Search results

1 – 10 of 671
Article
Publication date: 6 September 2021

Duy-Cuong Nguyen, The-Quan Nguyen, Ruoyu Jin, Chi-Ho Jeon and Chang-Su Shim

The purpose of this study is to develop a building information modelling (BIM)-based mixed reality (MR) application to enhance and facilitate the process of managing bridge…

1480

Abstract

Purpose

The purpose of this study is to develop a building information modelling (BIM)-based mixed reality (MR) application to enhance and facilitate the process of managing bridge inspection and maintenance works remotely from office. It aims to address the ineffective decision-making process on maintenance tasks from the conventional method which relies on documents and 2D drawings on visual inspection. This study targets two key issues: creating a BIM-based model for bridge inspection and maintenance; and developing this model in a MR platform based on Microsoft Hololens.

Design/methodology/approach

Literature review is conducted to determine the limitation of MR technology in the construction industry and identify the gaps of integration of BIM and MR for bridge inspection works. A new framework for a greater adoption of integrated BIM and Hololens is proposed. It consists of a bridge information model for inspection and a newly-developed Hololens application named “HoloBridge”. This application contains the functional modules that allow users to check and update the progress of inspection and maintenance. The application has been implemented for an existing bridge in South Korea as the case study.

Findings

The results from pilot implementation show that the inspection information management can be enhanced because the inspection database can be systematically captured, stored and managed through BIM-based models. The inspection information in MR environment has been improved in interpretation, visualization and visual interpretation of 3D models because of intuitively interactive in real-time simulation.

Originality/value

The proposed framework through “HoloBridge” application explores the potential of integrating BIM and MR technology by using Hololens. It provides new possibilities for remote inspection of bridge conditions.

Article
Publication date: 7 March 2023

Kaiyang Wang, Fangyu Guo, Ruijia Zhou and Liang Qian

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into…

Abstract

Purpose

In recent years, augmented reality (AR) has shown its potential to assist various construction activities. Its use commonly requires additional refinement to be integrated into the building information modeling (BIM) process. Nevertheless, few studies have investigated AR implementation in BIM-enabled projects because of numerous challenges related to its implementation. This study aims to investigate the implementation of AR in construction and identify the critical mechanisms for implementing BIM-AR successfully.

Design/methodology/approach

A mixed methodology was adopted for this study. First, this work presents a bibliometric analysis covering articles obtained from Scopus database published between 2000 and 2022. A sample size of 65 research papers pertinent to AR in construction was analyzed using VOSviewer software. Second, a participatory case study was conducted for a BIM-enabled project in China to gain insight into how BIM-AR implementation in construction is achieved.

Findings

The findings from the bibliometric analysis show an increasing interest in AR research within construction. The results indicate that AR research focuses on four clusters: real-time communication, project management, construction activities and education. Findings from the case study provide an empirical experience of AR application scenarios in a BIM-enabled project. Concomitantly, 15 critical success factors that influence BIM-AR implementation were finally identified and demonstrated.

Originality/value

This study provides a rich insight into the understanding and awareness of implementing AR. First, the findings are beneficial to construction practitioners and researchers because they provide a concentrated perspective of AR for emerging activities in the construction industry. Second, the results obtained from the case study could provide a useful guide for effectively implementing AR in a BIM-enabled construction project. Overall, this study may stimulate further research on AR-related studies in construction, such as BIM integration, factor analysis and construction education.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality

8985

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 28 September 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction…

1492

Abstract

Purpose

Built environment organisations face global challenges between business units, especially since the coronavirus pandemic (COVID-19) has profoundly disrupted the construction industry worldwide, including the management of construction megaprojects (CMPs). This research aims to develop a competency framework, for global integrated delivery (GID) transformative initiatives and future of work (FOW) global initiatives, to manage integration between lean construction (LC) practices and integrated project delivery (IPD) on CMPs in contemporary multinational engineering organisations.

Design/methodology/approach

Mixed research methods” involves a two-stage quantitative and qualitative research approach. In the context of CMPs, stage one consisted of a qualitative research methodology comprising a literature review to examine competencies, COVID-19 impacts, responses and key drivers (KDs) to integrate LeanIPD&GID; stage one outcomes propose a conceptualisation of LeanIPD&GID, a competency framework and future of work (FOW) global initiatives. Stage two involved an empirical questionnaire survey for a set of 30 KDs arranged into five-factor clusters (FCs), 226 respondents from 23 countries with an extensive cosmopolitan experience; analysis adopted structural equation modelling (SEM), descriptive and inferential statistics, percentage scoring analysis, principal component analysis (PCA) and eigenvalues.

Findings

In the context of CMPs, stage one outcomes delivered a conceptualisation of LeanIPD&GID, a proposed competency framework and FOW global initiatives. Stage two concluded that the most significant KDs are “collaboration in design, construction works and engineering management,” “coordination and planning of construction work,” “senior organisational management support,” “boosting implementation of LC, and integrating project delivery” and “earlier and precise 3D visualisation of designs”. building information modelling (BIM) adoption in the MENA region is higher than LC; the second is still taking its first steps, while IPD has little implementation. LeanBIM is slightly integrated, while LeanIPD integration is almost not present.

Originality/value

The research findings, conceptualised LeanIPD&GID principles, a proposed competency framework and FOW global initiatives, provided future research streams and directions; the study has provided a competency framework and FOW global initiatives for effective practical strategies for enhancing integration of LeanIPD&GID transformative initiatives on CMPs and will allow project key stakeholders to place emphasis on boosting LeanIPD&GID KDs.

Article
Publication date: 1 February 2016

Masoud Gheisari and Javier Irizarry

With the facility management industry increasingly adopting building information modeling (BIM) technologies, there is a need to investigate where this industry stands in its…

3314

Abstract

Purpose

With the facility management industry increasingly adopting building information modeling (BIM) technologies, there is a need to investigate where this industry stands in its application. Moreover, studies on efficient and cost-effective solutions to integrate BIM and mobile augmented reality (MAR) present an environment where facility managers can experience an intuitive natural interaction with their mobile interfaces to efficiently access needed information. The industry’s view on this new approach of accessing information from BIM models should also be investigated, and its feedback should be considered for future phases of this avenue of research.

Design/methodology/approach

This paper explores not only how BIM can be beneficial to facility management practitioners, but also how its integration with MAR and making the data accessible through handheld mobile devices can enhance current facility management practices. An online survey was conducted to assess professional facility managers’ characteristics, technology use and working environment as well as the current status of BIM application in their practices. An online video scenario has also been used to illustrate to facility managers how an ideal BIM-MAR-integrated environment could provide them with mobile access to their required information. Facility managers’ feedback on usability, applicability and challenges of such environment has also been investigated through a follow-up survey.

Findings

With this paper, industry practitioners as well as academic researchers will be able to understand the current status of BIM and mobile computing application in facility management along with the benefits and challenges of implementing these technologies in an augmented reality (AR) environment.

Originality/value

Understanding facility managers’ requirements, characteristics and the way they do their tasks would be of great value for development of tools or systems that would facilitate their practices.

Details

Facilities, vol. 34 no. 1/2
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 30 September 2014

Jun Wang, Xiangyu Wang, Wenchi Shou and Bo Xu

The purpose of this research is to investigate a new approach with its supporting building information modelling (BIM) + augmented reality (AR) tool to enhance architectural…

3881

Abstract

Purpose

The purpose of this research is to investigate a new approach with its supporting building information modelling (BIM) + augmented reality (AR) tool to enhance architectural visualisation in building life cycle. Traditional approaches to visualise architectural design concentrate on static pictures or three-dimensional (3D) scale models which cause problems, such as expensive design evolution, lack of stakeholders’ communication and limited reusability. The 3D animated fly-throughs still occur on a computer screen in two-dimensions and seem cold and mechanical, unless done with advanced production software.

Design/methodology/approach

The method of this research included case study and interview. It was, first, stated, from the building process perspective, how the BIM + AR for Architectural Visualisation System (BAAVS) was realised by integrating two types of visualisation techniques: BIM and AR, and four stages of building life cycle. Then the paper demonstrated four case studies to validate the BAAVS. Finally, four interviews were made with each case manager and team members to collect feedback on utilising BAAVS technology. Questions were asked in the areas of benefits, drawbacks and technical limitations with respect to BAAVS.

Findings

Feedback from the stakeholders involved in the four cases indicated that BAAVS was useful and efficient to visualise architectural design and communicate with each other.

Originality/value

This paper demonstrates BAAVS that integrated BIM and AR into architectural visualisation. The system supports an innovative performance that allows: designers to put virtual building scheme in physical environment; owners to gain an immersive and interactive experience; and property sellers to communicate with customers efficiently.

Details

Construction Innovation, vol. 14 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 February 2014

Javier Irizarry, Masoud Gheisari, Graceline Williams and Kathy Roper

Healthcare facility managers work in complex and dynamic environments where critical decisions are constantly made. Providing them with enhanced decision support systems would…

2780

Abstract

Purpose

Healthcare facility managers work in complex and dynamic environments where critical decisions are constantly made. Providing them with enhanced decision support systems would result in a positive impact on the productivity and success of the projects they undertake, as well as the sustainability of critical healthcare infrastructure. The purpose of this paper is to propose a conceptual ambient intelligent environment for enhancing the decision-making process of the facility managers. This low-cost data-rich environment would use building information modeling (BIM) and mobile augmented reality (MAR) as technological bases for the natural human-computer interfaces and aerial drones as technological tools.

Design/methodology/approach

This paper presents a scenario for the integration of augmented reality (AR) and building information modeling (BIM) to build an ambient intelligent (AmI) environment for facility managers where mobile, natural, user interfaces would provide the users with required data to facilitate their critical decision-making process. The technological requirements for having such an intelligent environment are also discussed.

Findings

The proposed BIM-MAR-based approach is capable of enhancing maintenance related practices for facility managers who are mobile to integrate with their facilities' intelligent environment. This approach is also capable of providing a collaborative environment in which different stakeholders, across geographically distributed areas, could work together to solve facility management tasks.

Originality/value

In this paper ambient intelligence will be considered for the first time in the area of healthcare facility management practices to provide facility managers with an intelligent BIM-based environment to access facility information and consequently enhance their decision-making process.

Article
Publication date: 15 June 2023

Amna Salman and Wasiq Ahmad

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only…

Abstract

Purpose

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only 5–10%. Therefore, enhancing and optimizing the O&M of a facility is a crucial issue. In addition, with the increasing complexities in a building's operating systems, more technologically advanced solutions are required for proactively maintaining a facility. Thereby, a tool is needed which can optimize and reduce the cost of facility maintenance. One of the solutions is Augmented or Mixed Reality (AR/MR) technologies which can reduce repair time, training time and streamline inspections. Therefore, the purpose of this study is to establish contextual knowledge of AR/MR application in facilities operation and maintenance and present an implementation framework through the analysis and classification of articles published between 2015 and 2022.

Design/methodology/approach

To effectively understand all AR/MR applications in facilities management (FM), a systematic literature review is performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) protocol was followed for searching and describing the search strategies. Keywords were identified through the concept mapping technique. The Scopus database and Google Scholar were employed to find relevant articles, books and conference papers. A thorough bibliometric analysis was conducted using VOS Viewer and subsequently, a thematic analysis was performed for the selected publications.

Findings

The use of AR/MR within facilities O&M could be categorized into five different application areas: (1) visualization; (2) maintenance; (3) indoor localization and positioning; (4) information management and (5) indoor environment. After a thematic analysis of the literature, it was found that maintenance and indoor localization were the most frequently used research application domains. The chronological evolution of AR/MR in FM is also presented along with the origin of publications, which showed that the technology is out of its infancy stage and is ready for implementation. However, literature showed many challenges hindering this goal, that is (1) reluctance of the organizational leadership to bear the cost of hardware and trainings for the employees, (2) Lack of BIM use in FM and (3) system lagging, crashing and unable to register the real environment. A preliminary framework is presented to overcome these challenges.

Originality/value

This study accommodates a variety of application domains within facilities O&M. The publications were systematically selected from the existing literature and then reviewed to exhibit various AR/MR applications to support FM. There have been no literature reviews that focus on AR and/or MR in the FM and this paper fills the gap by not only presenting its applications but also developing an implementation framework.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Content available
Article
Publication date: 25 April 2023

Benjamin Jowett, David John Edwards and Mohamad Kassem

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT…

Abstract

Purpose

This study aims to develop a taxonomy of requirements for mobile BIM technologies (MBT), clarify the relating terms and concepts, and identify the interactions between MBT features and the construction management functions on sites.

Design/methodology/approach

A positivist approach with elements of interpretivism is adopted to allow to capture what is perceived as “reality” in relation to individuals’ interpretation and experience in the use and implementation of MBT. This is achieved by using a mixed qualitative-quantitative approach that can capture the various understandings of MBT. The research methods included a longitudinal case study over 12 months, two project workshops, expert interviews and an industry survey that together helped to investigate MBT at project, enterprise and industry levels.

Findings

The MBT requirements taxonomy included requirements relating to both project and organisation. Project requirements addressed MBT functionalities for sites and information management, while organisation requirements focused on the integration of MBT solutions with the enterprise from information technology, legal and security perspectives. A detailed matrix showing the interactions between five key MBT features and seven construction management functions was also developed.

Research limitations/implications

The two constructs developed by this study can help researchers to structure their investigation of key uses of MBT applications and their benefits. It can be used by researchers aiming to investigate integrated approaches to the digitalisation of construction sites, such as those enabled by Digital Twins. The interaction matrix can aid researchers in evaluating the intersections between the MBT functionalities and the site construction management functions (e.g. theoretical analysis of interactions from Lean Construction, benefit evaluation perspective). More broadly, the two constructs can support research and practice investigating the development of data-driven approaches on construction sites.

Practical implications

The developed MBT taxonomy can guide construction organisations in selecting suitable MBT for Field BIM for their projects. It can also act as a baseline against which varying MBT solutions can be compared.

Originality/value

Constructs such as taxonomies for MBTs; an understanding of MBT capabilities and use within the industry; and a lack of delineation between related terms, such as Mobile BIM, Field BIM, Site BIM, Cloud BIM and Mobile Apps, were lacking in the literature. This study contributed to addressing this gap.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

1 – 10 of 671