Search results

1 – 10 of 505
Article
Publication date: 2 March 2022

Zul-Atfi Bin Ismail

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research…

Abstract

Purpose

This paper aims to identify the different system approach using building information modelling (BIM) technology that is equipped with automated evaluation processes. BIM research has mainly focused on theoretical models of acceptance in the green building (GB) maintenance industry. However, BIM has the potential to the competency’s performance and design knowledge of building control instrument. Realising this potential requires a study of BIM at the maintenance planning level, which is considered to be BIM-based model checking (BMC). BMC and its effect in the maintenance planning have not been sufficiently investigated.

Design/methodology/approach

The aim of this paper is to present a critical review of literature on the theoretical background of BMC practices and the main features of information and communication technology tools and techniques in the GB maintenance projects.

Findings

A theoretical framework of BMC is developed and presented. The proposed model incorporates requirement for maintaining a competency’s performance on maintenance planning schemes of GB projects and the importance of early integration of BMC in the design phase to identify alternative methods to cogenerate, monitor and optimise BMC.

Originality/value

It is found that variables facilitating BMC are integrated at different GB maintenance environments levels and are shaped by the context. Directions for future research are presented.

Details

Construction Innovation , vol. 23 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 4 August 2022

Zul-Atfi Ismail

The green building (GB) maintenance industry has been under increasing pressure by designers to demonstrate its evaluation and information management of building information…

Abstract

Purpose

The green building (GB) maintenance industry has been under increasing pressure by designers to demonstrate its evaluation and information management of building information modelling based model checking (BMC) to the competency's performance and design knowledge of building control instrument. This main problem has been termed as maintenance planning level. Although maintenance planning has been explored in GB maintenance environments, less is known about what maintenance planning problems currently exist and what their causes are, such as the recent fire in the Grenfell Tower (14 June 2017, about 80 fatalities) in North Kensington, West London. The aim of this paper is to identify how GB maintenance environments could integrate BMC within their processes. The purpose of this study is to assess the BMC technology management of GB maintenance ecosystem and that of a soft skills level to establish the impact of innovation policy features on database and safety risk function mechanism.

Design/methodology/approach

To achieve this aim, a comprehensive literature review of the existing conceptualisation of BMC practices is reviewed and the main features of Information and Communication Technology tools and techniques currently being employed on such GB maintenance ecosystem is carried out to evaluate the strengths and weaknesses of the previous studies. The conceptual framework explores the importance of integration of BMC in the construction phase to identify alternative methods in the automation system (AS) process to co-generate, monitor and optimise BMC.

Findings

The results confirm that BMC tool positively influences database application and risk mechanism of construction project safety while agreeableness negatively does. Besides, database application has a negative influence on innovation policy of company towards BMC implementation. Propositions derived not only shed light on guidance for future research on the soft skills of construction organisations, but also provide decision-making support through a better understanding of the factors affecting soft skills level amongst biggest construction companies.

Originality/value

Thus far, this study advances the knowledge about how GB maintenance environments can ensure BMC delivery. This paper highlights the need for further research to integrate BMC in GB maintenance environments validates the framework across the construction phase with different GB project managers and engineers.

Details

Open House International, vol. 47 no. 3
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 31 March 2023

Zul-Atfi Ismail

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However…

Abstract

Purpose

Green building (GB) maintenance is increasingly accepted in the construction industry, so it can now be interpreted as an industry best practice for maintenance planning. However, the performance competency and design knowledge of the practice's building control instrument process can be affected by its evaluation and the information management of building information modelling (BIM)–based model checking (BMC). These maintenance-planning problems have not yet been investigated in instances such as the Grenfell Tower fire (14 June 2017, approximately 80 fatalities) in North Kensington, West London.

Design/methodology/approach

This study proposes a theoretical framework for analysing the existing conceptualisation of BIM tools and techniques based on a critical review of GB maintenance environments. These are currently employed on GB maintenance ecosystems embedded in project teams that can affect BMC practices in the automation system process. In order to better understand how BMC is implemented in GB ecosystem projects, a quantitative case study is conducted in the Malaysian public works department (Jabatan Kerja Raya (JKR)).

Findings

GB ecosystem projects were not as effective as planned due to safety awareness, design planning, inadequate track insulation, environmental (in) compatibility and inadequate building access management. Descriptive statistics and an ANOVA were applied to analyse the data. The study is reinforced by a process flow, which is transformed into a theoretical framework.

Originality/value

Industry practitioners can use the developed framework to diagnose BMC application issues and leverage the staff competency inherent in an ecosystem to plan GB maintenance environments successfully.

Details

Journal of Enterprise Information Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0398

Keywords

Article
Publication date: 29 March 2024

Sihao Li, Jiali Wang and Zhao Xu

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information…

Abstract

Purpose

The compliance checking of Building Information Modeling (BIM) models is crucial throughout the lifecycle of construction. The increasing amount and complexity of information carried by BIM models have made compliance checking more challenging, and manual methods are prone to errors. Therefore, this study aims to propose an integrative conceptual framework for automated compliance checking of BIM models, allowing for the identification of errors within BIM models.

Design/methodology/approach

This study first analyzed the typical building standards in the field of architecture and fire protection, and then the ontology of these elements is developed. Based on this, a building standard corpus is built, and deep learning models are trained to automatically label the building standard texts. The Neo4j is utilized for knowledge graph construction and storage, and a data extraction method based on the Dynamo is designed to obtain checking data files. After that, a matching algorithm is devised to express the logical rules of knowledge graph triples, resulting in automated compliance checking for BIM models.

Findings

Case validation results showed that this theoretical framework can achieve the automatic construction of domain knowledge graphs and automatic checking of BIM model compliance. Compared with traditional methods, this method has a higher degree of automation and portability.

Originality/value

This study introduces knowledge graphs and natural language processing technology into the field of BIM model checking and completes the automated process of constructing domain knowledge graphs and checking BIM model data. The validation of its functionality and usability through two case studies on a self-developed BIM checking platform.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 July 2021

Narges Eskandari and Esmatullah Noorzai

Commercial building facility systems are costly, and due to the complexity of operation and maintenance (O&M), some failures can cause irreversible expensive damage. Currently…

Abstract

Purpose

Commercial building facility systems are costly, and due to the complexity of operation and maintenance (O&M), some failures can cause irreversible expensive damage. Currently, few capabilities of building information modeling (BIM) have been used in the facility maintenance operation. The purpose of this paper is to use a tool for making it easier to predict preventable defects in commercial building facility systems by examining a complete BIM.

Design/methodology/approach

To this end, a list of frequent defects in the facility system was achieved by a review of commercial building literature. Then, by examining a complete BIM model, the available methods and tools for O&M facilities during the operation period are identified and analyzed.

Findings

The results of the paper show that the solution presented based on total productive maintenance (TPM) subsets can effectively prevent facility system defects during the operation and maintenance period. An expert team assesses the validation of results.

Originality/value

The findings can help facility managers to adopt measures using TPM methods to prevent defects through an integrated BIM platform. The examination is based on case studies, surveys, expert experience and a thorough literature review.

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 6 September 2021

Duy-Cuong Nguyen, The-Quan Nguyen, Ruoyu Jin, Chi-Ho Jeon and Chang-Su Shim

The purpose of this study is to develop a building information modelling (BIM)-based mixed reality (MR) application to enhance and facilitate the process of managing bridge…

1475

Abstract

Purpose

The purpose of this study is to develop a building information modelling (BIM)-based mixed reality (MR) application to enhance and facilitate the process of managing bridge inspection and maintenance works remotely from office. It aims to address the ineffective decision-making process on maintenance tasks from the conventional method which relies on documents and 2D drawings on visual inspection. This study targets two key issues: creating a BIM-based model for bridge inspection and maintenance; and developing this model in a MR platform based on Microsoft Hololens.

Design/methodology/approach

Literature review is conducted to determine the limitation of MR technology in the construction industry and identify the gaps of integration of BIM and MR for bridge inspection works. A new framework for a greater adoption of integrated BIM and Hololens is proposed. It consists of a bridge information model for inspection and a newly-developed Hololens application named “HoloBridge”. This application contains the functional modules that allow users to check and update the progress of inspection and maintenance. The application has been implemented for an existing bridge in South Korea as the case study.

Findings

The results from pilot implementation show that the inspection information management can be enhanced because the inspection database can be systematically captured, stored and managed through BIM-based models. The inspection information in MR environment has been improved in interpretation, visualization and visual interpretation of 3D models because of intuitively interactive in real-time simulation.

Originality/value

The proposed framework through “HoloBridge” application explores the potential of integrating BIM and MR technology by using Hololens. It provides new possibilities for remote inspection of bridge conditions.

Article
Publication date: 1 December 2020

Abdulwahed Fazeli, Mohammad Saleh Dashti, Farzad Jalaei and Mostafa Khanzadi

Analyzing different scenarios at the design stage of construction projects has always been a challenging task. One of the main parameters that helps owners in making better…

2457

Abstract

Purpose

Analyzing different scenarios at the design stage of construction projects has always been a challenging task. One of the main parameters that helps owners in making better decisions in designing their buildings is to look after the cost perspective on different design scenarios. Thus, this study aims to propose a semi-automated BIM-based cost estimation approach that enables practitioners to estimate the cost of projects based on different design scenarios by an accurate and agile system.

Design/methodology/approach

This study proposes an integrated framework, through which the cost estimation standard of Iran (FehrestBaha) is linked to the materials quantity take-offs (QTO) from BIM models. The performance of the system is based on connecting the classification standards of UniFormat and MasterFormat to the cost estimation standard of FehrestBaha. A BIM-based extension in the Revit environment is developed to automate the cost estimation process.

Findings

To evaluate the efficiency of the proposed approach in cost estimation, it is implemented to estimate the cost of the architectural discipline in a real construction project. The results indicate that the proposed BIM-based approach estimated the cost of the architectural discipline with an acceptable level of accuracy.

Practical implications

The proposed approach could be used by practitioners to have an agile and accurate BIM-based cost estimation of different scenarios during design process. The semi-automated system considerably reduces the time of cost estimation in comparison to the traditional manual approaches, particularly in complex structures. Owners are able to easily trace changes in project cost according to any changes in components and materials of the BIM model. Furthermore, the proposed approach provides a practical roadmap for BIM-based cost estimation based on cost estimation standards in different countries.

Originality/value

Unlike the traditional manual cost estimation approaches, the proposed BIM-based approach is not highly dependent on the knowledge of experienced estimators, which therefore facilitates its implementation. Furthermore, automating both QTO process and the required calculations in this approach increases the accuracy of cost estimation while decreasing the probability of human errors or omission occurrence.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Content available

Abstract

Details

Open House International, vol. 47 no. 3
Type: Research Article
ISSN: 0168-2601

Article
Publication date: 1 September 2021

Hyun Jeong Koo and James T. O’Connor

In recent decades, professionals in the architecture, engineering and construction industry have come to recognize building information modeling (BIM) as one of the most powerful…

Abstract

Purpose

In recent decades, professionals in the architecture, engineering and construction industry have come to recognize building information modeling (BIM) as one of the most powerful technologies available to ensure successful project outcomes. The purpose of this paper is to explore the benefits of BIM on design defect prevention during the design phase of building projects.

Design/methodology/approach

The authors qualitatively analyzed 160 design defect leading indicators (LIs) to identify key themes for design defect prevention. Then, by matching appropriate BIM functionalities to each key LI theme, they identified BIM-supported key LI themes.

Findings

The result of this paper served as the foundation of a BIM-based key design processes framework, which identifies the necessary data, project parties, actions and applicable BIM functions for preventing particular design defects. In addition, the authors found that BIM implementation can benefit 71.2% of the LIs of the design defects associated with problematic deliverables.

Originality/value

This study establishes the current state of BIM use for design defect prevention and also gives practitioners precisely targeted guidelines for using BIM functions during the design phase for better quality management.

Details

Construction Innovation , vol. 22 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 505