Publication date: 3 April 2007

Vivian W.Y. Tam, C.M. Tam and William C.Y. Ng

The use of prefabrication has been considered as one of the most effective waste minimization methods in the construction context; however, the industry has found difficulties to…

5809

Abstract

Purpose

The use of prefabrication has been considered as one of the most effective waste minimization methods in the construction context; however, the industry has found difficulties to implement it. Contractors lack experience in using prefabrication and they do not know how to implement prefabrication to their projects effectively. The purpose of this paper is to present the findings of a study on the implementation of prefabrication in the context of different project types and procurement approaches.

Design/methodology/approach

This paper examines possible project types and procurement methods to maximally gain benefits of using prefabricated building components. A questionnaire survey and structured interviews have been conducted.

Findings

From the results, it should be noted that residential projects and design and build procurement methods are the most effective project types and procurement methods, respectively, in using prefabrication. In the interview discussion, one of the governmental employees highlighted that about 65 percent of projects are residential projects. The high supply of residential housing suits fast population growth in Hong Kong. The interviewee also explained that shortening construction period is one of the main goals in their projects. Furthermore, an interviewed main contractor highlighted that the involvement of contractors at the early design stage in a project can bring advantages in considering construction methods before project commencement on site and to improve project constructability. An interviewed subcontractor also explained that the involvement of construction organizations in the design stage can effectively improve the use of prefabrication in major activities including concreting, plastering and formworking, rather than wet‐trade construction activities. Therefore, the use of standardized designs and prefabricated building components are highly encouraged.

Originality/value

This brings early considerations and suggestions to project parties to improve prefabrication implementation. The effects of prefabrication implementation are also considered.

Details

Journal of Engineering, Design and Technology, vol. 5 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 29 March 2021

Rita Lavikka, Krishna Chauhan, Antti Peltokorpi and Olli Seppänen

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among…

2510

Abstract

Purpose

Systemic innovations emerge and create value in an inter-organisational context. However, innovation studies rarely investigate the role of value creation and value capture among multiple organisations in successful innovation implementation. This paper aims to understand the role of value creation and value capture in the implementation of systemic innovations in construction which is by nature, an inter-organisational context.

Design/methodology/approach

The empirical research focused on the barriers, enablers and opportunities for value creation and value capture of the Finnish construction project parties when trying to implement mechanical, electrical and plumbing (MEP) prefabrication, which is a systemic innovation. Data were collected through interviews, observations and action workshops.

Findings

The empirical study identified interaction patterns on how social, political, technical and economic barriers lead to uneven value capturing, lack of value-based procurement and unclear value creation between MEP design and installation. They hinder the implementation of MEP prefabrication. The results point to enablers leading to fairly shared value to all parties, procurement of value and collaborative value creation, thus increasing the usage of MEP prefabrication, a systemic innovation.

Originality/value

The study adds new knowledge by demonstrating that the identification of barriers and their interaction with enablers and opportunities for value creation and capture lay a baseline for suggestions on how to implement a systemic innovation. This study stresses the importance of enabling value creation and capture for all construction project parties when implementing a systemic innovation.

Details

Construction Innovation , vol. 21 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2674

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 20 May 2024

Janappriya Jayawardana, Malindu Sandanayake, Supun Jayasinghe, Asela Kulatunga and Guomin Zhang

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated…

Abstract

Purpose

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated strategy framework to mitigate and overcome the obstacles.

Design/methodology/approach

The research process included a comprehensive literature review, a pilot study, a questionnaire survey for data collection, statistical analysis and a qualitative content analysis.

Findings

Ranking method revealed that all 23 barriers were significant. Top significant barriers include challenges in prefabricated component transportation, high capital investment costs and lack of awareness of the benefits of PFC among owners/developers. Factor analysis clustered six barrier categories (BCs) that fit the barrier factors, explaining 71.22% of the cumulative variance. Fuzzy synthetic evaluation revealed that all BCs significantly influence PFC adoption in Sri Lanka. Finally, the proposed mitigation strategies were mapped with barriers to complete the integrated framework.

Practical implications

The study outcomes are relevant to construction industry stakeholders of Sri Lanka, who are keen to enhance construction efficiencies. The implications can also benefit construction industry stakeholders and policymakers to formulate policies and regulations and identify mitigation solutions.

Originality/value

The study provides deeper insights into the challenges to adopting prefabrication in South Asian countries such as Sri Lanka. Furthermore, the integrated framework is a novel contribution that can be used to derive actions to mitigate barriers in developing economies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 May 2016

Daniel O'Neill and Samantha Organ

The purpose of this paper is to explore academic papers and reports and present a chronology of the evolution of British low-rise prefabricated housing. The paper provides…

3697

Abstract

Purpose

The purpose of this paper is to explore academic papers and reports and present a chronology of the evolution of British low-rise prefabricated housing. The paper provides chronological information for construction and surveying researchers undertaking research in associated areas.

Design/methodology/approach

This is a qualitative literature review, providing an exploration and analysis of academic papers and reports on low-rise prefabricated housing.

Findings

A substantial literature was discovered. However, there are gaps in the available literature. The history of British construction technology is a rich research area but is under-researched. Prefabricated housing has a long history dating back to the eleventh century. Stigmatised from the failures of housing in the twentieth century, it is being increasingly used again in the twenty-first century when considering mass housing supply.

Research limitations/implications

This paper provides researchers with an overview of the history of low-rise prefabricated housing in Britain. It is not a comprehensive in-depth study; such would require numerous larger individual studies.

Originality/value

From reviewing literature it was evident that there was a broad literature, but there was no single journal publication exploring the evolution of British low-rise prefabricated housing. The research provides an overview, exploration and analysis of the literature while providing a chronology. The evolution of prefabricated housing is chronologically presented. Areas for further research are also recommended.

Details

Structural Survey, vol. 34 no. 2
Type: Research Article
ISSN: 0263-080X

Keywords

Book part
Publication date: 13 September 2018

Abbas Elmualim, Sherif Mostafa, Nicholas Chileshe and Raufdeen Rameezdeen

This chapter discusses the profound and influential impact the construction industry has on the national economy, together with the huge negative effect it has on the environment…

Abstract

This chapter discusses the profound and influential impact the construction industry has on the national economy, together with the huge negative effect it has on the environment. It argues that by adopting smart and industrialised prefabrication (SAIP), the Australian construction industry, and the construction industry globally, is well positioned to leverage the circular economy to advance future industries with less impact on our natural environment. It discusses aspects of the application of digital technologies, specifically building information modelling, virtualisation, augmented and virtual reality and 3D printing, coupled with reverse logistics as a proponent for advancing the circular economy through smart, digitally enabled, industrialised prefabrication. It further postulates a framework for SAIP for the circular economy.

Details

Unmaking Waste in Production and Consumption: Towards the Circular Economy
Type: Book
ISBN: 978-1-78714-620-4

Keywords

Article
Publication date: 4 June 2024

Tai Wai Kwok and SiWei Chang

Digital technology, which is regarded as a prominent and transformational force in modern society, encompasses a wide variety of technology that utilize digital data to process…

Abstract

Purpose

Digital technology, which is regarded as a prominent and transformational force in modern society, encompasses a wide variety of technology that utilize digital data to process, store and transfer various types of information. Digital technologies have continually been introduced as cutting-edge information tools in order to achieve effective management of vast information that arises from the prefabrication supply chain. However, without a sufficient performance evaluation, drawbacks of technology investment, such as financial losses and ineffective resource allocation, keep occurring, which hinders the widespread implementation of digital technologies. This study demonstrates a comprehensive evaluation of digital technologies’ effects on the prefabrication supply chain based on multi-criteria decision analysis (MCDA) theory.

Design/methodology/approach

Specifically, the targeted digital technologies and project constraints were first identified through a systematic literature review. The effects of the digital technologies were then scored using a questionnaire survey. The TOPSIS model was established to quantitatively rank the effectiveness of selected digital technologies.

Findings

Overall, BIM technology shone out in the rankings and is regarded as the most beneficial digital solution by multi-stakeholders to the existing constraints, such as working efficiency. Collaboration patterns between different stakeholders and technology integration trend were also indicated.

Originality/value

Compared with existing outcomes, this study specifically focused on examining the effects of digital technologies on the prefabrication supply chain, the most significant link in the process for prefabricated structures. New findings indicate the overall performance that considered both multi-stakeholders’ preferences and project constraints. The quantitative evaluation presents a comprehensive understanding of digital technologies’ effects, enabling industrial participants to reach well-informed, strategic and profitable investment decisions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 August 2024

Buddhini Ginigaddara, Mahmoud Ershadi, Marcus Jefferies and Srinath Perera

Recent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project…

Abstract

Purpose

Recent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project management techniques. While previous research mainly focuses on transformations related to digital and advanced technologies driven by industry 4.0 principles, a research gap still exists on the intersection of project management capabilities and OSC. This study attempts to bridge this gap by capturing the homogeneity of different capabilities and integrating them into an overarching framework.

Design/methodology/approach

A scientometric analysis is conducted to provide an overview of the co-occurrence network of keywords in the representative studies. A systematic literature review (SLR) of articles published between 2010 and 2022, followed by a subsequent full-text examination of 63 selected articles, revealed 34 interrelated capabilities to be categorised under three exhaustive planning-oriented, design-oriented and delivery-oriented groups.

Findings

This review revealed an upward trend of publication on project management capabilities for OSC with a specific interest in optimisation of resources allocated to offsite operations. The top five capabilities discussed more frequently in the literature include (1) artificial intelligence for design error detection, (2) enhanced resource productivity, (3) cost saving in offsite production, (4) real-time traceability of modules and (5) applying lean agile production principles to OSC, which imply the critical role of quality, cost saving, traceability and agility in OSC.

Originality/value

This study elicits core capabilities and develops a new offsite project management framework for the first time. The authors provide directions for researchers and practitioners to apply capabilities for obtaining better outcomes and higher value out of offsite operations.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 May 2023

Rakesh Sai Kumar Mandala and R. Ramesh Nayaka

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also…

Abstract

Purpose

This paper aims to identify modern construction techniques for affordable housing, such as prefabrication and interlocking systems, that can save time and cost while also providing long-term sustainable benefits that are desperately needed in today's construction industry.

Design/methodology/approach

The need for housing is growing worldwide, but traditional construction cannot cater to the demand due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society. This paper presented a state-of-the-art review of modern construction techniques practiced worldwide and their advantages in affordable housing construction by conducting a systematic literature review and applying the backward snowball technique. The paper reviews modern prefabrication techniques and interlocking systems such as modular construction, formwork systems, light gauge steel/cold form steel construction and sandwich panel construction, which have been globally well practiced. It was understood from the overview that modular construction, including modular steel construction and precast concrete construction, could reduce time and costs efficiently. Further enhancement in the quality was also noticed. Besides, it was observed that light gauge steel construction is a modern phase of steel that eases construction execution efficiently. Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time, which leads to faster construction than traditional formwork. However, the cost is subjected to the repetitions of the formwork. An interlocking system is an innovative approach to construction that uses bricks made of sustainable materials such as earth that conserve time and cost.

Findings

The study finds that the prefabrication techniques and interlocking system have a lot of unique attributes that can enable the modern construction sector to flourish. The study summarizes modern construction techniques that can save time and cost, enhancing the sustainability of construction practices, which is the need of the Indian construction industry in particular.

Research limitations/implications

This study is limited to identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Practical implications

Modern formwork systems such as Mivan (Aluminium Formwork) have been reported for their minimum construction time which leads to faster construction than traditional formwork.

Social implications

The need for housing is growing rapidly all over the world, but traditional construction cannot cater to the need due to insufficient time. There should be some paradigm shift in the construction industry to supply housing to society.

Originality/value

This study is unique in identifying specific modern construction techniques for time and cost savings, lean concepts and sustainability which are being practiced worldwide.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 January 2021

Sheryl Staub-French, Angelique Pilon, Erik Poirier, Azadeh Fallahi, Mohamed Kasbar, Francisco Calderon, Zahra Teshnizi and Thomas Froese

The purpose of this paper is to present the construction process innovations that enabled the successful delivery of the hybrid mass timber high-rise building in Canada, the Brock…

Abstract

Purpose

The purpose of this paper is to present the construction process innovations that enabled the successful delivery of the hybrid mass timber high-rise building in Canada, the Brock Commons Tallwood House at the University of British Columbia. It is one of a set of papers examining the project, including companion papers that describe innovations in the mass timber design process and the impact of these innovations on construction performance. The focus of this paper is on innovation in the construction phase and its relationship to innovations implemented in previous project phases.

Design/methodology/approach

A mixed-method, longitudinal case study approach was used in this research project to investigate and document the Tallwood House project over a three-year period. Both quantitative and qualitative data collection and analysis techniques were used. Members of the research team observed prefabrication and construction, conducted periodic interviews and reviewed project artefacts.

Findings

The research identified three innovation “clusters,” including the use of innovative tools, techniques and strategies in the design and construction processes and the role they played in delivering the project. The “clusters” were further characterized according to the type of “connectivity” they afforded, either facilitation, operationalization or materialization. These two perspectives support a compounding view on innovation and help to understand how it can flow throughout a project’s life cycle and across its supply chain. Three process-based innovations were initiated during the design phase, integrated design process, building information modeling and virtual design and construction and flowed through to the construction phase. These were seen to enable the creation of connections that were crucial to the overall success of the project. These innovations were operationalized and enacted through the construction phase as design for manufacturing and assembly and prefabrication, staged construction and just-in-time delivery, integration of safety and risk management and a rigorous quality control and quality assurance process. Finally, a full-scale mock-up was produced for practice and constructability assessment, materializing the radical product innovation that was the mass timber structure. These strategies are used together for a synergistic and integrated approach to increase productivity, expedite the construction schedule and develop an innovative building product.

Originality/value

This paper details an in-depth investigation into the diffusion dynamics of multiple systemic innovations for the construction process of a unique building project, the tools and techniques used by the construction manager and team, and the challenges, solutions and lessons learned.