Article
Publication date: 21 February 2024

Hassan Mohamed

The purpose of this paper is to examine the supervening loss of inter-organisational trust in long-term commercial contracts. The underlying research question is whether contract…

Abstract

Purpose

The purpose of this paper is to examine the supervening loss of inter-organisational trust in long-term commercial contracts. The underlying research question is whether contract law – the legal institution regulating economic exchanges – should intervene and enable a party to a long-term commercial contract to extricate itself from a situation where a relationship of trust has broken down irretrievably.

Design/methodology/approach

This paper uses doctrinal methodology and theoretical conceptualisation to answer the underlying research question. The legal instrument chosen for analysis purposes is the UNIDROIT Principles of International Commercial Contracts. This paper also draws on extant literature on inter-organisational trust (including conceptual and empirical studies) to support the arguments and propositions. Furthermore, this study proceeds to assess the substantive justifiability of the proposed remedial measure using four normative values: legal certainty and predictability, protection of the performance interest, economic efficiency and the preservation of the relation.

Findings

The central argument put forward in this paper is the reformulation of draft Article 6.3.1 proposed by the UNIDROIT Working Group on Long-Term Contracts, which confers a novel right to terminate for a compelling reason. This paper presents a multidimensional model of inter-organisational trust that would serve as the conceptual framework for the proposed reformulation of the provision and establishes a coherent juridical basis for the legal solution that would accord with the Principles of International Commercial Contracts’ general remedial scheme. As for the normative assessment, this paper demonstrates that the proposed remedial measure would significantly promote efficient outcomes and positively serve the norms of legal certainty, protection of the performance interest and the preservation of the relation.

Originality/value

This paper addresses the lacuna in current legal scholarship in relation to the adverse socio-economic effects following trust violation and deterioration in inter-organisational relationships. Additionally, the propositions and findings should contribute to the workings of the UNIDROIT in adopting new rules and principles that would serve the special requirements of cross-border trade.

Details

International Journal of Law and Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-243X

Keywords

Article
Publication date: 13 July 2023

Haitham Alajmani, Salma Ahmed and Sameh Monir El-Sayegh

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19…

Abstract

Purpose

This paper aims to measure the severity, frequency and importance of the factors causing delays in the United Arab Emirates (UAE) construction industry following the Covid-19 pandemic onset. The study also measures the likelihood of the effects caused by these delays.

Design/methodology/approach

A mixed approach of both qualitative and quantitative. Literature review was conducted to extract 40 factors of delays and 10 effects of delays. A survey was then administered to construction professionals in the UAE to collect the perceptions on the severity and frequency of factors of the causes of delays using a Likert Scale of 1–5 where 1 represented very low and 5 represented very high. Similarly, the respondents were also asked to rate the likelihood of the occurrence of the effects of the delays based on a Likert scale of 1–5 as well. Furthermore, Spearman’s rank correlation was also conducted to compute the level of agreement between the different parties; owner, consultants and contractors.

Findings

The results revealed that the top five factors of delays include: award the project for the lowest bidder, delay in progress payment, change orders by the owner, poor subcontractor performance and inadequate planning and scheduling by the contractor. The findings of this study emphasize the financial challenges and economic crisis brought upon the construction industry due to the pandemic. Furthermore, the pandemic also shifted the perceptions of construction professionals, who are now more aware of the delays caused by awarding the project to the lowest bidder who would not have the required qualifications to conduct efficient planning and scheduling that are relevant in the case of extraordinary events such as Covid-19. Moreover, a high level of agreement between the consultants and contractors was observed, with a Spearman’s rank correlation of 0.804. Additionally, the most likely effects of delays concluded from this study were time overrun/extension and poor quality of work.

Originality/value

Literature review is very rich in the field of construction projects delays. However, there is very limited research on the impact of Covid-19 in the context of construction projects delays, and insights from construction professionals regarding this matter are particularly lacking in literature. Therefore, this paper bridges the gap in literature by providing perceptions of construction professionals on the impact of Covid-19 on the factors causing delays in the UAE construction industry. The findings of this research are expected to be an invaluable resource for future to help the construction industry heal faster when encountering similar epidemics or extraordinary events.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 May 2022

Stavros K. Kourkoulis, Ermioni D. Pasiou, Christos F. Markides, Andronikos Loukidis, Ilias Stavrakas and Dimos Triantis

The determination of mode-I fracture toughness of brittle structural materials by means of the notched Brazilian disc configuration is studied. Advantage is taken of a recently…

Abstract

Purpose

The determination of mode-I fracture toughness of brittle structural materials by means of the notched Brazilian disc configuration is studied. Advantage is taken of a recently introduced analytical solution and, also, of data provided by an experimental protocol with notched marble specimens under diametral compression using the loading device suggested by International Society for Rock Mechanics (ISRM) and also the three-dimensional digital image correlation (3D-DIC) technique.

Design/methodology/approach

The analytical solution highlighted the role of geometrical factors, like, for example, the width of the notch, which are usually disregarded. The data of the experimental protocol were comparatively considered with those concerning the response of the specific material under uniaxial tensile load.

Findings

This combined study provided interesting data concerning some open issues, as it is the exact crack initiation point and the level of the critical load causing crack initiation. It was definitely indicated that the crack initiation point is not a priori known (even for notched specimens) and, also, that the maximum recorded load does not correspond by default to the critical load responsible for the onset of catastrophic macroscopic fracture.

Originality/value

It was suggested that the load considered critical one for the determination of mode-I fracture toughness KIC is erroneous. At a load equal to about 70% of the maximum one, a process zone is formed (zone of non-reversible phenomena) around the notch's crown, designating termination of the validity of any linear elastic solution used to determine the normalized stress intensity factors (SIFs). Moreover, at a load level equal to about 95% of the macroscopically observed fracture load, crack propagation has already begun. Therefore, the experimental procedure must be monitored with additional equipment, providing an overview of the displacement field developed during loading.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Abstract

Details

Understanding Financial Risk Management, Third Edition
Type: Book
ISBN: 978-1-83753-253-7

Article
Publication date: 15 February 2024

Zhongwei Sun, Xuchuang Zhang and Xiaofang Wu

This study investigates the mediating role of wage and workforce adjustments, along with the moderating influence of collective bargaining system and employees’ localization, in…

Abstract

Purpose

This study investigates the mediating role of wage and workforce adjustments, along with the moderating influence of collective bargaining system and employees’ localization, in elucidating the relationship between the COVID-19 shock and workplace employee relations (ER) tension.

Design/methodology/approach

Survey data from 1,483 enterprises across 21 prefectural cities in China’s Guangdong Province are collected. The hypotheses are tested by logistic regression.

Findings

The study reveals a positive correlation between the COVID-19 shock and workplace ER tension across crisis-hit enterprises, irrespective of their size or industrial sector. Wage reduction and mass layoffs emerge as significant mediators, while the collective bargaining system (CBS) and employees’ localization act as moderators.

Research limitations/implications

The measurement of ER is limited in a single-item scale. Representation of China is also limited since the study exclusively focuses on Guangdong province. The study offers some contributions that firm-level data reveal the pathway through which COVID-19 creates ER tension.

Practical implications

On the one hand, the authors recommend the establishment of an effective communication system between employers and employees. On the other hand, managers should consider the role of informal institutions. Furthermore, the authors suggest implementing tailored strategies at the enterprise level.

Social implications

Intense external shocks result in widespread layoffs and increased wage reductions within workplaces, and under such circumstances, formal or informal institutions may be insufficient to alleviate ER tension. In this case, the state authorities – including governments and other public agencies or bodies – are necessary to intervene in to organize tripartite dialogue.

Originality/value

While numerous emerging studies on COVID-19 explore how different countries manage industrial relations tension at the national level, few focus on ER at workplace level, particularly in developing countries. Understanding how workplace ER evolve during external shocks and identifying institutional measures to mitigate their negative impact is crucial for future crisis management.

Details

Employee Relations: The International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0142-5455

Keywords

Article
Publication date: 1 March 2024

Kayla B. Follmer, Mackenzie J. Miller and Joy E. Beatty

Research related to workplace accommodation requests for employees with mental illness is scarce, though evidence suggests that these individuals often fail to request…

Abstract

Purpose

Research related to workplace accommodation requests for employees with mental illness is scarce, though evidence suggests that these individuals often fail to request accommodations even when needed. The authors' research study aimed to address these shortcomings by (1) assessing employees' knowledge of Americans with Disabilities Act (ADA) laws and how this knowledge influences employees' perceived need for and requests of accommodations; (2) examining the relationship between employees' perceived need for accommodations and employees' workplace outcomes and (3) examining the relationship between perceived need for accommodations and employees' actual accommodation requests, as well as how stigma influences this relationship.

Design/methodology/approach

The authors used two survey studies to investigate their research questions. Study 1 participants were recruited through Amazon's MTurk, and Study 2 participants were recruited through support groups for individuals diagnosed with mood disorders (i.e. depression and bipolar disorder).

Findings

The authors found significant gaps in both subjective and objective ADA-related knowledge among participants in their sample. The authors' Study 1 results also revealed an interaction between the perceived need for accommodations and accommodation requests in predicting job satisfaction and turnover intentions. When employees needed accommodations but did not request them, it resulted in worsened workplace outcomes. In Study 2, the authors aimed to identify barriers to requesting accommodations. The authors found that the relationship between perceived need for accommodations and actual accommodation requests was moderated by both public and self-stigma, thereby showing that stigma can impede individuals from requesting needed accommodations at work.

Originality/value

The authors' study sheds light on a population that has been relatively understudied in the workplace accommodations literature, namely those with mental illness. The authors first identify the perceived need for accommodations as an important factor in making accommodations requests at work, as prior work has failed to differentiate how the need for accommodations can vary across individuals. Next, the authors show how workplace outcomes (i.e. job satisfaction and turnover intentions) are negatively affected when employees need accommodations but do not request them. Finally, the authors demonstrate how both public stigma and self-stigma can reduce the likelihood that individuals request accommodations at work, even when needed.

Details

Equality, Diversity and Inclusion: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-7149

Keywords

Article
Publication date: 10 May 2022

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu and David John Edwards

This study aims to evaluate the key risk factors inherent in public–private partnership (PPP) power projects in Ghana and further determine the critical risk factors affecting…

Abstract

Purpose

This study aims to evaluate the key risk factors inherent in public–private partnership (PPP) power projects in Ghana and further determine the critical risk factors affecting both the public and private sectors in PPP power projects.

Design/methodology/approach

Ranking-type Delphi survey in two rounds was conducted to establish a comprehensive list of critical risk factors of PPP. Purposive and snowball sampling techniques helped obtain experts for the Delphi survey. Mean score ranking, factor analysis, Cronbach α coefficient and Kendall’s concordance were used for analysis. The probability of occurrence and severity of each risk factor were computed to obtain the risk impact.

Findings

From the list of 67 risks, 37 risk factors were deemed to be critical. The five topmost risk factors were: delay payment on contract, private investor change, political risks, fluctuating demand of power generated and public opposition. Principal component analysis grouped the risk factors into seven major themes.

Originality/value

This study develops an authoritative risk factor list for PPP power projects, which reflects both sector and country conditions for prioritizing and mitigating risk factors. Delphi approach adopted in this study can be used by future studies in similar environments where PPP is novel and expert respondents scarce.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 18 April 2024

Kalpana Chandrasekar and Varisha Rehman

Global brands have become increasingly vulnerable to external disruptions that have negative spillover effects on consumers, business and brands. This research area has recently…

Abstract

Purpose

Global brands have become increasingly vulnerable to external disruptions that have negative spillover effects on consumers, business and brands. This research area has recently garnered interest post-pandemic yet remains fragmented. The purpose of this paper is to recognize the most impactful exogenous brand crisis (EBC) and its affective and behavioural impact on consumers.

Design/methodology/approach

In Study 1, we applied repertory grid technique (RGT), photo elicitation method and ANOVA comparisons, to identify the most significant EBC, in terms of repercussions on consumer purchases. In Study 2, we performed collage construction and content analysis to ascertain the impact of the identified significant crisis (from Study 1) on consumer behaviour in terms of affective and behavioural changes.

Findings

Study 1 results reveal Spread-of-diseases and Natural disaster to be the most impactful EBC based on consumer’s purchase decisions. Study 2 findings uncover three distinct themes, namely, deviant demand, emotional upheaval and community bonding that throws light on the affective and behavioural changes in consumer behaviour during the two significant EBC events.

Research limitations/implications

The collated results of the two studies draw insights towards understanding the largely unexplored conceptualisation of EBC from a multi-level (micro-meso-macro) perspective. The integrated framework drawn, highlight the roles and influences of different players in exogenous brand crisis management and suggests future research agendas based on theoretical underpinnings.

Originality/value

To the best of our knowledge, this is the first study which identifies the most important EBC and explicates its profound impact on consumer purchase behaviour, providing critical insights to brand managers and practitioners to take an inclusive approach towards exogenous crises.

Details

Marketing Intelligence & Planning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-4503

Keywords

Article
Publication date: 28 March 2024

Keshan (Sara) Wei

In recent years, negative spokesperson incidents have raised significant concerns in academia and industry. While several studies have addressed celebrity endorser scandals…

Abstract

Purpose

In recent years, negative spokesperson incidents have raised significant concerns in academia and industry. While several studies have addressed celebrity endorser scandals, comprehensive analyses of current knowledge are lacking. Therefore, this study systematically reviewed the related literature to better understand trends and suggest future research directions for advancing this field.

Design/methodology/approach

This study employs the theory–context–characteristics–methodology (TCCM) framework to examine 76 articles on celebrity endorser scandals.

Findings

Utilizing the TCCM framework, this study presents a comprehensive research framework, revealing that (1) the celebrity endorser scandal effect primarily includes associative learning, attribution of responsibility, and moral reasoning; (2) entertainment celebrities and athletes have received significant research attention; (3) both individual- and relationship-level characteristics serve as crucial moderators, with focal brand and related brand being the primary outcome variables. Additionally, this study outlines enterprise response strategies, encompassing the reformation of existing spokesperson relationships and the establishment of future spokesperson connections; and (4) quantitative approaches dominate the field.

Originality/value

This study integrates and expands existing research on celebrity endorser scandals while proposing future research opportunities to advance the field.

Details

Marketing Intelligence & Planning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0263-4503

Keywords

Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords