To read this content please select one of the options below:

Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling

Alexandros Kallantzis (Senior Researcher, Department of Construction Management and Engineering, Faculty of Civil Engineering, National Technical University of Athens, Athens, Greece)
Sergios Lambropoulos (Assistant Professor, Department of Construction Management and Engineering, Faculty of Civil Engineering, National Technical University of Athens, Athens, Greece)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 June 2004

2228

Abstract

A scheduling method for determining the critical path in linear projects is presented, that takes into account maximum time and distance constraints in addition to the commonly used minimum time and distance constraints. The maximum constraints, though often present in the specifications of a project, are not considered during the planning procedure, since no method existed to enable scheduling with them. The proposed method builds on the concept of the maximum constraints and expands on the necessary background for their implementation into the schedule. The introduced critical path algorithm allows for grouping linear activities into four categories regarding their critical status and their ability to influence project duration. The method is applied to a low‐pressure pipeline construction project and the results are presented.

Keywords

Citation

Kallantzis, A. and Lambropoulos, S. (2004), "Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling", Engineering, Construction and Architectural Management, Vol. 11 No. 3, pp. 211-222. https://doi.org/10.1108/09699980410535813

Publisher

:

Emerald Group Publishing Limited

Copyright © 2004, Emerald Group Publishing Limited

Related articles