Denise Ann Brady, Patricia Tzortzopoulos, John Rooke, Carlos Torres Formoso and Algan Tezel

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a…

8223

Abstract

Purpose

The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control.

Design/methodology/approach

Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type.

Findings

The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand.

Originality/value

The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 March 2018

Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…

3811

Abstract

Purpose

The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.

Design/methodology/approach

Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.

Findings

The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.

Research limitations/implications

Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.

Originality/value

The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 31 December 2010

Richard W. Shannon

Busan (Pusan), Korea’s second largest city (population 3.6 million) and fifth busiest port in the world, is experiencing rapidly increasing trade, global connections, events, and…

Abstract

Busan (Pusan), Korea’s second largest city (population 3.6 million) and fifth busiest port in the world, is experiencing rapidly increasing trade, global connections, events, and resulting infrastructural projects. What should Busan do to better handle the social, political, and economic complexities brought by these changes?

To answer this question, this paper explores the relationship of globalization and culture, as treated by cultural anthropology. It also considers how the tools of applied social science and anthropology can be mobilized to help Busan and the southeast region of Korea deal with these challenges.

After introducing anthropological treatments of culture, globalization and global problems, I discuss how applied social science/anthropology is used in international business/trade, tourism, and transport/logistics, especially the third area. To show how applied social science can help transportation and logistics projects in Busan and Korea, I present lessons from case studies and examples in Denver, Colorado Springs, Chuuk (Truk, South Pacific), and Korea.

Applied social science and applied anthropology present a wealth of helpful methods and insights to help Busan and Korea improve planning, public participation, political, social and environmental issues in transport and logistics projects, and to help prevent ethical and budgetary lapses. Finally, I offer suggestions for initial training programs and future studies to help expedite these goals.

Details

Journal of International Logistics and Trade, vol. 8 no. 2
Type: Research Article
ISSN: 1738-2122

Keywords

Open Access
Article
Publication date: 13 May 2022

Saleh Alsulamy

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants'…

2857

Abstract

Purpose

The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage.

Design/methodology/approach

Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study.

Findings

The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Research limitations/implications

Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages.

Originality/value

The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 3
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 15 May 2019

Laura-Maija Hero and Eila Lindfors

Collaboration between universities and industry is increasingly perceived as a vehicle to enhance innovation. Educational institutions are encouraged to build partnerships and…

14253

Abstract

Purpose

Collaboration between universities and industry is increasingly perceived as a vehicle to enhance innovation. Educational institutions are encouraged to build partnerships and multidisciplinary projects based around real-world open problems. Projects need to benefit student learning, not only the organisations looking for innovations. The context of this study is a multidisciplinary innovation project, as experienced by the students of an University of Applied Sciences in Finland. The purpose of this paper is to unfold students’ conceptions of the learning experience, to help teachers and curriculum designers to organise optimal conditions and processes, and support competence development. The research question was: How do students in higher professional education experience their learning in a multidisciplinary innovation project?

Design/methodology/approach

The study took a phenomenographic approach. The data were collected in the form of weekly diaries, maintained by the cultural management and social services students (n=74) in a mandatory multidisciplinary innovation project in professional higher education in Finland. The diary data were analysed using thematic inductive analysis.

Findings

The results of the study revealed that students’ understood the learning experience in relation to solvable conflicts and unusual situations they experienced during the project, while becoming aware of and claiming their collaborative agency and internalising phases of an innovation process. The competences as learning outcomes that students could name as developed related to content knowledge, different personal characteristics, social skills, emerging leadership skills, creativity, future orientation, social skills, technical, crafting and testing skills and innovation implementation-related skills, such as marketing, sales and entrepreneurship planning skills. However, future orientation and implementation planning skills showed more weakly than other variables in the data.

Practical implications

The findings suggest that curriculum design should enable networked, student-led and teacher supported pedagogical innovation processes that involve a whole path from future thinking and idea development through prototyping to implementation planning of the novel solution. Teachers promote deep comprehension of the innovation process, monitor and ease the pain of conflict if it threatens motivation, offer assessment tools and help in recognising gaps in individual competences and development needs, promote more future-oriented, concrete and implementable outcomes, and facilitate in bridging from innovation towards entrepreneurship planning.

Originality/value

The multidisciplinary innovation project described in this study provides a pedagogical way to connect higher education to the practises of society. These results provide encouraging findings for organising multidisciplinary project activities between education and working life. The paper, therefore, has significant value for teachers and entrepreneurship educators in designing curriculum and facilitating projects. The study promotes the dissemination of innovation development programmes in between education and work organisations also in other than technical and commercial fields.

Open Access
Article
Publication date: 18 April 2023

Tommi Pauna, Jere Lehtinen, Jaakko Kujala and Kirsi Aaltonen

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental…

2168

Abstract

Purpose

The aim of this research was to understand how governmental stakeholder engagement facilitates the sustainability of industrial engineering (IE) projects. A model for governmental stakeholder engagement activities is presented.

Design/methodology/approach

The authors relied on a single-case study of a mining project in Northern Europe, where a novel collaboration and engagement approach with governmental stakeholders was piloted in the project's front-end phase. The analysis focused on the collaborative practices through which the IE project investor engaged governmental stakeholders during the project's front-end phase and how the engagement contributed to solving challenges in the early planning and permitting process and achieving project plans that balanced economic, social and environmental aspects.

Findings

The findings show how four collaborative engagement practices reduced uncertainty and equivocality related to the legal sustainability requirements, enabled the development of sustainable design solutions and overall accelerated the permitting process without compromising the quality of final project plans.

Practical implications

The findings can be used to plan governmental stakeholder engagement and understand related challenges that need to be overcome. The study highlights the need to develop established practices and guidelines for governmental stakeholder engagement.

Originality/value

This study complements prior research on stakeholder engagement and project sustainability by developing an understanding of how governmental stakeholder engagement can be a key mechanism enabling the sustainability of IE project's end product. This research contributes to stakeholder theory by elaborating on a new stakeholder role, intermediary stakeholder.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 29 August 2021

Bert de Groot, Wim Leendertse and Jos Arts

Learning across teams and organisational levels enables organisations to deal with challenges that arise from changing contexts. Project-oriented organisations increasingly use…

2375

Abstract

Purpose

Learning across teams and organisational levels enables organisations to deal with challenges that arise from changing contexts. Project-oriented organisations increasingly use programme management to cope with such challenges and improve performance. This paper aims to find out how different programme configurations affect learning across project teams and between project teams and their parent organisation in project-oriented organisations.

Design/methodology/approach

A case study of a project-oriented organisation involved in five infrastructure programmes was performed.

Findings

The studied programmes linked learning processes at group and organisational levels by creating relationships across project teams and their parent organisation and acting as a knowledge centre. Team learning benefits from the learning culture and stable environment that programmes create for project teams. This study indicates that a programme’s features and focus strongly determines whether a programme predominantly enhances learning across project teams or learning between project teams and their parent organisation.

Originality/value

Although programme management is increasingly used by project-oriented organisations, there are few studies relating to learning in programmes. This study provides new insights into learning across teams through programmes.

Details

The Learning Organization, vol. 29 no. 1
Type: Research Article
ISSN: 0969-6474

Keywords

Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5351

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Open Access
Article
Publication date: 14 May 2020

Ulrika Uotila, Arto Saari and Juha-Matti Junnonen

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study…

1910

Abstract

Purpose

Public authorities are required to organise new facilities to respond to changed user demands in terms of a public-owned school. The number of pupils attending the case study school will increase in the following years, as will the number of children attending a day nursery located on the present campus. In addition, the users of the campus have complained of building-related symptoms. This study aims to understand the municipal decision-making process in organising the school’s facilities, in particular, the factors used for decreasing uncertainty around a project.

Design/methodology/approach

This study is a case study undertaken through an action research approach. The researchers participated in the project planning meetings concerning the future activities to take place in the building.

Findings

Over a 13-month period, multiple stakeholders participated in the project planning meetings providing a deeper understanding of the space demands posed, current challenges and opportunities offered by the existing building. In addition, the alternative solutions generated were evaluated. The problem identification and information gathering periods lasted over nine months, which was far longer than predicted. Thus, generating alternative solutions and evaluation of the solutions also delayed. As the entire process was delayed substantially, the final decision on organising the facilities was not made during this research.

Practical implications

This research may be of practical value for a property owner and a project team for decision-making concerning changed facility demands.

Originality/value

This paper provides information about how public authorities are making decisions on facility organisation during conditions of uncertainty.

Open Access
Article
Publication date: 26 June 2023

Petter Haglund and Mats Janné

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service…

1146

Abstract

Purpose

The construction industry shows an increased interest in how to manage logistics within construction projects. Often construction logistics is outsourced to a logistics service provider (LSP). However, construction logistics is normally approached either as a strategic decision or as an operational issue and rarely as a tactical concern. The purpose of this study is to explore how to organize the logistics outsourcing decision at strategic, tactical and operational levels.

Design/methodology/approach

This study is performed as a single-case study within a construction corporation, containing (amongst others) a building contractor (BC) and a construction equipment rental company (CERC) offering logistics services.

Findings

The study shows that to procure construction logistics service successfully, BCs need logistics capabilities at strategic and tactical levels to maintain an alignment between the use of logistics services and operational characteristics. Simultaneously, CERC’s need to design their service offerings to correspond to the needs of the BC.

Research limitations/implications

This study builds on a single-case study of a Swedish construction corporation. Further research is needed to better understand current logistics outsourcing and development practices and how these can be improved to foster better logistics management at the project level.

Practical implications

BCs find suggestions of different logistics organization structures and suitable outsourcing arrangements. CERCs and LSPs can use the findings to understand their customers’ needs and adapt service offerings.

Originality/value

To the best of the authors’ knowledge, this study is one of the first studies of how two companies within a corporation can work together to develop construction logistics service offerings.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175