Article
Publication date: 16 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Yue Teng and Mengqi Yuan

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship…

Abstract

Purpose

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship sustainability. The developer satisfaction reflecting requirements can boost the cooperative relationship among stakeholders and act as an evaluation scale for the success of GB projects, which needs to be emphasized in the selection process but little involved in the existing research. This study explores improving GB contractor (GBC) selection by integrating developer satisfaction into selection procedures.

Design/methodology/approach

A systematic framework of GBC selection including twenty-five criteria from literature review and experts survey is firstly constructed. Both tactical and strategic criteria are further classified into Kano categories (must-be, one-dimensional, and attractive categories) using the fuzzy Kano model (FKM), and weighted by the developer satisfaction index. The model proposed by this study combining FKM and TOPSIS divides the selection process into the filtration phase and selection phase by Kano categories. The proposed model is finally verified through performance comparison among multiple methods in a case.

Findings

Selection criteria are measured linearly and nonlinearly, showing criteria having nonlinear satisfaction change accounts for two-thirds of all. Criteria at tactical level tend to be must-be or one-dimensional categories for the developer, and most strategic criteria are classed as the attractive category, indicating that adding strategic criteria is necessary for long-term cooperation. The proposed model, using developer satisfaction to improve the selection process, ensures the selected GBC to be the most satisfactory with requirements of the developer and makes the performance of GBCs easily distinguishable.

Originality/value

This study contributes to the existing body of knowledge for promoting relationship sustainability by supplementing an integrated model with emphasis on developer satisfaction in GBC selection, so as to establish a good initial foundation due to the match between performances of GBCs and needs of developers. It not only helps maximize developer satisfaction in GBC selection by applying satisfaction to pre-construction management, but also instructs GBCs to prioritize performance improvements. The framework is also conducive for developers to classify selection criteria and select other participants (like green suppliers) from the satisfaction perspective in GBs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 March 2024

Huimin Li, Boxin Dai, Yongchao Cao, Limin Su and Feng Li

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of…

26

Abstract

Purpose

Trust is the glue that holds cooperative relationships together and often exists in an asymmetric manner. The purpose of this study is to explore how to mitigate the issue of losses or increased transaction costs caused by opportunistic behavior in a soft environment where trust asymmetry is quite common and difficult to avoid.

Design/methodology/approach

This study focuses on examining asymmetric trust between the government and the private sector in public-private partnership (PPP) projects. Drawing upon both project realities and relevant literature, the primary conditional variables influencing asymmetric trust are identified. These variables encompass power perception asymmetry, information asymmetry, interaction behavior, risk perception differences and government-side control. Subsequently, through the use of a survey questionnaire, binary-matched data from both the government and the private sector are collected. The study employs fuzzy-set qualitative comparative analysis (fsQCA) to conduct a configurational analysis, aiming to investigate the causal pathways that trigger asymmetric trust.

Findings

No single conditional variable is a necessary condition for the emergence of trust asymmetry. The pathways leading to a high degree of trust asymmetry can be categorized into two types: those dominated by power perception and those involving a combination of multiple factors. Differences in power perception play a crucial role in the occurrence of high trust asymmetry, yet the influence of other conditional variables in triggering trust asymmetry should not be overlooked.

Originality/value

The findings can contribute to advancing the study of trust relationships in the field of Chinese PPP projects. Furthermore, they hold practical value in facilitating the enhancement of trust relationships between the government and the private sector.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 24 May 2023

Mohammad Daradkeh

Effective management of risk and knowledge is critical to ensure the success of industry–university collaboration (IUC) projects. However, the intricate dynamics through which…

Abstract

Purpose

Effective management of risk and knowledge is critical to ensure the success of industry–university collaboration (IUC) projects. However, the intricate dynamics through which these factors influence the performance of IUC projects have yet to be fully investigated. The purpose of this study is to explore the interplay between risk management and knowledge management capabilities and their impact on IUC project performance.

Design/methodology/approach

A model was constructed and evaluated through the examination of a sample of 188 collaborative innovation projects located in the United Arab Emirates (UAE), utilizing structural equation models (SEM) and hierarchical regression analysis.

Findings

The findings indicate that social system risk, technical system risk and project management risk have a negative impact on the performance of university–industry collaboration (UIC) projects, while cultural, technical and structural knowledge management capabilities can mitigate the negative impact of these risks on the performance of IUC projects.

Practical implications

The study concludes with three recommendations aimed at improving the management of UIC projects, including the establishment of a distinct and precise management strategy, the deployment of a comprehensive and systematized management methodology and the adoption of a balanced management framework.

Originality/value

The originality and value of this study lie in its exploration of the interplay between risk management and knowledge management capabilities in IUC projects. While previous studies have examined either risk management or knowledge management in IUC projects separately, this study provides a comprehensive analysis of both factors and their combined impact on project performance. The study also contributes to the literature by highlighting the specific risks and knowledge management capabilities that are most relevant to the context of IUC projects in the UAE. The practical recommendations offered by the study can help project managers and stakeholders to improve the success of collaborative innovation projects.

Details

Journal of Organizational Effectiveness: People and Performance, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2051-6614

Keywords

Article
Publication date: 15 March 2022

Ephraim Zulu, Sambo Lyson Zulu, Mwansa Chabala, Neema Kavishe, Charles Chifunda and Innocent Musonda

While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to…

Abstract

Purpose

While previous studies have highlighted the importance of incorporating environmental sustainability in building designs, there is a paucity of studies that assess the extent to which design teams in developing countries consider environmental sustainability at the building design stage. Therefore, using Zambia as a case study, this study examined the extent to which infrastructure design teams in a developing country consider environmental sustainability at the design stage.

Design/methodology/approach

The study used a qualitative research approach using structured interviews because there are hardly any studies which have explored the extent to which designers incorporate environmental sustainability in infrastructure designs in developing countries. The data is analysed thematically using the ATLAS.ti software.

Findings

The results show that environmental sustainability is not an important design consideration because it is secondary to functional, technical and aesthetic considerations. Environmental considerations are also made in an ad hoc manner and when it is cost-effective for the project. Regulatory requirements pertaining to environmental protection are adhered to without any cost considerations. It was, therefore, theorised that building design teams in developing countries make technical, functional and aesthetic consideration during the infrastructure design stage ahead of environmental considerations.

Originality/value

There is a paucity of studies that have investigated whether building infrastructure designers consider issues of environmental sustainability at the design stage in developing countries. The findings have practical implications on how developing countries can foster environmental sustainability at the design stage and avoid generating a building infrastructure stock that will require environmental resilience adaptation in the future.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 June 2022

Sy Tien Do, Viet Thanh Nguyen and Nghia Hoai Nguyen

This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP).

Abstract

Purpose

This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP).

Design/methodology/approach

Firstly, this study identifies the VOs, the CDs, criteria for measuring the PP and criteria for measuring the SP. Then, a survey questionnaire is created to collect data from stakeholders in construction projects. Using the factor analysis method, this study discovers the constructs of the VOs, CDs, PP and SP. The relationships among the constructs are then uncovered using a structural equation model.

Findings

The research findings confirm that the VOs and CDs have a direct effect on the PP, as well as the PP’s effect on SP, whereas the VOs and CDs have no effect on the SP. It is strongly recommended that critical factors such as poor management, construction method change, design/scope problems, uncontrollable objective problems, impediment problems, lack of commitment among parties and lack of experience and competence of parties should be given special attention to improve the SP.

Originality/value

The results of the study fill the gap in knowledge by examining the mutual influence of the VOs, the CDs, the PP and the SP. Discovering the mutual influence will assist managers in improving the PP and the SP.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 December 2022

Fawaz Alshihre, Ezekiel Chinyio, Chinny Nzekwe-Excel and Emmanuel I. Daniel

The study explored the disparity between construction clients and contractors on what constitutes “client satisfaction”. Such disparity is important because it can lead to…

Abstract

Purpose

The study explored the disparity between construction clients and contractors on what constitutes “client satisfaction”. Such disparity is important because it can lead to different conclusions and thus disagreement on the assessment of project success.

Design/methodology/approach

The philosophical stance was interpretivism, thus the qualitative methodology was adopted. Employing purposive sampling, 30 interviews with clients and another 30 interviews with contractors were conducted in Saudi Arabia. The data obtained were evaluated by thematic analysis.

Findings

The results indicate differences in the consensus ad idem (meeting of the minds) between clients and contractors in terms of both their perceptions and prioritisation of the attributes that underpin client satisfaction. For example, some contractors thought that using advanced technologies was very important for client satisfaction, whereas some clients preferred the contractors to be honest with them.

Research limitations/implications

The data collection was limited to Saudi Arabia and only the views of clients and contractors were studied, thereby limiting the generalisability of the findings.

Practical implications

The identification of the differing priorities of clients and contractors on client satisfaction provides an informed basis to make more concerted efforts to satisfy clients and minimise disputes on projects in Saudi Arabia.

Originality/value

The study contrasted the views of clients and contractors simultaneously on the subject matter of client satisfaction in relation to project success, and analysed this through the lens of consensus ad idem. The key influences on clients' satisfaction in Saudi Arabia are also presented.

Details

Built Environment Project and Asset Management, vol. 13 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 11 April 2024

Handan Kunkcu, Kerim Koc and Asli Pelin Gurgun

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking…

Abstract

Purpose

Work–family conflict is one of the most challenging stressors for construction industry professionals to cope with emotional problems. This study aims to propose a model linking work–family conflict and high-quality relationships among project team members and explore mediating effects of life and job satisfactions.

Design/methodology/approach

A theoretical framework was established based on the spillover theory and social exchange theory. Data were obtained by a questionnaire survey conducted with 328 respondents working in construction projects. Structural equation modeling (SEM) was used to test interrelationships among work–family conflict, job satisfaction, life satisfaction and high-quality relationship.

Findings

The results indicate that work–family conflict is negatively associated with both job and life satisfactions of construction professionals. In addition, there were direct and positive relationships between satisfaction domains and high-quality relationship capacity. The findings further support that job satisfaction plays a mediating role between work–family conflict and high-quality relationship among construction professionals, while life satisfaction does not mediate the relationship.

Originality/value

The effects of interrole conflicts on the context of satisfaction have been investigated previously; however, there is a lack of knowledge regarding its influence on high-quality relationship among project team members. This study extends the body of knowledge on high-quality relationships among project team members to understand how conflict and satisfaction factors influence interpersonal relationships in construction project management.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2022

Ahmed Ali Khatatbeh

This study evaluates the implementation of ISO 9001 using total quality management on the engineering, procurement and construction phases in the Jordanian construction sector.

Abstract

Purpose

This study evaluates the implementation of ISO 9001 using total quality management on the engineering, procurement and construction phases in the Jordanian construction sector.

Design/methodology/approach

A quantitative design has been employed with a total of 132 project team members selected from 5 construction organizations working in Jordan. A close-ended questionnaire was used to gather data which was later evaluated using descriptive and inferential statistics.

Findings

The results show a significant role in project performance, customer satisfaction, project quality, cost-effectiveness, time effectiveness, shared cooperation and motivation of employees. It emphasizes the role of engineering in achieving the ISO 9001 standard. Quality standards in the construction project were also endorsed by 46.2% of participants, while 33.3% responded neutrally. The time effectiveness aspects of ISO 9001 endorsed by 38.5% participants 33.3% participants disagreed. Majority of the managers (61.5%) agreed that poor planning is a major barrier in the engineering phase (p-value, 0.011), followed by the incomplete design (56.4%) as the prime impeding factors linked to the decline of the quality in the construction sector.

Originality/value

With the integration of the ISO 9001 quality standard, project managers can improve the project quality and make it cost-effective. The successful adaptation of the ISO 9001 certification allows the company to not only market its product/service but also internally audit itself for the possible deficits in its work capacity.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Ruman Thapa, Niranjan Devkota, Krishna Dhakal, Vaibhav Puri, Surendra Mahato and Udaya Raj Paudel

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles…

50

Abstract

Purpose

Obtaining building permit certificate is an essential component of construction endeavors, but it can be cumbersome sometimes. The process is frequently beset with obstacles, including bureaucratic impediments, red-tapism, prolonged authorization protocols and insufficient inter-agency collaboration which result in project timeline extension, cost escalation and applicant dissatisfaction. Therefore, this study aims to examine customer satisfaction with the assessment of building construction permit certificates in Lalitpur, Nepal.

Design/methodology/approach

Following the notion of evaluation model theory, this study adopts an explanatory research design to determine the causal relationship between latent and observed variables. People who have recently completed the construction of their building and those people whose construction work is pending make up the population for the study. A total of 198 samples were collected by following the convenience sampling method from Lalitpur, Nepal. The primary data are collected by using the structured questionnaire with the interview process where the data are statistically evaluated using descriptive and inferential analysis using the KOBO toolbox, SPSS and AMOS. The connection between variables was examined using structural equation modeling (SEM).

Findings

Results indicate that the negligence of the employees, the attitude of the employees, the need for additional costs and the hiring of the agent are the most significant obstacles encountered by customers during the process of getting construction permit. Regarding the whole assessment system, the general population expresses displeasure. SEM results indicate that environment and quality are significantly related to customer satisfaction.

Originality/value

This paper's novelty lies in its Nepal-specific inquiry into the relationship between building permit acquisition procedures and customer contentment. The study provides a distinctive viewpoint on this context by combining evaluation model theory and SEM. The localized approach emphasizes the importance of customized strategies to improve customer satisfaction, adding to the current literature on the subject. The study's use of SEM as a quantitative analysis tool enhances its methodological rigor. This interdisciplinary research offers valuable insights for academics, practitioners and policymakers in Nepal and contributes to the wider field of construction and customer satisfaction.

Details

Journal of Economic and Administrative Sciences, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1026-4116

Keywords

Article
Publication date: 28 October 2022

Ding Wang, Jianyao Jia, Shan Jiang, Tianyi Liu and Guofeng Ma

Despite the documented benefits of voice behavior for projects, little is known about antecedents of voice behavior in the project context, especially construction projects…

Abstract

Purpose

Despite the documented benefits of voice behavior for projects, little is known about antecedents of voice behavior in the project context, especially construction projects. Against this background, adopting a multi-team system perspective, this study attempts to investigate antecedents of team voice behavior from a contextual view.

Design/methodology/approach

This study identifies and examines six factors that influence team voice behavior. Specifically, project urgency, project temporality, and project complexity are identified from the project nature perspective. Satisfaction, trust, and commitment are generated from the relationship quality approach. Then, data from completed construction projects in China was collected to verify the effectiveness of these factors. Besides, the partial least squares structural equation modeling (PLS-SEM) technique was used in this study.

Findings

All six factors are found to be significant predictors of promotive team voice behavior. For prohibitive team voice behavior, only project complexity and project commitment make significant effects. Further, the differential effects of these factors on two types of voice behavior are revealed.

Originality/value

This study contributes to the literature on voice behavior in the project context, especially construction projects consisting of multiple teams. Also, this research enriches our knowledge on antecedents of team voice behavior in construction projects and thus affords practical implications to foster voice behavior.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords