Search results

1 – 10 of 212
Article
Publication date: 15 June 2023

Amna Salman and Wasiq Ahmad

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only…

Abstract

Purpose

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only 5–10%. Therefore, enhancing and optimizing the O&M of a facility is a crucial issue. In addition, with the increasing complexities in a building's operating systems, more technologically advanced solutions are required for proactively maintaining a facility. Thereby, a tool is needed which can optimize and reduce the cost of facility maintenance. One of the solutions is Augmented or Mixed Reality (AR/MR) technologies which can reduce repair time, training time and streamline inspections. Therefore, the purpose of this study is to establish contextual knowledge of AR/MR application in facilities operation and maintenance and present an implementation framework through the analysis and classification of articles published between 2015 and 2022.

Design/methodology/approach

To effectively understand all AR/MR applications in facilities management (FM), a systematic literature review is performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) protocol was followed for searching and describing the search strategies. Keywords were identified through the concept mapping technique. The Scopus database and Google Scholar were employed to find relevant articles, books and conference papers. A thorough bibliometric analysis was conducted using VOS Viewer and subsequently, a thematic analysis was performed for the selected publications.

Findings

The use of AR/MR within facilities O&M could be categorized into five different application areas: (1) visualization; (2) maintenance; (3) indoor localization and positioning; (4) information management and (5) indoor environment. After a thematic analysis of the literature, it was found that maintenance and indoor localization were the most frequently used research application domains. The chronological evolution of AR/MR in FM is also presented along with the origin of publications, which showed that the technology is out of its infancy stage and is ready for implementation. However, literature showed many challenges hindering this goal, that is (1) reluctance of the organizational leadership to bear the cost of hardware and trainings for the employees, (2) Lack of BIM use in FM and (3) system lagging, crashing and unable to register the real environment. A preliminary framework is presented to overcome these challenges.

Originality/value

This study accommodates a variety of application domains within facilities O&M. The publications were systematically selected from the existing literature and then reviewed to exhibit various AR/MR applications to support FM. There have been no literature reviews that focus on AR and/or MR in the FM and this paper fills the gap by not only presenting its applications but also developing an implementation framework.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 25 April 2023

Benjamin Jowett, David John Edwards and Mohamad Kassem

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT…

Abstract

Purpose

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT features and the construction management functions on sites.

Design/methodology/approach

A positivist approach with elements of interpretivism is adopted to allow to capture what is perceived as “reality” in relation to individuals’ interpretation and experience in the use and implementation of MBT. This is achieved by using a mixed qualitative-quantitative approach that can capture the various understandings of MBT. The research methods included a longitudinal case study over 12 months, two project workshops, expert interviews and an industry survey that together helped to investigate MBT at project, enterprise and industry levels.

Findings

The MBT requirements taxonomy included requirements relating to both project and organisation. Project requirements addressed MBT functionalities for sites and information management, while organisation requirements focused on the integration of MBT solutions with the enterprise from information technology, legal and security perspectives. A detailed matrix showing the interactions between five key MBT features and seven construction management functions was also developed.

Research limitations/implications

The two constructs developed by this study can help researchers to structure their investigation of key uses of MBT applications and their benefits. It can be used by researchers aiming to investigate integrated approaches to the digitalisation of construction sites, such as those enabled by Digital Twins. The interaction matrix can aid researchers in evaluating the intersections between the MBT functionalities and the site construction management functions (e.g. theoretical analysis of interactions from Lean Construction, benefit evaluation perspective). More broadly, the two constructs can support research and practice investigating the development of data-driven approaches on construction sites.

Practical implications

The developed MBT taxonomy can guide construction organisations in selecting suitable MBT for Field BIM for their projects. It can also act as a baseline against which varying MBT solutions can be compared.

Originality/value

Constructs such as taxonomies for MBTs; an understanding of MBT capabilities and use within the industry; and a lack of delineation between related terms, such as Mobile BIM, Field BIM, Site BIM, Cloud BIM and Mobile Apps, were lacking in the literature. This study contributed to addressing this gap.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 4 October 2022

Ali Rashidi, Wei Yin Yong, Duncan Maxwell and Yihai Fang

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how…

Abstract

Purpose

The construction industry has actively attempted to tackle the low-productivity issues arising from inefficient construction planning. It is imperative to understand how construction practitioners perceive technology integration in construction planning in light of emerging technologies. This study intended to uncover unique experimental findings by integrating 4D-building information modelling (BIM) to virtual reality (VR) technology during construction planning among construction professionals at light steel framing (LSF) projects.

Design/methodology/approach

The building industry participants were invited to provide inputs on two different construction planning methods: conventional and innovative methods. The conventional method involved the participants using traditional platforms such as 2D computer-aided design (CAD) and physical visualisation of paper-based construction drawings for the LSF assembly process with a Gantt Chart tool to complete construction planning-related tasks for the targeted project. Comparatively, participants are required to perform the same tasks using more innovative platforms like 4D-BIM in a VR environment.

Findings

A Charrette Test Method was used to validate the findings, highlighting an improvement in usability (+10.3%), accuracy (+89.1%) and speed (+30%) using 4D BIM with VR compared to the conventional paper-based method. The findings are also validated by a paired t-test, which is supported by the rationality of the same findings. This study posits positive results for construction planning through the utilisation of modern practices and technologies. These findings are significant for the global construction industry facing low productivity issues, delays and certainty in terms of building delivery timelines due to poor construction planning.

Originality/value

This new blend of technologies—combining 4D BIM and VR in industrialised construction projects—potentially directs future initiatives to drive the efficiency of construction planning in the building lifecycle. The interactive BIM-based virtual environment would purposefully transform construction planning practices in order to deliver modern and more certain building construction methods with a focus on prefabrication processes.

Article
Publication date: 30 April 2021

Vishak Dudhee and Vladimir Vukovic

The possibility of integrating building information in an augmented reality (AR) environment provides an effective solution to all phases of a building's lifecycle. This paper…

Abstract

Purpose

The possibility of integrating building information in an augmented reality (AR) environment provides an effective solution to all phases of a building's lifecycle. This paper explores the integration of building information modelling (BIM) and AR to effectively visualise building information models in an AR environment and evaluates the currently available AR tools.

Design/methodology/approach

A BIM model of a selected office room was created and superimposed to the actual physical space using two different AR devices and four different AR applications. The superimposing techniques, accuracy and the level of information that can be visualised were then investigated by performing a walk-through analysis.

Findings

From the investigation, it can be concluded that model positioning can be inaccurate depending on the superimposing method used and the AR device. Moreover, using the currently available techniques, only static building information can be superimposed and visualised in AR, showing a need to integrate data from Internet of Things (IoT) sensors into the current BIM-AR processes to allow visualisation of accurate and high-quality operational building information.

Originality/value

A practical process and method for visualising and superimposing BIM models in an AR environment have been described. Recommendations to improve superimposing accuracy are provided. The assessment of type, quality and level of detail that can be visualised indicates the areas that need improvement to increase the effectiveness of building information's visualisation in AR.

Details

Smart and Sustainable Built Environment, vol. 12 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 14 September 2023

Jiyang Yu, Hua Zhong and Marzia Bolpagni

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering…

Abstract

Purpose

The purpose of this paper is to analyse the current state of research on the integration of blockchain and building information modelling (BIM) in the Architecture, Engineering, Construction and Operations (AECO) industry as a means of identifying gaps between the existing paradigm and practical applications for determining future research directions and improving the industry. The study aims to provide clear guidance on areas that need attention for further research and funding and to draw academic attention to factors beyond the technical dimension.

Design/methodology/approach

A mixed-method systematic review is used, considering multiple literature types and using a sociotechnical perspective-based framework that covers three dimensions (technic, process and context) and three research elements (why, what and how). Data are retrieved and analysed from the Web of Science and Scopus databases for the 2017–2023 period.

Findings

While blockchain has the potential to address security, traceability and transparency and complement the system by integrating supporting applications, significant gaps still exist between these potentials and widespread industry adoption. Current limitations and further research needs are identified, including designing fully integrated prototypes, empirical research to identify operational processes, testing and analysing operational-level models or applications and developing and applying a technology acceptance model for the integration paradigm. Previous research lacks contextual settings, real-world tests or empirical investigations and is primarily conceptual.

Originality/value

This paper provides a comprehensive, critical systematic review of the integration of blockchain with BIM in the construction industry, using a sociotechnical perspective-based framework which can be applied in future reviews. The study provides insight into the current state and future opportunities for policymakers and practitioners in the AECO industry to prepare for the transition in this disruptive paradigm. It also provides a phased plan along with a clear direction for the transition to more advanced applications.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 March 2022

Sanjay Bhattacharya and Ankur Mathur

The construction industry worldwide is looking for overall efficiency in the entire project life cycle. Lean construction and Building Information Modeling (BIM) are together, key…

Abstract

Purpose

The construction industry worldwide is looking for overall efficiency in the entire project life cycle. Lean construction and Building Information Modeling (BIM) are together, key constituents in this quest. This study looks to reinforce the contribution of BIM to deliver applied lean principles to enhance productivity and performance.

Design/methodology/approach

The study adopts mixed methodologies of Ethnographic Action Research (EAR) and crisp set Qualitative Comparative Analysis (csQCA). The mosaic of case studies provides a descriptive and instrumental approach. While a descriptive approach investigates the interventions and phenomenon relating BIM to Lean, an instrumental approach constitutes exemplars of the interrelated phenomenon of BIM and Lean.

Findings

The themes of Elimination of Waste, Kaizen, Respecting the Human Elements, Poke-a-Yoke and Jidoka are contributed to the maximum by BIM. All the case studies discussed evidence of the contribution to Lean, as they enhance end-customer value.

Research limitations/implications

The contribution of BIM towards Lean could encourage collaborations amongst stakeholders for mutual benefits. BIM could enhance decision making, predictive simulation, risk analysis, etc. with many other exciting possibilities of delivering productivity and performance. The study is limited by the insights offered by the individual cases.

Originality/value

The study provides insights into potential developments and research. It is expected to encourage reflective professional practice triggered by innovative thinking for the gainful utilization of BIM to deliver Lean.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 7
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 26 April 2022

Abhinesh Prabhakaran, Abdul-Majeed Mahamadu, Lamine Mahdjoubi, Colin Booth and Clinton Aigbavboa

The Furniture, Fixture and Equipment (FFE) sector is well placed to leverage virtual reality (VR) technology for competitive and operational advantages; however, the diffusion of…

Abstract

Purpose

The Furniture, Fixture and Equipment (FFE) sector is well placed to leverage virtual reality (VR) technology for competitive and operational advantages; however, the diffusion of VR applications in this sector has followed a steep curve. This study reports on the implementation of two novel VR applications in the FFE sector and also investigates the challenges and benefits associated with their use and adaptability.

Design/methodology/approach

A sequential exploratory mixed research methodology consisting of three phases was adopted for this study. This included identification of factors that affect/facilitate the implementation of VR (Challenges and Benefits) using experiments during in-house prototyping of VR applications, a rigorous literature review and questionnaire survey to solicit FFE Stakeholder's (n = 117) opinion on the utility and usefulness of the proposed applications and to the understand factors that facilitate and inhibit their implementation in FFE's context, particularly as a design communication and coordination tool.

Findings

The findings of this study revealed that distributed and single-user VR has become essential to digitalising the FFE sector's design communication with improved design communication being regarded as the most important benefit of its use. Conversely, the most critical challenge that inhibits the implementation of these two VR applications in the FFE sector is the perceived cost.

Originality/value

This study provides valuable insight to FFE's stakeholders to devise action plans to mitigate myriad complex and interrelated factors that affect the adoption of virtual reality technology in the FFE sector that are otherwise very hard to understand, and the consequential implementation of any mitigation plans cannot be devised.

Details

Smart and Sustainable Built Environment, vol. 12 no. 4
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 30 March 2022

Oluseye Olugboyega, Godwin Ehis Oseghale and Clinton Aigbavboa

This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different…

Abstract

Purpose

This study aims to undertake a contextual analysis of project-level building information modelling (BIM) adoption in Nigeria and demonstrate how BIM is applied across different projects in Nigeria.

Design/methodology/approach

This research generates contextual and holistic understandings of multiple project-level cases of BIM adoption through an interpretive paradigm guided by relativist ontology and subjectivist epistemology. Two models of project-level BIM adoption (ten-factor theory of BIM adoption and strategic-contingent model of BIM adoption) were merged to formulate the BIM adoption assessment scale (BIM-AAS). A qualitative-oriented case study protocol was developed to extract valid and reliable data from external and internal project data based on BIM-AAS features. The extracted data were analysed using the pattern-matching technique and cross-case analysis.

Findings

The results indicate that there was substantial use of BIM tools and technologies in the projects. All the projects adopted collaborative procurement and team and developed integrated building information models. The use of BIM tools, technologies and processes in the projects was found to be above average. The complexities and expectations levels of the projects compliment the nature of BIM adoption in the projects.

Research limitations/implications

The BIM-AAS adopted in this research is an excellent example of a project-level BIM adoption analytical tool. It can be assumed in future research. Also, this research contributes to the theory that the level of project complexity and expectations must align with the level of BIM adoption in projects. The study’s findings ratify BIM tools, technologies and processes as the elements of project-level BIM adoption.

Practical implications

This research substantiates the actual nature and structure of BIM adoption in Nigeria, thereby simplifying the development of initiatives towards BIM adoption in projects and determining the appropriate strategies for BIM implementation and innovation in the Nigerian construction industry. The most important initiative that the Nigerian government can make to drive BIM implementation is the automating of code checking for building rules and regulations in Nigeria.

Originality/value

Previous studies have only reported cases of project-level BIM adoption using surveys and without a standardised project-level BIM adoption model to guide the analysis. This study is the first to formulate and use BIM adoption models for a uniform, critical and contextual analysis of project-level BIM adoption.

Article
Publication date: 25 October 2022

Yi Tan, Wenyu Xu, Keyu Chen, Chunyan Deng and Peng Wang

At present, teaching methods based on 2D drawings are still commonly used for educating students on the location of steel reinforcement bars in concrete. However, traditional…

Abstract

Purpose

At present, teaching methods based on 2D drawings are still commonly used for educating students on the location of steel reinforcement bars in concrete. However, traditional teaching methods have limitations as students can find it difficult to understand 2D drawings. This study aims to develop an interactive and collaborative augmented reality environment (ICARE) using augmented reality (AR) technology to improve students' engagement in learning.

Design/methodology/approach

This study develops an ICARE prototype, which is organized into two stages: (1) The augmented teaching environment comprising of models and interactive components; (2) The AR collaborative application which uses Photon Unity Networking (PUN) plugin and Azure spatial anchors cloud service. The AR-based teaching environment runs with Universal Windows Platform (UWP) to enable development in the HoloLens 2 through Microsoft Visual Studio.

Findings

An experimental study was conducted, where 60 students were divided into three groups employing Drawings-based, building information modeling (BIM)-based and AR-based methods for teaching. After the test, the three groups of students were requested to complete a questionnaire. According to the analysis of the experimental results, the ICARE can improve students' comprehension, memory of learned materials and their ability to read and understand steel reinforcement drawings improving the quality of teaching, especially interactivity and engagement.

Originality/value

As illustrated in the experiments, the developed ICARE has outstanding performance over conventional approaches in civil engineering courses that can improve students' comprehension and memory of knowledge and their ability to read and understand steel bar drawings. This study provides empirical evidence that AR is a promising technology that can be integrated with traditional classroom instruction and can improve students' comprehension and memory of knowledge and their ability to read and understand steel bar drawings.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 212