Article
Publication date: 23 November 2022

Ali Zavareh, Ehsan Fallahiarezoudar and Mohaddeseh Ahmadipourroudposht

This paper aims to optimize the maintenance scheduling of emergency rescue wagons in railway companies using a genetic algorithm (GA). It offers an integrated model for…

Abstract

Purpose

This paper aims to optimize the maintenance scheduling of emergency rescue wagons in railway companies using a genetic algorithm (GA). It offers an integrated model for simultaneously solving maintenance planning, preventive maintenance, prognostic information and resource planning from which optimal levels of the system performance in terms of cost and repair time could be determined.

Design/methodology/approach

This study initially evaluates the previous types of research in presenting the optimal model of the rescue train wagon for maintenance and repair planning and lists the identified criteria based on experts' opinions using fuzzy analytic hierarchy process (FAHP) and stepwise weight assessment ratio analysis (SWARA) techniques. Then, the final weight of the desired criteria is calculated. Later, the final decision matrix is evaluated by the experts. The final normal decision matrix is formed to select the optimal maintenance and repair planning plan based on the GA. Finally, two strategies including joint optimization strategy of preventive maintenance planning are compared with the independent preventive maintenance planning strategy.

Findings

According to the primary results, three primary parameters, including technology, human damage caused by negligence and the average failure rate, should be considered for launching the GA model. Based on the results of the second part; by comparing the preventive maintenance planning strategy independently, the joint optimization strategy reduces the total cost of production up to 8.25%. Comparison results show that the total cost of joint optimization production is less than independent preventive maintenance and repair planning. Moreover, the value of total process time in joint optimization strategy was reduced by 1.2% compared to independent preventive maintenance (PM) planning (from 137.90 to 136.20 h).

Originality/value

The novelty of this paper lies on the application of the GAs to develop an optimized PM scheduling to localize the maintenance planning for maximizing productivity, avoid train accidents, reduce costs and increase efficiency and capacity.

Details

International Journal of Quality & Reliability Management, vol. 40 no. 6
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 8 May 2017

Ernnie Illyani Basri, Izatul Hamimi Abdul Razak, Hasnida Ab-Samat and Shahrul Kamaruddin

The purpose of this paper is to provide comprehensive information on preventive maintenance (PM) planning and methods used in the industry in order to achieve an effective…

5061

Abstract

Purpose

The purpose of this paper is to provide comprehensive information on preventive maintenance (PM) planning and methods used in the industry in order to achieve an effective maintenance system.

Design/methodology/approach

The literature review is organized in a way that provides the general overview of the researches done in the PM. This paper discusses the literatures that had been reviewed on four main topics, which are the holistic view of maintenance policies, PM planning, PM planning concept and PM planning-based in developing optimal planning in executing PM actions.

Findings

PM policy is one of the original proactive techniques that has been used since the start of researches on maintenance system. Review of the methods presented in this paper shows that most researches analyse effectiveness using artificial intelligence, simulation, mathematical formulation, matrix formation, critical analysis and multi-criteria method. While in practice, PM activities were either planned based on cost, time or failure. Research trends on planning and methods for PM show that the variation of approaches used over the year from early 1990s until today.

Practical implications

Research about PM is known to be extensively conducted and majority of companies applied the policy in their production line. However, most analysis and method suggested in published literatures were done based on mathematical computation rather than focussing on solution to real problems in the industry. This normally would lead to the problems in understanding by the practitioner. Therefore, this paper presented researches on PM planning and suggested on the methods that are practical, simple and effective for application in the real industry.

Originality/value

The originality of this paper comes from its detail analysis of PM planning in term of its research focus and also direction for application. Extensive reviews on the methods adopted in relation to PM planning based on the planning-based such as cost-based, time-based and failure-based were also provided.

Details

Journal of Quality in Maintenance Engineering, vol. 23 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 19 October 2012

Premaratne Samaranayake and Senevi Kiridena

The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single…

3769

Abstract

Purpose

The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single integrated framework supported by unified data structures.

Design/methodology/approach

The “unitary structuring technique”, originally developed within the context of manufacturing planning and control, is further enhanced for aircraft heavy maintenance applications, taking into account the uncertainty associated with condition‐based maintenance. The proposed framework delivers the advanced functionalities required for simultaneous and dynamic forward planning of maintenance operations, as well as finite loading of resources, towards optimising the overall maintenance performance.

Findings

Execution of maintenance operations under uncertainty involves materials changes, rectification and re‐assembly. It is shown that re‐scheduling of materials (spare‐parts), resources and operations can be taken care of by simultaneous and dynamic forward planning of materials and operations with finite loading of resources, using the integrated framework.

Research limitations/implications

As part of adopting the proposed framework in practice, it needs to be guided by an overall methodology appropriate for application‐specific contexts.

Practical implications

The potential direct benefits of adopting the proposed framework include on‐time project completion, reduced inventory levels of spare‐parts and reduced overtime costs.

Originality/value

Existing approaches to aircraft maintenance planning and scheduling are limited in their capacity to deal with contingencies arising out of inspections carried out during the execution phase of large maintenance projects. The proposed integrated approach is, capable of handling uncertainty associated with condition‐based maintenance, due to the added functionalities referred to above.

Details

Journal of Quality in Maintenance Engineering, vol. 18 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 28 July 2020

Antti Salonen and Maheshwaran Gopalakrishnan

The purpose of this study was to assess the readiness of the Swedish manufacturing industry to implement dynamic, data-driven preventive maintenance (PM) by identifying the gap…

Abstract

Purpose

The purpose of this study was to assess the readiness of the Swedish manufacturing industry to implement dynamic, data-driven preventive maintenance (PM) by identifying the gap between the state of the art and the state of practice.

Design/methodology/approach

An embedded multiple case study was performed in which some of the largest companies in the discrete manufacturing industry, that is, mechanical engineering, were surveyed regarding the design of their PM programmes.

Findings

The studied manufacturing companies make limited use of the existing scientific state of the art when designing their PM programmes. They seem to be aware of the possibilities for improvement, but they also see obstacles to changing their practices according to future requirements.

Practical implications

The results of this study will benefit both industry professionals and academicians, setting the initial stage for the development of data-driven, diversified and dynamic PM programmes.

Originality/Value

First and foremost, this study maps the current state and practice in PM planning among some of the larger automotive manufacturing industries in Sweden. This work reveals a gap between the state of the art and the state of practice in the design of PM programmes. Insights regarding this gap show large improvement potentials which may prove important for academics as well as practitioners.

Details

Journal of Quality in Maintenance Engineering, vol. 27 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 4 March 2014

Shixiong Zhao, Liya Wang and Yu Zheng

Making decisions on production and maintenance separately, as is often done in practice and research literature, may not result in overall optimization. This paper aims to propose…

2730

Abstract

Purpose

Making decisions on production and maintenance separately, as is often done in practice and research literature, may not result in overall optimization. This paper aims to propose a joint method that better integrates production planning and maintenance at the tactical level. The potential of improving the performance of the classic planning method is also explored.

Design/methodology/approach

An integrated production planning and maintenance model is proposed. The production capacity losses resulted from both preventive and corrective maintenance activities are considered. Meanwhile, the reliability deterioration of the machine is considered to be operation dependent. An iterative approach is presented to find a solution for the nonlinear model through iteratively solving a sequence of mixed integer linear programming instances, accompanied by modification of some parameters prior to each iteration. Computational experiments are conducted to evaluate the performance of the proposed method compared with three other methods, including two methods based on separate planning and one integrated model.

Findings

The superiority of the proposed method compared with all the other three methods is demonstrated. Thus, the values of both integrated planning and considering operation-dependent failures are testified. The advantage of the proposed method is highlighted in the cases of high capacity utilization, long maintenance durations and low maintenance costs. The performance of the two methods based on separate planning is sensitive to the system utilization, and when utilization is high, the one with an availability-sensitive objective function defined for the maintenance problem performs better.

Originality/value

Few studies have been carried out to integrate decisions on production lot and maintenance. Their considerations are either incomplete or not realistic enough. A more comprehensive and realistic integrated model is proposed in this paper, along with an iterative solution algorithm for it. A potential way to improve the performance of the classic planning method with its simplicity preserved is also presented.

Details

Industrial Management & Data Systems, vol. 114 no. 2
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 30 January 2019

Umar Al-Turki, Salih Duffuaa and M. Bendaya

Turnaround maintenance (TAM) is a planned stoppage of production for conducting a comprehensive maintenance of equipment or plant with the purpose of improving plant availability…

1474

Abstract

Purpose

Turnaround maintenance (TAM) is a planned stoppage of production for conducting a comprehensive maintenance of equipment or plant with the purpose of improving plant availability and performance. The purpose of this paper is to investigate trends in the operation and management of TAM, as reported in the literature, and identify gaps, in the context of a system approach that views a plant as part of a network of a supply chain.

Design/methodology/approach

This literature review is based on over 80 subject-relevant papers and uses content analysis. The literature subjects are classified into several managerial areas that include organization, planning, scope and risk analysis, execution, performance measurement and learning. The gap in the literature is identified in light of the proposed system view for TAM.

Findings

The system view of TAM opens new opportunities for new research areas for improving the operation and management of TAM. These areas include optimizing TAM scheduling and developing methods for managing risks along the entire business supply chain. In addition, new approaches for collaboration, sharing knowledge, best practices and expertise within the supply chain become necessary for effective TAM planning and control.

Originality/value

This paper reviews the literature and provides a new classification of TAM. It adopts the system view for TAM that has brought new insights in the operation and management of TAM. New trends for research in the area of TAM are identified.

Details

Journal of Quality in Maintenance Engineering, vol. 25 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 17 April 2024

Zul-Atfi Ismail

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance

Abstract

Purpose

This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Maintenance planning and management are integral components of the construction sector, serving the broader purpose of post-construction activities and processes. However, as Precast Concrete (PC) construction projects increase in scale and complexity, the interconnections among these activities and processes become apparent, leading to planning and performance management challenges. These challenges specifically affect the monitoring of façade components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of maintenance planning for façades, along with the main features of information and communication technology tools and techniques using building information modeling technology, is grounded in the analysis of numerous literature reviews in PC building scenarios.

Findings

This research focuses on an integrated system designed to analyze information and support decision-making in maintenance planning for PC buildings. It is based on robust data collection regarding concrete façades' failures and causes. The system aims to provide appropriate planning decisions and minimize the risk of façade failures throughout the building's lifetime.

Originality/value

The study concludes that implementing a research framework to develop such a system can significantly enhance the effectiveness of maintenance planning for façade design, construction and maintenance operations.

Details

Facilities , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 31 March 2023

Zul-Atfi Ismail

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However…

Abstract

Purpose

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However, the performance competency and design knowledge of the practice's building control instrument process can be affected by its evaluation and the information management of building information modelling (BIM)–based model checking (BMC). These maintenance-planning problems have not yet been investigated in instances such as the Grenfell Tower fire (14 June 2017, approximately 80 fatalities) in North Kensington, West London.

Design/methodology/approach

This study proposes a theoretical framework for analysing the existing conceptualisation of BIM tools and techniques based on a critical review of GB maintenance environments. These are currently employed on GB maintenance ecosystems embedded in project teams that can affect BMC practices in the automation system process. In order to better understand how BMC is implemented in GB ecosystem projects, a quantitative case study is conducted in the Malaysian public works department (Jabatan Kerja Raya (JKR)).

Findings

GB ecosystem projects were not as effective as planned due to safety awareness, design planning, inadequate track insulation, environmental (in) compatibility and inadequate building access management. Descriptive statistics and an ANOVA were applied to analyse the data. The study is reinforced by a process flow, which is transformed into a theoretical framework.

Originality/value

Industry practitioners can use the developed framework to diagnose BMC application issues and leverage the staff competency inherent in an ecosystem to plan GB maintenance environments successfully.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 1 December 2020

Zul-Atfi Ismail

Most green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless…

Abstract

Purpose

Most green building (GB) materials, which are used widely in the construction sector in Malaysia, perform poorly in terms of energy efficiency and sustainability. Nevertheless, during maintenance planning of these materials, the focus is often directed towards comfort and design instead. However, as GB material construction projects grow in scale and complexity, interconnections between the activities and processes can be noticed during problematic planning performance management to monitor the GB material components for corrective and preventive maintenance actions.

Design/methodology/approach

The concept of GB material maintenance planning for sustainable development and the main features of information and communication technology tools and techniques are based on analysis of literature reviews of GB material scenarios.

Findings

The results show how decision-making support in maintenance planning can be unsuccessful and how planning decisions can frame the content of an integrated system to analyse information and reduce risks of GB material failure.

Originality/value

The paper concludes that implementing a research framework for developing such a system can help improve the sustainable performance of maintenance planning of GB material economic, social and environmental issues.

Details

Journal of Financial Management of Property and Construction , vol. 26 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 16 August 2011

Carles Sitompul and El‐Houssaine Aghezzaf

The purpose of this study is to propose and formulate an integrated hierarchical production, and maintenanceplanning model.

1335

Abstract

Purpose

The purpose of this study is to propose and formulate an integrated hierarchical production, and maintenanceplanning model.

Design/methodology/approach

The proposed model is formulated mathematically and tested for some hypothetical cases. A two‐level planning is proposed to address the hierarchical planning problem, i.e. aggregate planning and detailed planning. A preventive maintenance planning is integrated into the aggregate planning, while machine breakdowns, which require corrective maintenance actions, are investigated in the detailed planning. The proposed general preventive maintenance model is tested against cyclical preventive maintenance models for some cases, and for evaluating the performance of the models, in terms of costs, and service levels.

Findings

The proposed general preventive maintenance model gives a better solution in terms of cost than the cyclical maintenance model (i.e. 6 per cent less costly), if the maintenance planning is executed separately from the production planning. In terms of service level, however, both models perform equally well with average service levels equal to 97.6 per cent. The effect of tight capacity, long maintenance duration, and small machine parameters similarly tightens the capacity. In these cases, it is shown that a stable level of capacity is more beneficial to achieve a better service level, which is gained if the preventive maintenance actions are carried out monthly.

Practical implications

At the aggregate level, the proposed preventive maintenance model considers a non‐cyclical planning, which means that the preventive maintenance periods do not necessarily fall at equally distant times. The inventory movement constraints at the aggregate level decouple machines to operate independently; hence the detailed level problem can be solved separately for each machine. In a rolling horizon approach, only the first period of the aggregate plan is implemented and disaggregated into the production of items at the detailed level.

Originality/value

The paper proposes an integrated model of hierarchical production and maintenance planning. A general preventive maintenance is integrated into the aggregate planning, while machine breakdowns are investigated in the detailed planning. To the best of one's knowledge, such a hierarchical view of production planning and maintenance has not been addressed adequately.

Details

Journal of Quality in Maintenance Engineering, vol. 17 no. 3
Type: Research Article
ISSN: 1355-2511

Keywords