Article
Publication date: 1 June 2021

Okechukwu Bruno-Kizito Nwadigo, Nicola Naismith, Ali GhaffarianHoseini, Amirhosein GhaffarianHoseini and John Tookey

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to…

Abstract

Purpose

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.

Design/methodology/approach

The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.

Findings

The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.

Originality/value

This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.

Details

Smart and Sustainable Built Environment, vol. 11 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 July 2016

Hammad Abdullah Al Nasseri, Kristian Widen and Radhlinah Aulin

The implementation and control processes of project planning and scheduling involve a wide range of methods and tools. Despite the development and modification and integration of…

1964

Abstract

Purpose

The implementation and control processes of project planning and scheduling involve a wide range of methods and tools. Despite the development and modification and integration of the project management theory with newer scheduling approaches in particular, practitioners’ views on the efficiency and effectiveness of these methods and tools differ. This situation can be attributed in part to a lack of understanding of the most appropriate basis for implementing these methods and tools. This study, therefore, aims to overcome this deficiency by conceptualizing and adopting a taxonomy of planning and scheduling methods.

Design/methodology/approach

The study is based on a review and discourse analysis of the literature covering a large number of theoretical and empirical studies. The underlying theories of various planning and scheduling methods were analyzed with respect to the taxonomy criteria adopted in the study.

Findings

Using the taxonomy, the key characteristics of planning and scheduling methods considered in this study were identified and interpreted. These included concepts and theories; key features; suitability and usability; and benefits and limitations. Overall, the findings suggest that project managers should consider taxonomy as a support tool for selecting and prioritizing the most appropriate method or combination of methods for managing their projects. Recommendations include the need for more advanced or multi-dimensional taxonomies to cope with the diversity of project type and size.

Originality/value

The results of the study allow project managers to improve their current practices by utilizing taxonomy when considering the implementation of planning and scheduling methods. Moreover, taxonomy can be considered as a tool to promote learning on the part of those less experienced in planning and scheduling. Taxonomy can be considered as an initial platform for further research in this area.

Details

Journal of Engineering, Design and Technology, vol. 14 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 July 2019

Gaurav Kumar Badhotiya, Gunjan Soni and M.L. Mittal

This paper aims to deal with integrated planning and scheduling problem in multi-site manufacturing environment and provides a comprehensive review of literature. Classification…

Abstract

Purpose

This paper aims to deal with integrated planning and scheduling problem in multi-site manufacturing environment and provides a comprehensive review of literature. Classification schemes and various aspects of planning and scheduling problem in multi-site manufacturing are highlighted.

Design/methodology/approach

A structured review methodology is adopted to classify the relevant literature. Taxonomy for classification of the problem is presented, followed by review of modelling approaches, solution strategies and challenges faced in multi-site integrated planning and scheduling problem.

Findings

The paper is concluded with interesting research findings and a short view on directions related to modelling approach, solution strategy and technique for further developments in the area of multi-site integrated planning and scheduling.

Research limitations/implications

The findings of this study would be helpful for future researchers and practitioners to provide a knowledge base and to further work in this area.

Originality/value

This study attempts to consolidate the diverse literature available and highlight the various aspects of planning and scheduling in multi-site manufacturing.

Details

Journal of Global Operations and Strategic Sourcing, vol. 13 no. 1
Type: Research Article
ISSN: 2398-5364

Keywords

Article
Publication date: 19 October 2012

Premaratne Samaranayake and Senevi Kiridena

The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single…

3765

Abstract

Purpose

The purpose of this paper is to examine how certain limitations of the current approaches to planning and scheduling of aircraft heavy maintenance can be addressed using a single integrated framework supported by unified data structures.

Design/methodology/approach

The “unitary structuring technique”, originally developed within the context of manufacturing planning and control, is further enhanced for aircraft heavy maintenance applications, taking into account the uncertainty associated with condition‐based maintenance. The proposed framework delivers the advanced functionalities required for simultaneous and dynamic forward planning of maintenance operations, as well as finite loading of resources, towards optimising the overall maintenance performance.

Findings

Execution of maintenance operations under uncertainty involves materials changes, rectification and re‐assembly. It is shown that re‐scheduling of materials (spare‐parts), resources and operations can be taken care of by simultaneous and dynamic forward planning of materials and operations with finite loading of resources, using the integrated framework.

Research limitations/implications

As part of adopting the proposed framework in practice, it needs to be guided by an overall methodology appropriate for application‐specific contexts.

Practical implications

The potential direct benefits of adopting the proposed framework include on‐time project completion, reduced inventory levels of spare‐parts and reduced overtime costs.

Originality/value

Existing approaches to aircraft maintenance planning and scheduling are limited in their capacity to deal with contingencies arising out of inspections carried out during the execution phase of large maintenance projects. The proposed integrated approach is, capable of handling uncertainty associated with condition‐based maintenance, due to the added functionalities referred to above.

Details

Journal of Quality in Maintenance Engineering, vol. 18 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 1 February 1995

David Little, John Kenworthy, Peter Jarvis and Keith Porter

Work undertaken in collaboration with BPICS, Cincom (UK) Ltd andICI Engineering supported by funding from the EPSRC (CDP). The projectreviewed planning and scheduling procedures…

1792

Abstract

Work undertaken in collaboration with BPICS, Cincom (UK) Ltd and ICI Engineering supported by funding from the EPSRC (CDP). The project reviewed planning and scheduling procedures in over 30 industrial companies over a two‐year period to establish best practice in shop‐floor scheduling and to identify the key factors for scheduling success. Outlines the research approach briefly to provide a framework for the analysis of scheduling performance by industrial sector and by scheduling tool. This includes a powerful method for the performance measurement of supply‐chain management systems which allows the comparison of effectiveness in different operating environments and when using a variety of scheduling approaches. Important elements of the project were the review and comparison of scheduling performance in conventional MRPII environments (usually a manual activity based on expediting or the use of shop floor control) with that of more recent finite capacity‐based tools and a classification of scheduling approaches. Some clear lessons have been learned. Concludes by presenting these along with an outline of the success factors which underpin effective scheduling performance in the range of best practice companies identified.

Article
Publication date: 4 December 2023

Ahmed M. Attia, Ahmad O. Alatwi, Ahmad Al Hanbali and Omar G. Alsawafy

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Abstract

Purpose

This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.

Design/methodology/approach

A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.

Findings

It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.

Research limitations/implications

The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.

Practical implications

Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.

Originality/value

This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.

Details

Journal of Quality in Maintenance Engineering, vol. 30 no. 1
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 13 October 2021

Syed Asif Raza and Abdul Hameed

The findings of this study have lightened the focal research areas in maintenance planning and scheduling. These also served as effective guidelines for future studies in this…

Abstract

Purpose

The findings of this study have lightened the focal research areas in maintenance planning and scheduling. These also served as effective guidelines for future studies in this area. This research, therefore, contributes in fulfilling the gap by carrying out an SLR of contemporary research studies in the area of models for maintenance planning and scheduling. At present, SLR rooted in BA has not been carried focusing on a survey over models for maintenance planning and scheduling. SLR uses advanced scientific methodologies from BA tools to unveil thematic structures.

Design/methodology/approach

We have systematically reviewed over 1,021 peer-reviewed journal articles. Advanced contemporary tools from Bibliometric Analysis (BA) are used to perform a Systematic Literature Review (SLR). First, exploratory analysis is presented, highlighting the influential authors, sources and region amongst other key indices. Second, the large bibliographical data is visualized using co-citation network analyses, and research clusters (themes) are identified. The co-citation network is extended into a dynamic co-citation network and unveils the evolution of the research clusters. Last, cluster-based content analysis and historiographical analysis is carried out to predict the prospect of future research studies.

Findings

BA tools first outlined an exploratory analysis that noted influential authors, production countries, top-cited papers and frequent keywords. Later, the bibliometric data of over 1,021 documents is visualized using co-citation network analyses. Later, a dynamic co-citation analysis identified the evolution of research clusters over time. A historiographical direct citation analysis also unveils potential research directions. We have clearly observed that there are two main streams of maintenance planning and scheduling applications. The first has focused on joint maintenance and operations on machines. The second focused on integrated production and maintenance models in an echelon setting for unrealizable production facilities.

Originality/value

There are many literature review-based research studies that have contributed to maintenance scheduling research surveys. However, most studies have adopted traditional approaches, which often fall short in handling large bibliometric data and therefore suffer from selection biases from the authors. As a result, in this area, the existing reviews could be non-comprehensive. This study bridges the research gap by conducting an SLR of maintenance models, which to the best of our knowledge, has not been carried out before this study.

Details

Journal of Quality in Maintenance Engineering, vol. 28 no. 4
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 1 March 1993

Melissa R. Bowers and Anurag Agarwal

Describes a model of a hierarchical planning system to provide a comprehensive approach to the complex production planning and scheduling problem. The model supplies a link…

Abstract

Describes a model of a hierarchical planning system to provide a comprehensive approach to the complex production planning and scheduling problem. The model supplies a link between long‐term and short‐term planning; the three tiers of the hierarchy implement: long‐term inventory planning on a cost minimization basis; shorter‐term production planning; and daily sequencing. Emphasizes efficient processing and transmission of information.

Details

International Journal of Clothing Science and Technology, vol. 5 no. 3/4
Type: Research Article
ISSN: 0955-6222

Keywords

Article
Publication date: 1 July 1987

John R. Dougherty and Christopher Gray

Effective planning and scheduling systems improve performance in every area of a company. Interfunctional communication and understanding must improve planning that involves joint…

Abstract

Effective planning and scheduling systems improve performance in every area of a company. Interfunctional communication and understanding must improve planning that involves joint plans, and schedules must be instituted. Sales and marketing are crucial to this process since they are the starting point with their forecasts and customer order demands. Sales and marketing's active participation in planning and scheduling creates a raised performance and a consensus‐based, trusting working relationship with all other functions.

Details

Industrial Management & Data Systems, vol. 87 no. 7/8
Type: Research Article
ISSN: 0263-5577

Keywords

Article
Publication date: 10 July 2017

Abdelrahman E.E. Eltoukhy, Felix T.S. Chan and S.H. Chung

The purpose of this paper is twofold: first to carry out a comprehensive literature review for state of the art regarding airline schedule planning and second to identify some new…

2740

Abstract

Purpose

The purpose of this paper is twofold: first to carry out a comprehensive literature review for state of the art regarding airline schedule planning and second to identify some new research directions that might help academic researchers and practitioners.

Design/methodology/approach

The authors mainly focus on the research work appeared in the last three decades. The search process was conducted in database searches using four keywords: “Flight scheduling,” “Fleet assignment,” “Aircraft maintenance routing” (AMR), and “Crew scheduling”. Moreover, the combination of the keywords was used to find the integrated models. Any duplications due to database variety and the articles that were written in non-English language were discarded.

Findings

The authors studied 106 research papers and categorized them into five categories. In addition, according to the model features, subcategories were further identified. Moreover, after discussing up-to-date research work, the authors suggested some future directions in order to contribute to the existing literature.

Research limitations/implications

The presented categories and subcategories were based on the model characteristics rather than the model formulation and solution methodology that are commonly used in the literature. One advantage of this classification is that it might help scholars to deeply understand the main variation between the models. On the other hand, identifying future research opportunities should help academic researchers and practitioners to develop new models and improve the performance of the existing models.

Practical implications

This study proposed some considerations in order to enhance the efficiency of the schedule planning process practically, for example, using the dynamic Stackelberg game strategy for market competition in flight scheduling, considering re-fleeting mechanism under heterogeneous fleet for fleet assignment, and considering the stochastic departure and arrival times for AMR.

Originality/value

In the literature, all the review papers focused only on one category of the five categories. Then, this category was classified according to the model formulation and solution methodology. However, in this work, the authors attempted to propose a comprehensive review for all categories for the first time and develop new classifications for each category. The proposed classifications are hence novel and significant.

Details

Industrial Management & Data Systems, vol. 117 no. 6
Type: Research Article
ISSN: 0263-5577

Keywords