1 – 10 of 265
Article
Publication date: 2 September 2020

Wei Hu and Kamalesh Panthi

Successful performance and execution of construction projects depend highly on a good project control system capable of tracking and reporting project status on a desired time…

Abstract

Purpose

Successful performance and execution of construction projects depend highly on a good project control system capable of tracking and reporting project status on a desired time interval. The purpose of this paper is to propose such a control system by integrating spreadsheet and Visual Basic for Application to produce a customized tracking system for Pipeline Relocation Programs under Engineering, Procurement and Construction Management (EPCM) contracts.

Design/methodology/approach

The project status reporting system (PSRS) proposed here was developed to produce a single page summary report that would include scope information, financial status, descriptive status updates and top-level task schedules. This information is retrieved from various sources and transformed further utilizing specific formulas and algorithm needed to compute the budget and schedule status of the pipe relocation project. A practical case study is used to demonstrate its unique application.

Findings

The system has successfully integrated project finance and schedule information into a central control hub. Financial and schedule performance of a project is tracked and monitored by the PSRS automatically.

Originality/value

The proposed system utilizes the powerful computing capability of MS Excel and the user-friendly VBA programming tool to customize the reporting needs of a project and program environment. The proposed system, whose functionality has been validated by the intended users, tries to achieve a balance between simplicity, accuracy and effectiveness for the flow of information at a much lower cost compared to the other readily available project control software.

Details

Built Environment Project and Asset Management, vol. 10 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 April 2018

Aneetha Vilventhan and Satyanarayana N. Kalidindi

Utility relocation issues are unfortunately frequent and recurring problems in several countries’ highway projects. Very few studies have addressed the utility relocation issues…

Abstract

Purpose

Utility relocation issues are unfortunately frequent and recurring problems in several countries’ highway projects. Very few studies have addressed the utility relocation issues in highway projects. The purpose of this paper is two-fold. First, this paper explores how the utility relocation issues are managed in highway projects. Second, this paper systematically identifies the prioritized technical and coordination strategies to be adopted to avoid delays in utility relocation.

Design/methodology/approach

Multiple case-based research methodology was used to explore how the utility relocation issues are managed in highway projects. Empirical evidences from 11 road and bridge projects in India were used to develop the descriptive storyline for each of the project. The strategies used to manage the utility relocation issues were identified from three sources namely literature review, case studies and nominal group technique (NGT). The strategies were then evaluated quantitatively using NGT.

Findings

The analysis of the case studies showed that the delays in utility relocation were in the range of 5-52 months. It was found that the duration of relocation of utilities is impacted more significantly by the complexity of underground utilities rather than the size of the projects. Strategies that are used to manage utility relocation were identified across two groups namely; technical and coordination strategies.

Practical implications

Recommendations are provided for the practical use and policy changes.

Originality/value

The prioritized technical and coordination strategies can be used systematically to avoid delays in utility relocation.

Details

Built Environment Project and Asset Management, vol. 8 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 1 June 2004

Alexandros Kallantzis and Sergios Lambropoulos

A scheduling method for determining the critical path in linear projects is presented, that takes into account maximum time and distance constraints in addition to the commonly…

2207

Abstract

A scheduling method for determining the critical path in linear projects is presented, that takes into account maximum time and distance constraints in addition to the commonly used minimum time and distance constraints. The maximum constraints, though often present in the specifications of a project, are not considered during the planning procedure, since no method existed to enable scheduling with them. The proposed method builds on the concept of the maximum constraints and expands on the necessary background for their implementation into the schedule. The introduced critical path algorithm allows for grouping linear activities into four categories regarding their critical status and their ability to influence project duration. The method is applied to a low‐pressure pipeline construction project and the results are presented.

Details

Engineering, Construction and Architectural Management, vol. 11 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 December 2022

Zhenhua Luo, Juntao Guo, Jianqiang Han and Yuhong Wang

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in…

Abstract

Purpose

Prefabricated technology is gradually being applied to the construction of subway stations due to its characteristic of mechanization. However, the prefabricated subway station in China is in the initial stage of development, which is prone to construction safety issues. This study aims to evaluate the construction safety risks of prefabricated subway stations in China and formulate corresponding countermeasures to ensure construction safety.

Design/methodology/approach

A construction safety risk evaluation index system for the prefabricated subway station was established through literature research and the Delphi method. Furthermore, based on the structure entropy weight method, matter-element theory and evidence theory, a hybrid evaluation model is developed to evaluate the construction safety risks of prefabricated subway stations. The basic probability assignment (BPA) function is obtained using the matter-element theory, the index weight is calculated using the structure entropy weight method to modify the BPA function and the risk evaluation level is determined using the evidence theory. Finally, the reliability and applicability of the evaluation model are verified with a case study of a prefabricated subway station project in China.

Findings

The results indicate that the level of construction safety risks in the prefabricated subway station project is relatively low. Man risk, machine risk and method risk are the key factors affecting the overall risk of the project. The evaluation results of the first-level indexes are discussed, and targeted countermeasures are proposed. Therefore, management personnel can deeply understand the construction safety risks of prefabricated subway stations.

Originality/value

This research fills the research gap in the field of construction safety risk assessment of prefabricated subway stations. The methods for construction safety risk assessment are summarized to establish a reliable hybrid evaluation model, laying the foundation for future research. Moreover, the construction safety risk evaluation index system for prefabricated subway stations is proposed, which can be adopted to guide construction safety management.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 1980

IN every sector of endeavour, the professions not excluded, progress has been accompanied by fear that it would be followed by unemployment. To some extent it is true and…

Abstract

IN every sector of endeavour, the professions not excluded, progress has been accompanied by fear that it would be followed by unemployment. To some extent it is true and inevitable, of course. The invention of printing made the work of monks and scribes unnecessary. Then that was followed by metal type, that put the carvers of wood type out of work, followed in turn by Linotype machines making much arduous hand setting and subsequent distributing the separate letters back into their cases less in demand. Copying machines meant a virtual end to the need for tracers. Computers cut the requirements of many offices and robots are taking over in factories the more arduous, heavy or unpleasant tasks hitherto done, however reluctantly, by men.

Details

Work Study, vol. 29 no. 3
Type: Research Article
ISSN: 0043-8022

Article
Publication date: 19 October 2020

Aneetha Vilventhan, Sanu Razin and R. Rajadurai

The relocation of existing underground utilities in urban environments is complex because of the existence of multiple utility agencies being responsible for numerous utilities…

Abstract

Purpose

The relocation of existing underground utilities in urban environments is complex because of the existence of multiple utility agencies being responsible for numerous utilities and over constrained space and time to execute maintenance works. Unfamiliar location and insufficient records of maintenance data hamper the flow of work, causing unnecessary delays and conflicts. The aim of the paper is to explore 4 dimensional Building Information Modeling as a smart solution for the management of multiple utility data for a relocation project in an urban setting.

Design/methodology/approach

An empirical case-based research methodology is used to collect data and develop the BIM models. Two ongoing construction projects in an urban city are empirically studied, and 4D BIM models of identified utilities are developed to assist management and relocation of existing utilities.

Findings

The developed BIM models enabled the location of existing sub-surface utilities through 3D visualization and also enabled clash detection. The 4D simulation of BIM model enabled the tracking of actual progress of relocation works and thereby helped in taking necessary actions to minimize forthcoming delays. The evaluation of the developed model showed that the application of 4D BIM improved communication and coordination during utility relocation works.

Practical implications

4D BIM for utility infrastructure provides better management of utility information. They provide utility stakeholders an efficient way to coordinate, manage utility relocation processes through improved visualization and communication with a reduction in delays and conflicts.

Originality/value

Limited efforts were made using 3D BIM for sub-surface utility infrastructure in visualization and management of utility information. Efforts using 4D BIM in coordination and management of utility projects are left unexplored. This study adds value to the current literature through the application of 4D BIM for utility relocation projects.

Article
Publication date: 22 September 2021

R. Rajadurai and Aneetha Vilventhan

Transportation infrastructure projects are inevitably delayed due to delays in the completion of underground utility relocation. Unfamiliar location, difficulty in utility…

Abstract

Purpose

Transportation infrastructure projects are inevitably delayed due to delays in the completion of underground utility relocation. Unfamiliar location, difficulty in utility identification and use of ineffective coordination practices hamper timely completion of utility relocation works. This paper aims to develop integrated road information modeling (RIM) and geographic information system (GIS) models to assist early identification of utilities and effective coordination during utility relocation in infrastructure projects.

Design/methodology/approach

An ethnographic action-based case study research methodology was adopted in this paper. Two ongoing infrastructure projects with significant utility relocation delays are chosen as case studies and integrated RIM-GIS models are developed to assist utility relocation. To verify the applications of developed RIM-GIS models, a focus group discussion was conducted with 10 field experts from the considered case studies.

Findings

The application of the developed RIM-GIS models enabled 3D visualization of existing underground utilities and enabled identification of utility conflicts before the start of the construction. They also enabled facilitating coordination and reduce utility relocation delays. The evaluation of the developed models shows that the RIM-GIS model approach enabled early planning and coordination and facilitates effective management of utility relocations.

Practical implications

The current practices of using CAD and GIS for utility relocations are inadequate due to the difficulties in characterizing utilities and ineffective coordination practices. The proposed RIM-GIS approach can be adopted as a suitable alternative for effective management of utility relocations.

Originality/value

Several studies have contributed toward integrating BIM and GIS for the analysis of highway and utility infrastructure projects. Efforts on integrating RIM and GIS for the support and management of utility relocations in highway and utility infrastructure projects remain unexplored.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 May 2016

Aneetha Vilventhan and Satyanarayana N. Kalidindi

Relocation of utilities is a major source of delay in Indian infrastructure projects. This delay is particularly critical in road and bridge construction projects. The purpose of…

Abstract

Purpose

Relocation of utilities is a major source of delay in Indian infrastructure projects. This delay is particularly critical in road and bridge construction projects. The purpose of this paper is to identify the various factors and also the interrelationships between the factors which influence the delays in the relocation of utilities.

Design/methodology/approach

Case studies were conducted on 11 road and bridge projects in India with varying levels of complexity and size. Factors causing relocation delays were identified using computer aided qualitative analysis methodology. Cognitive mapping technique was used to map the interrelationships between the factors and to identify the critical delay factors.

Findings

Factors affecting delays were identified across two groups, namely, technical and organizational factors. The study offers insights into the kinds of interactions of factors that can lead to delays in a project. The critical factors causing delays were identified as slow response from utility agencies, difficulty in identification of underground utilities, lack of information on underground utilities and conflict between agencies.

Research limitations/implications

The limitations of the study are that the interview respondents are not evenly distributed among the type of organizations which may have induced some bias in responses. The impact of the utility relocation delays on the overall project delay has to be detailed further.

Practical implications

The interrelationships between factors has the potential to help the officials of highway department, contractors, utility agencies and others understand how various interactions/linkages of factors contributes to delays in utility relocations. Recommendations are provided for the practical use and to reduce the impact of delays.

Originality/value

Utility relocation has received very little attention in the extant literature and this paper seeks to contribute to knowledge in this area by identifying the linkages between factors and the critical factors of utility relocation delays in India.

Details

Engineering, Construction and Architectural Management, vol. 23 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 June 1988

Peter T. Ward, Jeffrey G. Miller and Thomas E. Vollmann

The manufacturing strategy literature suggests a number of areas in which decisions are of strategic importance. This study uses a survey of manufacturing executives from 213…

Abstract

The manufacturing strategy literature suggests a number of areas in which decisions are of strategic importance. This study uses a survey of manufacturing executives from 213 business units in the United States to explore empirically the concept of strategic decision categories and improvement programmes that are related to each category. The concerns expressed by the 213 manufacturing executives are categorised and are shown to correspond fairly well with the strategic decision categories from the literature. The survey responses to questions about plans for programmes and activities to improve manufacturing over the next 2 years are also categorised. The relationships between planned programme categories and the strategic concerns that underlie them are explored and summarised.

Details

International Journal of Operations & Production Management, vol. 8 no. 6
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 12 March 2020

Frank Siedlok, Paul Hibbert and Fiona Whitehurst

The purpose of this paper is to develop a more detailed understanding of how embedding in different social networks relates to different types of action that individuals choose in…

1784

Abstract

Purpose

The purpose of this paper is to develop a more detailed understanding of how embedding in different social networks relates to different types of action that individuals choose in the context of organizational closures, downsizing or relocations. To develop such insights, this paper focuses on three particular types of social networks, namely, intra-organizational; external professional and local community networks. These three types of networks have been frequently related to different types of action in the context of closures and relocations.

Design/methodology/approach

This is a conceptual paper. The authors develop the argument by integrating relevant recent literature on the salience related to embedding in different types of social networks, with a particular focus on responses to organizational closure or relocation.

Findings

The authors argue that at times of industrial decline and closure: embeddedness in intra-organizational networks can favor collective direct action; embeddedness in professional networks is likely to favor individual direct action and embeddedness in community networks can lead to individual indirect action. The authors then add nuance to the argument by considering a range of complicating factors that can constrain or enable the course (s) of action favored by particular combinations of network influences.

Originality/value

On a theoretical level, this paper adds to understandings of the role of network embeddedness in influencing individual and collective responses to such disruptive events; and direct or indirect forms of response. On a practical level, the authors contribute to understandings about how the employment landscape may evolve in regions affected by organizational demise, and how policymakers may study with or through network influences to develop more responsible downsizing approaches.