Itunnu Dorcas Elubode, Godwin Ehis Oseghale and Clinton Aigbavboa

This study investigated the concerns and plans of construction professionals about building information modeling (BIM) implementation, found the acceptable BIM implementation

Abstract

Purpose

This study investigated the concerns and plans of construction professionals about building information modeling (BIM) implementation, found the acceptable BIM implementation driving forces and strategies for them and developed a prescriptive BIM implementation model to help understand how BIM implementation concerns, intentions, driving forces and strategies are connected.

Design/methodology/approach

This study employs a positivist paradigm with a hypothetico-deductive research strategy as well as concern-based adoption theory as a conceptual lens to distinguish construction professionals (CPs)' BIM implementation concerns and intentions. This implies that the forces driving BIM implementation intentions and concerns are related to BIM implementation methods and that their concentrations are proportional to the intensity of BIM implementation strategies. A 16-item questionnaire tailored to the operations of CPs was used for data collection. The data collected from respondents were utilized to evaluate the proposed model using structural equation modeling (SEM) techniques.

Findings

Findings from the data collected from the respondents revealed that CPs are concerned about the impact of BIM deployment on their time and service quality. Their main purpose was to take drives to learn more about BIM in order to pique their curiosity. Embracing the latest digital technology and beginning self-initiated BIM training are two strategies that would be quite effective in boosting BIM deployment.

Research limitations/implications

The study identifies promising directions for future BIM implementation research and development. The study's findings imply that more theoretically motivated research, rather than just empirical research, is required to refine BIM implementation concerns.

Practical implications

The study has implications for the professional development of CPs as well as understanding the process of implementing BIM change. The study's findings will help to understand the resource system for assessing CPs' needs and concerns and selecting personalized BIM implementation strategies.

Originality/value

Before this study, BIM-related studies had ignored the concerns and goals of the CPs when it came to implementing BIM. Using the CPs' concerns and hopes for BIM implementation, a systemic BIM implementation model was developed that would help and speed up BIM adoption.

Details

Frontiers in Engineering and Built Environment, vol. 4 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 18 August 2022

Oluseye Olugboyega, Abimbola Windapo, Clinton Aigbavboa and Godwin Ehis Oseghale

Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adoption. As…

1414

Abstract

Purpose

Because BIM adoption is still afflicted by various types of hurdles, a complete BIM implementation model is required to provide the necessary methods for driving BIM adoption. As a result, this study looked into the parts of the BIM implementation model that had the most impact on increasing the percentage of BIM adoption in South Africa.

Design/methodology/approach

This study developed a four-wheel model of BIM implementation based on implementation process theory, which includes BIM inspiration, BIM capacity development, BIM use and BIM commitment. To assess BIM capacity development, two sub-constructs (BIM learning process and BIM learning methodologies) were used. Two sub-constructs were used to assess BIM utilisation (efficient BIM application and effective BIM application). The sub-constructs employed to quantify BIM motivation were organisational competitiveness, societal conformity and contractual obligations. Incentives, investments and obligations were used to assess BIM commitment. The model was validated using four assumptions and maximum likelihood estimation – structural equation modelling (MLE-SEM).

Findings

The MLE-SEM results demonstrated unequivocally that all of the constructions are critical components of the BIM deployment paradigm in the South African construction industry. BIM motivation, as characterised by organisational competitiveness and social compliance, has the greatest impact. The findings on BIM motivation also revealed that the desire for technological sophistication, competitiveness and social acceptance by clients are encouraging construction organisations and professionals to embrace BIM adoption.

Research limitations/implications

This study's findings have contributed to the increasing body of literature on BIM deployment. The study has significant implications for achieving BIM implementation in underdeveloped nations where BIM deployment is either non-existent or in its early stages. The theoretical component of the study serves as the foundation for further analysis of BIM deployment.

Practical implications

This research is important for identifying BIM goals, developing a BIM implementation framework, allocating resources for BIM implementation and defining key performance indicators for BIM implementation. The BIM implementation aspects outlined in this study will be effective in lowering BIM adoption hurdles.

Originality/value

This study makes a unique contribution to BIM research by providing theoretical and empirical analysis into the elements of the BIM implementation model in a developing country. The study offers an excellent opportunity to further our understanding of BIM application in underdeveloped nations.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 16 August 2018

Ying Hong, Ahmed W.A. Hammad, Samad Sepasgozar and Ali Akbarnezhad

The purpose of this paper is to present a model for building information modelling (BIM) implementation at small and medium-sized construction contractor organisations (SMOs). The…

4513

Abstract

Purpose

The purpose of this paper is to present a model for building information modelling (BIM) implementation at small and medium-sized construction contractor organisations (SMOs). The proposed BIM adoption model assesses BIM implementation benefits, costs and challenges faced by SMOs. Correlation between BIM adoption in SMOs and the associated impacting factors, including knowledge support and BIM adoption motivation, is captured through the model.

Design/methodology/approach

A literature review of BIM adoption in construction was first presented. Research data, collected from 80 SMOs in Australia through a conducted survey, are then analysed. Descriptive analysis and structural equation modelling were used to investigate SMOs’ understanding of BIM, and to qualify the correlations among the proposed latent variables impacting BIM implementation at SMOs, respectively. Additionally, this study used χ2 test to compare differences between BIM users and non-BIM users regarding BIM understanding, interested applications and attitudes towards implementation benefits and challenges.

Findings

Potential benefits associated with BIM implementation are a major motivation factor when it comes to BIM adoption at SMOs. In addition, existing staff’s capability in using BIM tools positively affects the establishment of an organisational knowledge-support system, which determines the decision of adopting BIM eventually. Ultimately, there is a need for further emphasis on staff engagement in the implementation process.

Research limitations/implications

The results presented in this paper are applicable to SMOs in the building sector of construction. BIM implementation at organisations involved in non-building activities, including civil works and infrastructure, needs to be assessed in the future.

Practical implications

The results indicate that rather than placing the focus mainly on benefits of BIM implementation, successful implementation of BIM in practice requires adequate effort to assess implementation problems, establish knowledge support and engage staff in using BIM.

Originality/value

Results of this study provide an insight into the adoption challenges of BIM in SMOs, given that the focus of previous studies has been mostly placed on BIM adoption in architectural firms and large contractors.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 December 2021

Bocun Tu, Jian Zuo, Rui-Dong Chang, Ronald J. Webber, Feng Xiong and Na Dong

Building information modeling (BIM) is recognized as one of the technologies to upgrade the informatization level of the architecture engineering and construction (AEC) industry…

Abstract

Purpose

Building information modeling (BIM) is recognized as one of the technologies to upgrade the informatization level of the architecture engineering and construction (AEC) industry. However, the level of BIM implementation in the construction phase lags behind other phases of the project. Assessing the level of BIM implementation in the construction phase from a system dynamics (SD) perspective can comprehensively understand the interrelationship of factors in the BIM implementation system, thereby developing effective strategies to enhance BIM implementation during the construction phase. This study aims to develop a model to investigate the level of BIM implementation in the construction phase.

Design/methodology/approach

An SD model which covered technical subsystem, organizational subsystem, economic subsystem and environmental subsystem was developed based on questionnaire survey data and literature review. Data from China were used for model validation and simulation.

Findings

The simulation results highlight that, in China, from 2021 to 2035, the ratio of BIM implementation in the construction phase will rise from 48.8% to 83.8%, BIM model quality will be improved from 27.6% to 77.2%. The values for variables “BIM platform”, “organizational structure of BIM” and “workflow of BIM” at 2035 will reach 65.6%, 72.9% and 72.8%, respectively. And the total benefits will reach 336.5 billion yuan in 2035. Furthermore, the findings reveal five factors to effectively promote the level of BIM implementation in the construction phase, including: policy support, number of BIM standards, owners demand for BIM, investment in BIM and strategic support for BIM.

Originality/value

This study provides beneficial insights to effectively enhance the implementation level of BIM in the construction phase. Meanwhile, the model developed in this study can be used to dynamically and quantitatively assess the changes in the level of BIM implementation caused by a measure.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 October 2019

Longhui Liao, Evelyn Teo Ai Lin and Sui Pheng Low

The purpose of this paper is to identify critical non-value adding (NVA) building information modeling (BIM) implementation activities in current building project delivery…

Abstract

Purpose

The purpose of this paper is to identify critical non-value adding (NVA) building information modeling (BIM) implementation activities in current building project delivery process, develop a BIM implementation readiness (BIMIR) evaluation model, and assess BIMIR statuses in building projects in Singapore.

Design/methodology/approach

A questionnaire survey and four post-survey interviews were conducted in Singapore. A fuzzy synthetic evaluation approach was adopted in the model development.

Findings

In total, 38 out of 44 NVA BIM implementation activities were deemed critical and used in the proposed model, among which “lack of involvement by contractors to contribute site knowledge” in the design development phase was ranked top. This model was validated in five projects. It was found that most of 73 surveyed building projects were in a low BIMIR status and the assessment results were consistent with current industry practices of BIM implementation in Singapore.

Research limitations/implications

There may be geographical limitation on the identification of the critical NVA BIM implementation activities. However, because BIM mandate spreads globally, the findings can help overseas project teams customize their own NVA activities and evaluation models.

Practical implications

As BIM implementation is mandated in Singapore, BIMIR evaluation helps local project teams identify weak areas of their BIM implementation activities and prioritize resources to enhance those areas.

Originality/value

No tool has been developed for evaluating BIMIR at the project level in the construction industry in Singapore or at large in Asia. Four BIMIR statuses are defined, which are consistent with Singapore’s BIM guidelines and standards.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 10 June 2022

Seda Tan and Gulden Gumusburun Ayalp

Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM

Abstract

Purpose

Despite several advantages of Building Information Modelling (BIM) technology, BIM has not been adopted and implemented extensively in developing countries. Consequently BIM remains at a beginner level in developing countries. To increase the level of BIM implementation, first, knowing the root factors that resist BIM implementation is necessary to know. Therefore, the objective of this study was to identify the factors that limit BIM implementation in developing countries, specifically in the Turkish Architecture, Engineering and Construction (AEC) industry.

Design/methodology/approach

A questionnaire was designed with 46 influencing causes (ICs) identified through a systematic literature review. In total, 141 survey results were returned from architects and engineers, and reliability analysis, exploratory factor analysis, and confirmatory factor analysis were conducted. Furthermore, a structural equation model (SEM) was developed to identify the root factors of BIM implementation.

Findings

Eight root factors affecting the prevalent use of BIM technology in the Turkish construction industry were determined and grouped into three categories based on BIM implementation level. Problems with the BIM transition process and a lack of management support are the most influential root factors limiting BIM implementation. Lack of incentives, lack of BIM education, bias regarding BIM technology and BIM-based software problems form the second group of root factors that have a significant effect. Awareness and lack of communication amongst stakeholders were identified as root factors that had a moderate effect.

Research limitations/implications

This study contributes to the knowledge body by revealing eight root factors limiting BIM implementation in the Turkish AEC industry which can be generalised to most developing countries. Therefore, the outcomes of this study may be used as a practical reference for future research aimed at improving BIM adoption in developing countries through governmental, educational, and managerial solutions.

Originality/value

Several studies have identified the challenges and barriers of BIM implementation in the construction industry using qualitative and quantitative analyses and projected the current state. Unlike previous studies, this study comprehensively and quantitatively determined the root factors that constrain the use of BIM in Turkey using exploratory factor analysis, confirmatory factor analysis, and structural equation modelling to present a structural model.

Article
Publication date: 22 January 2019

Timothy O. Olawumi and Daniel W.M. Chan

The purpose of this paper is to explore building information modeling (BIM) implementation and practices in developed economies by developing a benchmarking model that will…

2048

Abstract

Purpose

The purpose of this paper is to explore building information modeling (BIM) implementation and practices in developed economies by developing a benchmarking model that will enhance BIM adoption and implementation in developing countries.

Design/methodology/approach

The research design adopted a qualitative approach which includes the desktop review of the extant literature as well as case study reviews of ten BIM projects using an explanatory case study technique to form the foundation upon which the study proposed the model. The moving basis heuristics technique was adopted to develop the scoring system.

Findings

The BIM benchmarking model and assessment template were developed which consisted of three-level concepts modeled to aid project organizations and project team in developing countries to assess and score the level of improvement and implementation of BIM in a project. A desktop review of BIM projects in developed countries demonstrated the significant improvements and benefits possible through the implementation of the established BIM benchmarking model.

Practical implications

The assessment template in conjunction with the benchmarking model is useful for a comparative evaluation of similar BIM projects and benchmarking purposes. The study also discussed how current findings extends and contradicts previous findings.

Originality/value

The findings have provided policymakers, construction stakeholders and professional bodies in the construction industry in developing countries with valuable insights and counter-intuitive perspective that could facilitate the uptake of BIM in construction projects.

Details

Benchmarking: An International Journal, vol. 26 no. 4
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 8 November 2011

Oluwole Alfred Olatunji

The popularity of Building Information Modelling (BIM) has improved tremendously in recent years. The business sense it makes to construction small to medium‐sized (SME…

3342

Abstract

Purpose

The popularity of Building Information Modelling (BIM) has improved tremendously in recent years. The business sense it makes to construction small to medium‐sized (SME) organizations has also become vitally important, especially when the deliverables of BIM potentials are becoming more explicit than they were several years ago. Moreover, there is adequate evidence to suggest that an early adoption of BIM by construction SME organizations could mean marked sustainable business advantage to them. The purpose of this paper is to initiate a long‐term study on how BIM triggers market improvements in the Australian construction industry, to establish the specific impact of these on construction industry's contribution to Australian economy, also to develop a simple model on the cost of implementing BIM in a typical construction SME.

Design/methodology/approach

This research relies on evidence from literature to identify different operational models of construction organizations, namely; matrix, divisional, functional and networked business models. A definite approach was taken to articulate some contributory concepts and rationales which drive organizational response to technological changes across the identified four categories of organization structure models. Focus group discussion was the primary research method for this study, while additional data were collected from public sources. Respondents and data were sourced from two firms selected from each type of organization model. In the end, 24 industry practitioners from a range of Australian construction SME businesses that provide software and technical support services, consultancy and contracting services took part in the study.

Findings

Analysis of 32 sample cases revealed that BIM implementation costs were mostly defined by a range of cost variables, including software acquisition and technical support, hardware, training, services and implementation contingencies. On the average, software costs accounted for about 55 percent of total implementation costs. This particular cost descriptor was about five to seven times more than the cost of hardware (depending on the level of sophistication of operations, expected implementation outcomes and whether new hardware were used or existing installation were upgraded with BIM compliant drivers). The study also found that training cost was a third of software costs, while the average total cost of services, recruitment and contingencies, all added together, was about 5 percent of total implementation costs. In the end, a linear model was developed to predict the cost of BIM implementation in construction SMEs.

Originality/value

A preliminary version of this study has been presented in the 2010 edition of the International Conference on Information Technology in Construction (CIB W078). As a study in a new direction, it focuses on specific organization models and their unique responses to drivers of change. While other studies have looked into macro implementation of BIM, mostly without considering the peculiarity and dynamics of organization structure, this study has focused on construction SME businesses offering a wide range of services.

Article
Publication date: 1 July 2024

Furkan Polat and Sevilay Demirkesen

The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends…

Abstract

Purpose

The main purpose of this study is to reveal the degree of association between lean, building information modeling (BIM) and construction project success. The study further intends to provide strategies for high and low associations of the factors.

Design/methodology/approach

Lean construction and BIM are two important applications that have recently gained popularity in terms of enhancing project success. Considering this impact, this study investigates the synergy between lean construction and BIM and determines to what extent these two contribute to the success of the projects. As a first step, lean, BIM and project success were examined based on an in-depth literature review. In the second stage, a structural equation model (SEM) was established to reflect the relationship among these three through hypotheses. Then, a questionnaire was designed and administered to the construction professionals experienced in both lean and BIM implementation. The SEM was tested using Analysis of Moment Structures (AMOS), an SPSS tool.

Findings

The results indicated that lean implementation has a significant and positive impact on BIM implementation and project success. On the other hand, BIM implementation had a lower significant impact on project success than lean implementation construct.

Research limitations/implications

The results of this study can be used by both policymakers and industry practitioners in terms of developing strategies for effectively using both lean and BIM. The researchers can further develop other implementation models to investigate whether these concepts are more effective in increasing project success when used integratively.

Originality/value

This study considers both the impact of lean and BIM on project success through input from construction practitioners working on large projects. This way, the study fosters the use of lean, BIM or lean–BIM together in construction projects to enhance project success.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords