Search results

1 – 10 of 503
Article
Publication date: 26 March 2024

Gavin Ford and Jonathan Gosling

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through…

Abstract

Purpose

The construction industry has struggled to deliver schemes on time to budget and right-first-time (RFT). There have been many studies into nonconformance and rework through quantitative research over the years to understand why the industry continues to see similar issues of failure. Some scholars have reported rework figures as high as 12.6% of total contract value, highlighting major concerns of the sustainability of construction projects. Separately, however, there have been few studies that explore and detail the views of industry professions who are caught in the middle of quality issues, to understand their perceptions of where the industry is failing. As such, this paper interrogates qualitative data (open-ended questions) on the topic of nonconformance and rework in construction to understand what industry professionals believe are the causes and suggested improvement areas.

Design/methodology/approach

A qualitative approach is adopted for this research. An industry survey consisting of seven open-ended questions is presented to two professional working groups within a Tier 1 contractor, and outputs are analysed using statistic software (NVivo 12) to identify prominent themes for discussion. Inductive analysis is undertaken to gain further insight into responses to yield recurrent areas for continuous improvement.

Findings

Qualitative analysis of the survey reveals a persistent prioritisation of cost and programme over quality management in construction project. Furthermore, feedback from construction professionals present a number of improvement areas that must be addressed to improve quality. These include increased training and competency investment, overhauling quality behaviours, providing greater quality leadership direction and reshaping the way clients govern schemes.

Research limitations/implications

There are limitations to this paper that require noting. Firstly, the survey was conducted within one principal contractor with varying levels of knowledge across multiple sectors. Secondly, the case study was from one major highways scheme; therefore, the generalisability of the findings is limited. It is suggested that a similar exercise is undertaken in other sectors to uncover similar improvement avenues.

Practical implications

The implications of this study calls for quality to be re-evaluated at project, company, sector and government levels to overhaul how quality is delivered. Furthermore, the paper identifies critical learning outcomes for the construction sector to take forward, including the need to reassess projects to ensure they are appropriately equip with competent personnel under a vetted, progressive training programme, share collaborative behaviours that value quality delivery on an equal standing to safety, programme and cost and tackle the inappropriate resource dilemmas projects finding themselves in through clear tendering and accurate planning. In addition, before making erratic decisions, projects must assess the risk profiling of proceed without approved design details and include the client in the decision-making process. Moreover, the findings call for a greater collaborative environment between the construction team and quality management department, rather than being seen as obstructive (i.e. compliance based policing). All of these must be driven by leadership to overhaul the way quality is managed on schemes. The findings demonstrate the importance and impact from open-ended survey response data studies to enhance quantitative outcomes and help provide strengthened proposals of improvement.

Originality/value

This paper addresses the highly sensitive area of quality failure outcomes and interrogates them via an industry survey within a major UK contractor for feedback. Unique insights are gained into how industry professionals perceive quality in construction. From previous research, this has been largely missing and offers a valuable addition in understanding the “quality status quo” from those delivering schemes.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 26 January 2024

Mohamed Marzouk and Dina Hamdala

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real…

93

Abstract

Purpose

The aggressive competition in the real estate market forces real estate developers to tackle the challenge of selecting the best project construction phasing alternative. The real estate industry is characterized by high costs, high profit and high risks. The schedules of real estate projects are also characterized by having large number of repetitive activities that are executed over a long duration. The repetitiveness, long duration of execution, the high amounts of money involved and the high risk made it desirable to leverage the impact of changes in phasing plans on net present value of amounts incurred and received over the long execution and selling duration. This also changes the project progress, and delivery time as well as their respective impact on customer degree of satisfaction. This research addresses the problem of selecting the best phasing alternative for real estate development projects while maximizing customer satisfaction and project profit.

Design/methodology/approach

The research proposes a model that generates all construction phasing alternatives and performs decision-making to rank all possible phasing alternatives. The proposed model consists of five modules: (1) Phasing Sequencing module, (2) Customer Satisfaction module, (3) Cash-In calculation module, (4) Cost Estimation module and (5) Decision-making module. A case study was presented to demonstrate the practicality of the model.

Findings

The proposed model satisfies the real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model generates all construction phasing alternatives and performs multi-criteria decision making to rank all possible phasing alternatives. It quantifies the score of the two previously mentioned criteria and ranks all solutions according to their overall score.

Research limitations/implications

The research proposes a model that assist real estate market's need for proper construction phasing plans evaluation and selection against the project's main success criteria, customer satisfaction and project profit. The proposed model can be used to conclude general guidelines and common successful practices to be used by real estate developers when deciding the construction phasing plan. In this study the model is based on business models where all the project units are sold, rental cases are not considered. Also, the budget limitations that might exist when phasing is not considered in the model computations.

Originality/value

The model can be used as a complete platform that can hold all real estate project data, process revenues and cost information for estimating profit, plotting cash flow profiles, quantifying the degree of customer satisfaction attributable to each phasing alternative and providing recommendation showing the best one. The model can be used to conclude general guidelines and common successful practices to be used by real estate developers when tackling the challenge of selecting construction phasing plans.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 March 2024

Camille J. Mora, Arunima Malik, Sruthi Shanmuga and Baljit Sidhu

Businesses are increasingly vulnerable and exposed to physical climate change risks, which can cascade through local, national and international supply chains. Currently, few…

Abstract

Purpose

Businesses are increasingly vulnerable and exposed to physical climate change risks, which can cascade through local, national and international supply chains. Currently, few methodologies can capture how physical risks impact businesses via the supply chains, yet outside the business literature, methodologies such as sustainability assessments can assess cascading impacts.

Design/methodology/approach

Adopting a scoping review framework by Arksey and O'Malley (2005) and the PRISMA extension for scoping reviews (PRISMA-ScR), this paper reviews 27 articles that assess climate risk in supply chains.

Findings

The literature on supply chain risks of climate change using quantitative techniques is limited. Our review confirms that no research adopts sustainability assessment methods to assess climate risk at a business-level.

Originality/value

Alongside the need to quantify physical risks to businesses is the growing awareness that climate change impacts traverse global supply chains. We review the state of the literature on methodological approaches and identify the opportunities for researchers to use sustainability assessment methods to assess climate risk in the supply chains of an individual business.

Details

Journal of Accounting Literature, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0737-4607

Keywords

Article
Publication date: 22 June 2023

Parvez Mia, James Hazelton and James Guthrie Am

This study aims to evaluate the quality of the energy efficiency disclosures made by Australian cities. As cities are significant energy users, and energy use is a crucial source…

Abstract

Purpose

This study aims to evaluate the quality of the energy efficiency disclosures made by Australian cities. As cities are significant energy users, and energy use is a crucial source of greenhouse gas emissions, energy efficiency initiatives can play an essential role in addressing climate change. Yet, little is understood about the energy efficiency disclosures being made.

Design/methodology/approach

The authors developed an original energy efficiency disclosure index to assess the reporting quality of the eight largest Australian cities. The websites of these cities were analysed for information on energy efficiency measures from December 2018 to June 2019. Annual reports, environmental reports, climate action plans and any other material related to energy plans were downloaded and then coded using the index.

Findings

While all cities provided energy efficiency information, little financial information was provided, limited forward-looking information was disclosed, key challenges were not disclosed, and each city provided energy efficiency disclosures differently. Collectively, these findings demonstrate that public accountability is limited.

Research limitations/implications

An important implication is the need to standardise and improve cities’ energy efficiency reporting, especially concerning financial information. Cities, governments and the Carbon Disclosure Project (formerly the CDP) could achieve this, perhaps as part of the broader update of the CDP city-focused guidelines for greenhouse gas (GHG) reporting.

Originality/value

Although some studies on GHG reporting by cities have already been undertaken, including energy efficiency as part of their disclosure index, no study has focused on energy efficiency disclosures. The authors provide original insights concerning these practices. The study also provides an energy efficiency disclosure index that can be used in further research.

Details

Meditari Accountancy Research, vol. 32 no. 2
Type: Research Article
ISSN: 2049-372X

Keywords

Article
Publication date: 25 April 2024

Abdul-Manan Sadick, Argaw Gurmu and Chathuri Gunarathna

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is…

Abstract

Purpose

Developing a reliable cost estimate at the early stage of construction projects is challenging due to inadequate project information. Most of the information during this stage is qualitative, posing additional challenges to achieving accurate cost estimates. Additionally, there is a lack of tools that use qualitative project information and forecast the budgets required for project completion. This research, therefore, aims to develop a model for setting project budgets (excluding land) during the pre-conceptual stage of residential buildings, where project information is mainly qualitative.

Design/methodology/approach

Due to the qualitative nature of project information at the pre-conception stage, a natural language processing model, DistilBERT (Distilled Bidirectional Encoder Representations from Transformers), was trained to predict the cost range of residential buildings at the pre-conception stage. The training and evaluation data included 63,899 building permit activity records (2021–2022) from the Victorian State Building Authority, Australia. The input data comprised the project description of each record, which included project location and basic material types (floor, frame, roofing, and external wall).

Findings

This research designed a novel tool for predicting the project budget based on preliminary project information. The model achieved 79% accuracy in classifying residential buildings into three cost_classes ($100,000-$300,000, $300,000-$500,000, $500,000-$1,200,000) and F1-scores of 0.85, 0.73, and 0.74, respectively. Additionally, the results show that the model learnt the contextual relationship between qualitative data like project location and cost.

Research limitations/implications

The current model was developed using data from Victoria state in Australia; hence, it would not return relevant outcomes for other contexts. However, future studies can adopt the methods to develop similar models for their context.

Originality/value

This research is the first to leverage a deep learning model, DistilBERT, for cost estimation at the pre-conception stage using basic project information like location and material types. Therefore, the model would contribute to overcoming data limitations for cost estimation at the pre-conception stage. Residential building stakeholders, like clients, designers, and estimators, can use the model to forecast the project budget at the pre-conception stage to facilitate decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 April 2024

Tatiana da Costa Reis Moreira, Daniel Luiz de Mattos Nascimento, Yelena Smirnova and Ana Carla de Souza Gomes dos Santos

This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for…

Abstract

Purpose

This paper explores Lean Six Sigma principles and the DMAIC (define, measure, analyze, improve, control) methodology to propose a new Lean Six Sigma 4.0 (LSS 4.0) framework for employee occupational exams and address the real-world issue of high-variability exams that may arise.

Design/methodology/approach

This study uses mixed methods, combining qualitative and quantitative data collection. A detailed case study assesses the impact of LSS interventions on the exam management process and tests the applicability of the proposed LSS 4.0 framework for employee occupational exams.

Findings

The results reveal that changing the health service supplier in the explored organization caused a substantial raise in occupational exams, leading to increased costs. By using syntactic interoperability, lean, six sigma and DMAIC approaches, improvements were identified, addressing process deviations and information requirements. Implementing corrective actions improved the exam process, reducing the number of exams and associated expenses.

Research limitations/implications

It is important to acknowledge certain limitations, such as the specific context of the case study and the exclusion of certain exam categories.

Practical implications

The practical implications of this research are substantial, providing organizations with valuable managerial insights into improving efficiency, reducing costs and ensuring regulatory compliance while managing occupational exams.

Originality/value

This study fills a research gap by applying LSS 4.0 to occupational exam management, offering a practical framework for organizations. It contributes to the existing knowledge base by addressing a relatively novel context and providing a detailed roadmap for process optimization.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Book part
Publication date: 19 April 2024

Lars Mjøset

This study investigates Rokkan's research programme in the light of the differences between case- and variables-based methodologies. Three phases of the research process are…

Abstract

This study investigates Rokkan's research programme in the light of the differences between case- and variables-based methodologies. Three phases of the research process are distinguished. Studying the way Rokkan actually proceeded in the research within his Europe project, we find that he follows the protocols of case-methodologies such as grounded theory. In the second phase of the research process, however, he constructs variables-based models as tools for his macro-historical comparisons. To get to variables from the sensitizing concepts coded in the first phase, Rokkan defines his variables as close to cases as possible: variables as nominal level typologies, types as variable values. He thus faces two interrelated dilemmas. First, a philosophy of science dissonance: he legitimates his research only with reference to a variable-methodology, while his research is thoroughly case based. Second, a paradox of double coding: using variable-based models in the second phase, the status of the knowledge available in the first phase memos is degraded. Rokkan cannot decide between the two main solutions to these dilemmas: The first solution is to discard his heterogeneous data, instead working only with homogeneous data that opens up to more consistently variables-oriented research. The second solution is to replace the notion of variables/variable values with typology/types, thereby returning to cases, pursuing comparative case reconstructions in the third phase of research. The study concludes in favour of the second solution.

Details

A Comparative Historical and Typological Approach to the Middle Eastern State System
Type: Book
ISBN: 978-1-83753-122-6

Keywords

Article
Publication date: 31 October 2023

Lisa Rosen, Shannon Scott, Bek Urban, Darian Poe, Roshni Shukla and Shazia Ahmed

The purpose of this study was to examine the lived experiences of working mothers during the first year of the COVID-19 pandemic and assess their perceptions of the types of…

Abstract

Purpose

The purpose of this study was to examine the lived experiences of working mothers during the first year of the COVID-19 pandemic and assess their perceptions of the types of training opportunities that would help advance their careers as they navigated pandemic-related challenges.

Design/methodology/approach

In study 1, 53 participants responded to an online survey that included open-ended questions regarding the impact COVID-19 has had on their careers and desires they have for training to ameliorate these concerns. For study 2, 10 participants completed an interview that included open-ended questions regarding workplace changes and professional development/training opportunities since the pandemic.

Findings

Thematic analysis showed mothers facing several setbacks in their careers, including delays, loss of hours and wages, childcare stressors and strained or lost relationships with colleagues and supervisors. A small number of participants also reported some surprisingly positive experiences, such as a push toward career innovation. Participants reported little to no exposure to career development opportunities and expressed a desire for training for leadership and interpersonal connection in the workplace.

Originality/value

Although quantitative data have been helpful in identifying and quantifying growing gender gaps in work during the pandemic, the qualitative analyses the authors used highlight how recent difficulties encountered by working mothers risk a growing gender gap in work and career mobility as women in the leadership pipeline struggle with challenges. Further, the findings suggest ways that women in management can support the working mothers on their staff, including by suggesting ways additional training may address some concerns.

Details

Gender in Management: An International Journal , vol. 39 no. 3
Type: Research Article
ISSN: 1754-2413

Keywords

Article
Publication date: 2 April 2024

Palmira Piedepalumbo, Ludovica Evangelista, Daniela Mancini and Elisabetta Magnaghi

This study aims to propose a longitudinal analysis of motivations for Integrated Reporting (IR) adoption, internal changes, the benefits of IR implementation and compliance…

Abstract

Purpose

This study aims to propose a longitudinal analysis of motivations for Integrated Reporting (IR) adoption, internal changes, the benefits of IR implementation and compliance challenges.

Design/methodology/approach

The authors analyse a longitudinal case study of an Italian-listed company (Eni) participating in the IR-Pilot Programme (PP) and covering 10 years of IR adoption. The analysis was based on a mixed-method approach that included semi-structured interviews, content analysis of annual reports and triangulation with other data sources. Results are discussed regarding institutional theory, legitimacy theory and diffusion of innovation theory.

Findings

The study suggests that motivations for adopting IR change over time and participation in the IR-PP helps Eni acquire a comprehensive and substantial integrated view of value creation over time, makes integrated culture a key factor for strategic business sustainability and confirms the readiness of early adopters to comply with the non-financial Directive (NFD).

Originality/value

This study, among the few longitudinal case studies, provides organisations, regulators and academics with insights into the motivations driving the successful adoption and implementation of IR and the NFD. The results may help companies consider one of the tools currently deemed to bring sustainability into action and participation in pilot groups.

Details

Journal of Accounting & Organizational Change, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1832-5912

Keywords

Article
Publication date: 11 July 2023

Anthony Nkrumah Agyabeng, Justice Nyigmah Bawole, Albert Ahenkan, James Kwame Mensah and Alexander Preko

In the space of slums are many stakeholders; the extent to which their assistance contributes to slum administration is sparsely studied. The study aims to examine how external…

Abstract

Purpose

In the space of slums are many stakeholders; the extent to which their assistance contributes to slum administration is sparsely studied. The study aims to examine how external stakeholders contribute to slum administration within the Ghanaian context.

Design/methodology/approach

Using the stakeholder theory, the study used an exploratory qualitative design based on face-to-face, in-depth interviews among 21 respondents. Participants were purposively selected from stakeholder organisations and slum residents based on the stake in slums governance in Ghana.

Findings

The results indicate that stakeholders have contributed towards slums livelihoods in the general areas of housing, trading, skill development and capacity building. It shows that stakeholders’ contributions tend to enhance slums’ living conditions and affect local assemblies positively. The study finds that slum dwellers categorise stakeholders’ contributions as short-term relief and long-term solutions. Additionally, it emerged that in the areas of policy design, implementation and policy feedback, external stakeholders have supported the government in that regard.

Research limitations/implications

The conclusion drawn from the study is limited to the four communities and the stakeholder organisations. However, communities with similar characteristics globally might benefit from the findings.

Practical implications

The study uncovers a context-specific role and assistance of external stakeholders in the domain of slums. This provides a guide to the government regarding key areas of stakeholder collaboration towards slum governance in the Ghanaian context. Theoretically, this study has contributed to new knowledge about stakeholders’ contribution to the overall governance of slums.

Originality/value

The study expands the frontiers of knowledge in the field of slum administration by focusing on external stakeholders. This study departs from previous studies, which have examined, in broader perspectives, stakeholders’ roles within the space of slums.

Details

Social Responsibility Journal, vol. 20 no. 3
Type: Research Article
ISSN: 1747-1117

Keywords

1 – 10 of 503