Search results

1 – 10 of 156
Open Access
Article
Publication date: 25 October 2021

Yaser Gamil and Ismail Abd Rahman

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in…

14273

Abstract

Purpose

The purpose of this paper is to develop a structural relationship model to study the relationship between causes and effects of poor communication and information exchange in construction projects using Smart-PLS.

Design/methodology/approach

The first method of this research is to identify the causes and effects factors of poor communication in construction projects from the extant of literature. The data used to develop the model was collected using a questionnaire survey, which targeted construction practitioners in the Malaysian construction industry. A five-point Likert type scale was used to rate the significance of the factors. The factors were classified under their relevant construct/group using exploratory factor analysis. A hypothetical model was developed and then transformed into Smart-PLS in which the hypothetical model suggested that each group of the cause factors has a direct impact on the effect groups. The hypothesis was tested using t-values and p-values. The model was assessed for its inner and outer components and achieved the threshold criterion. Further, the model was verified by engaging 14 construction experts to verify its applicability in the construction project setting.

Findings

The study developed a structural equation model to clarify the relationships between causes and effects of poor communication in construction projects. The model explained the degree of relationships among causes and effects of poor communication in construction projects.

Originality/value

The published academic and non-academic literature introduced many studies on the issue of communication including the definitions, importance, barriers to effective communication and means of poor communication. However, these studies ended up only on the general issue of communication lacking an in-depth investigation of the causes and effects of poor communication in the construction industry. The study implemented advanced structural modeling to study the causes and effects. The questionnaire, the data and concluding results fill the identified research gap of this study. The addressed issue is also of interest because communication is considered one of the main knowledge areas in construction management.

Details

Journal of Facilities Management , vol. 21 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 8 November 2022

Inimbom Walter Isang and David Ojimaojo Ebiloma

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…

2891

Abstract

Purpose

Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.

Design/methodology/approach

A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.

Findings

The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.

Originality/value

The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 13 June 2023

Gabriel Castelblanco, Jose Guevara and Alberto De Marco

Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis…

1878

Abstract

Purpose

Global crises have become increasingly recurrent events that jeopardize public-private partnerships (PPPs). In this context, the purpose of this paper is to expose the PPP-crisis research agenda by combining bibliometric and network analyses.

Design/methodology/approach

The PPP literature associated with global crises between the 2008 global financial crisis and 2022 was analyzed in three stages: (1) paper selection and screening for the inclusion/exclusion of articles relevant to this research, (2) semantic network development for examining thematic relationships among selected papers by considering the co-occurrence of keywords within the chosen studies and (3) calculation of network metrics for analysis.

Findings

The paper identified six research avenues for the PPP-crisis agenda: public interest, relational governance, risk management, user-pay PPPs, crisis management and financial performance. The PPP-crisis literature has spread significantly in the last five years driven by the case study approaches on a national or regional basis. Conversely, non-crisis periods generate room to strengthen user-pay PPPs and relational governance. The pandemic and post-pandemic times shared the priorities of the 2008 financial crisis but also strengthened the management of the risks and the structural drivers of the global crisis.

Originality/value

This study demonstrates that during global crisis periods, the public interest and financial performance gain relevance in a detriment of structural solutions to social legitimacy erosion of PPPs because of the urgency of giving tools to the public and private sectors to tackle the financial issues, which steer future issues for PPPs.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Content available
Article
Publication date: 5 January 2015

Derek Walker

206

Abstract

Details

International Journal of Managing Projects in Business, vol. 8 no. 1
Type: Research Article
ISSN: 1753-8378

Open Access
Article
Publication date: 5 March 2018

Gro Holst Volden and Bjorn Andersen

The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the…

7099

Abstract

Purpose

The purpose of this paper is to study public project governance frameworks in various ministries and agencies in Norway, following the introduction of such a framework on the topmost level (i.e. the cabinet) which applies to the very largest projects.

Design/methodology/approach

The study is methodologically designed as a qualitative assessment of project governance frameworks that apply to state-funded investment projects in selected sectors, based on data gathered through document reviews and interviews.

Findings

The study finds that all of the agencies have introduced their own project governance frameworks, which are basically consistent with the recommendations from the project management literature and with the cabinet’s overall requirements in Norway. By contrast, only one ministry has taken a formalized role as a project owner. Governance tasks thus seem to be extensively delegated to the subordinate agencies. This even includes strategic tasks such as project selection and portfolio management, and implies there is a risk that public project governance has a narrow and internal focus.

Originality/value

The paper is a first step toward a better understanding of public project governance as a hierarchical system and the relationship between project owners on three levels, the cabinet, the sectoral ministry, and the government agency.

Details

International Journal of Managing Projects in Business, vol. 11 no. 1
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 28 March 2018

Henry Oluchukwu Ikediego, Mustafa Ilkan, A. Mohammed Abubakar and Festus Victor Bekun

There is growing interest in innovative online problem-solving models such as crowdsourcing to serve individuals, firms and the society as a whole. Crowdsourcing is the…

6859

Abstract

Purpose

There is growing interest in innovative online problem-solving models such as crowdsourcing to serve individuals, firms and the society as a whole. Crowdsourcing is the combination of efforts from various sets of individuals who are either volunteering or working part-time for socioeconomic production, basically in the cyber world. This hybrid work model is already in use by businesses and entrepreneurs; some of the platforms include Amazon mechanical Turk, 99designs, Hit RECORD and Design Crowd.

Design/methodology/approach

Much has been parleyed and published, and this is primarily because of the efficient socioeconomic potentials crowdsourcing offers.

Findings

This paper addressed the following three questions to help have a better understanding of crowdsourcing: who can perform crowdsourcing? why it is relevant to crowdsource in this present proliferated internet age and if there are going to be some changes in the future and the last but not the least what can be done to promote it in the society?

Originality/value

This paper discusses the three W’s and concludes with challenges facing the crowdsourcing work model.

Details

International Journal of Crowd Science, vol. 2 no. 1
Type: Research Article
ISSN: 2398-7294

Keywords

Open Access
Article
Publication date: 30 June 2023

Henry Okpo, Dubem Ikediashi and Afolabi Dania

The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point…

Abstract

Purpose

The rate of project failure across the globe seems to reinforce poor performance as a norm. However, engagement with construction digitalisation (CD) represents a departure point for improving project performance. Amidst researchers' recent empirical engagement with CD, the knowledge of the relationship model between CD and project delivery (PD) is abysmal. As a result, developing a business case for CD in developing countries has been slow due to the dearth of empirical evidence. This paper aims to investigate the influence of digitalisation on project performance.

Design/methodology/approach

Anchored on cross-sectional survey research design using a questionnaire survey in which a total of 183 copies of structured questionnaires were randomly distributed to medium- and large-sized construction firms operating in Abuja, Nigeria's federal capital. A total of 126 valid responses were received giving an overall response rate of 68.8%. The responses were analysed using mean item score, principal component analysis and multiple linear regression.

Findings

Findings from the regression analysis reveal that digitalisation has varying levels of impact on PP measured using quality, time and cost. The relationship model with time performance is weak (r = 0.526, r2 = 0.277); on cost performance, the significant model is also weak (r = 0.502, r2 = 0.252) and moderate on quality (r = 0.663, r2 = 0.439). CD influences project cost, time and quality performance despite the weak relationship model. The results indicate that the most effective benchmark of CD is quality performance.

Originality/value

This study established the relationship between digitalisation and construction PD within the construction industry context, an area lacking research attention in emerging economies. This study is the first study in emerging economies that established the influence of digitalisation on construction PD statistically.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 4
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 18 May 2022

Salman Ashkanani and Robert Franzoi

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current…

5395

Abstract

Purpose

There is a large amount of published literature on project management. However, there exists a gap between the existing literature and current practices in the industry for the development and execution of megaprojects. Existing literature generally focuses on individual elements applicable to project management in general. This article aims to provide an overview of the project management system components used in industrial megaprojects and identify the gaps between theory and practice, which can be used as input for further research on the topic.

Design/methodology/approach

The topic of megaproject management is reviewed based on available literature sources on megaproject management systems to identify the main gaps in the literature between theory and practice. Based on the findings, an analysis is provided to discuss the improvements required in distinct project management areas and phases.

Findings

There are multiple gaps associated with issues, failures, successes and challenges in industrial megaprojects. Improvements are needed in distinct management areas and over the entire project lifetime. Further guidelines are required for achieving improved megaproject management systems. Such concepts could benefit researchers and practitioners in streamlining their research toward the most relevant and critical areas of improvement of megaproject management systems.

Originality/value

This study addresses the literature gaps between theory and practices on megaproject management systems with an overview that provides helpful guidance for industrial applications and future research. A holistic analysis identifies gaps and critical drives in the body of knowledge, revealing avenues for future research focused on quality as the central pillar that affects the entire megaproject management system.

Details

Management Matters, vol. 19 no. 2
Type: Research Article
ISSN: 2752-8359

Keywords

Content available
Article
Publication date: 12 October 2021

Dimitrios V. Lyridis, Georgios O. Andreadis, Christos Papaleonidas and Violetta Tsiampa

The current study addresses how blockchain can deal with the challenges that the midstream liquefied natural gas (LNG) supply chain poses combined from a management standpoint…

1565

Abstract

Purpose

The current study addresses how blockchain can deal with the challenges that the midstream liquefied natural gas (LNG) supply chain poses combined from a management standpoint. Such challenges are: the volume of transactions, communication hurdles and the lack of contemporary management tools. The paper proposes a comprehensive framework to assess the impact of blockchain implementation in the midstream LNG supply chain in order to tackle those barriers.

Design/methodology/approach

The basis of the research is the business process modelling (BPM), through which entities, roles, tasks, resources and transactions can be modelled and simulated. The modelling of the midstream LNG supply chain, via BPM, is based on guidelines of the Society of International Gas Tanker and Terminal Operators (SIGGTO) and common industry business models. A quantitative analysis is employed to support the motivation and the potential impact of blockchain implementation. The methodology is used to identify (1) inefficiencies related to large volume of transactions between stakeholders and (2) critical areas of an LNG shipping company, where blockchain can be implemented.

Findings

Process repeatability, numerous shared documentation forms, excessive paperwork and communication imbroglios are mapped from the modelling section. Up to 327 processes are repeated during a typical vessel voyage, and up to 122 shared documentation forms are exchanged. Excessive paperwork and communication imbroglios are tracked through, which correspond to 25 severe errors as detected. By implementing the methodology, stakeholders can quantify the possible impact of blockchain on the operational performance of each stakeholder's operations separately and the supply chain as a whole in terms of real-time monitoring, transparency and paperwork reduction, time and cost savings.

Research limitations/implications

The research has certain limitations deriving from its conceptual nature. The business processes' modelling is based on standard procedures described in the guidelines by SIGGTO and may need further adjustment for specific use cases. A structured case study has not been realisable as corporate data for an LNG shipping company regarding processes and other commercial sensitive information are required.

Practical implications

Potential practitioners may exploit the proposed framework as a low cost and seamless tool to evaluate how blockchain could disrupt their operations. Thus, the blockchain implementation's improvements or weaknesses can be pinpointed, and enabling the interested stakeholder of the LNG supply chain with specific feedback, it can guide them towards informed decisions on their operations.

Originality/value

The research has a novel approach as it combines the creation of practical management framework, with a comprehensive visualization of the midstream LNG supply chain. Thus, the reader can identify in which parts of the midstream LNG supply chain can blockchain be implemented, and what impact it could have in terms of supply chain operations.

Details

Maritime Business Review, vol. 7 no. 1
Type: Research Article
ISSN: 2397-3757

Keywords

Content available
Article
Publication date: 10 June 2021

Muhammad Sami Ur Rehman, Muhammad Tariq Shafiq and Muneeb Afzal

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on…

4129

Abstract

Purpose

The coronavirus disease 2019 (COVID-19) pandemic has affected the global economy and, thus, the global construction industry. This paper aims to study the impact of COVID-19 on construction project performance in the United Arab Emirates (UAE).

Design/methodology/approach

This study adopted a qualitative and exploratory approach to investigate the impact of COVID-19 and its policies on project performance in the UAE construction industry in critical areas of the project management body of knowledge (e.g. schedule, cost, resources and contracts). Semi-structured interview questions were asked from ten construction professional to obtain valuable insights into the pandemic’s effects on the UAE construction industry and the effectiveness of policies implemented to rectify the damage and identify the industry’s new normal.

Findings

The findings indicate that the construction industry faced several challenges such as schedule delays, disrupted cashflows, delayed permits, approvals and inspections, travel restrictions, serious health and safety concerns, material and equipment shortages, among others which hindered the timely delivery of construction projects. It also indicates that efforts made by the government institutions and the construction industry of the UAE such as economic support programs, digitization of processes, fee and fine waivers, health facilities, among other statutory relaxations proved effective in supporting the construction industry against the adverse effects of the pandemic.

Research limitations/implications

The research findings are limited to the literature review and ten semi-structured interviews seeking an expert’s opinion from industry professionals working in the UAE construction industry. The research team did not get access to project documents, contracts and project progress reports which may be required to validate the interview findings, and to perform an in-depth analysis quantifying the impact of COVID 19 on construction projects performance, which is a limitation of this research.

Practical implications

The implication is that, owing to the imposed lockdowns and strict precautionary measures to curb the rapid spread of the pandemic, smooth execution of the construction project across the country was affected. The government institutions and stakeholders of the construction projects introduced and implemented various techniques and solutions which effectively handled the implications of the COVID-19 pandemic on the construction industry of the UAE.

Originality/value

This study has identified the challenges faced by the construction industry of the UAE in the context of the management of project schedule, project cost, construction contracts, health and safety of construction employees and other related aspects of the construction projects. This study also identified the techniques and solutions adopted by various public and private institutions of the country and their implications on construction projects. Therefore, this study provides guidelines for policymakers and future research studies alike.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Access

Only content I have access to

Year

Content type

Article (156)
1 – 10 of 156