Junming Xu, Yanmin Jia and Dongwei Liang

Prefabricated pier technology has the advantages of quick construction time, relatively little traffic interference and relatively small environmental impact. However, its…

Abstract

Purpose

Prefabricated pier technology has the advantages of quick construction time, relatively little traffic interference and relatively small environmental impact. However, its applicability under earthquake conditions is not yet fully understood. The seismic performance and influence parameters of a prefabricated concrete pier connected by embedded grouting sleeve (GS) in a pile cap are investigated in this study.

Design/methodology/approach

Two prefabricated pier scale model specimens with different reinforcement anchorage lengths and two comparative cast-in-place (CIP) pier model specimens are designed and manufactured for a seismic simulation shaking table. With the continuous increase of input ground motion strength, the changes in basic dynamic characteristics, damage development, acceleration and displacement variation laws, and pier bottom strain responses are compared among the specimen. The finite element software ABAQUS is used to simulate the test pier.

Findings

The crack location of the two prefabricated pier specimens is almost the same as that of the CIP pier specimens; CIP pier specimens show more penetrated cracks than prefabricated pier specimens, as well as an earlier crack penetration time. The acceleration, displacement and strain response of the CIP pier specimens are more affected by earthquake activity than those of the prefabricated pier specimens. The acceleration, displacement and strain responses of the two prefabricated piers are nearly identical. The finite element results are in close agreement with the acceleration and displacement response data collected from the test, which verifies the feasibility of the finite element model established in ABAQUS.

Originality/value

A GS connection method is adopted for the prefabricated pier, and on the premise of meeting the minimum reinforcement anchorage length required by the code, this study explores the influences of different reinforcement anchorage lengths on the seismic performance of prefabricated piers in high-intensity areas. A shaking table loading test is used to simulate the real changes of the structure under the earthquake. This work may provide a valuable reference for the design and seismic performance analysis of prefabricated pier, particularly in terms of seismic stability.

Details

International Journal of Structural Integrity, vol. 13 no. 1
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 16 April 2024

Chaofan Wang, Yanmin Jia and Xue Zhao

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted…

Abstract

Purpose

Prefabricated columns connected by grouted sleeves are increasingly used in practical projects. However, seismic fragility analyses of such structures are rarely conducted. Seismic fragility analysis has an important role in seismic hazard evaluation. In this paper, the seismic fragility of sleeve connected prefabricated column is analyzed.

Design/methodology/approach

A model for predicting the seismic demand on sleeve connected prefabricated columns has been created by incorporating engineering demand parameters (EDP) and probabilities of seismic failure. The incremental dynamics analysis (IDA) curve clusters of this type of column were obtained using finite element analysis. The seismic fragility curve is obtained by regression of Exponential and Logical Function Model.

Findings

The IDA curve cluster gradually increased the dispersion after a peak ground acceleration (PGA) of 0.3 g was reached. For both columns, the relative displacement of the top of the column significantly changed after reaching 50 mm. The seismic fragility of the prefabricated column with the sleeve placed in the cap (SPCA) was inadequate.

Originality/value

The sleeve was placed in the column to overcome the seismic fragility of prefabricated columns effectively. In practical engineering, it is advisable to utilize these columns in regions susceptible to earthquakes and characterized by high seismic intensity levels in order to mitigate the risk of structural damage resulting from ground motion.

Details

International Journal of Structural Integrity, vol. 15 no. 3
Type: Research Article
ISSN: 1757-9864

Keywords

Book part
Publication date: 29 November 2019

Richard E. Killblane

Abstract

Details

Delivering Victory
Type: Book
ISBN: 978-1-78754-603-5

Book part
Publication date: 29 November 2019

Richard E. Killblane

Abstract

Details

Delivering Victory
Type: Book
ISBN: 978-1-78754-603-5

Article
Publication date: 9 November 2021

Shufeng Li, Di Zhao and Yating Zhou

Concrete-filled steel tube structures are widely used for their high bearing capacity, good plasticity, good fire resistance and optimal seismic performance. In order to give full…

Abstract

Purpose

Concrete-filled steel tube structures are widely used for their high bearing capacity, good plasticity, good fire resistance and optimal seismic performance. In order to give full play to the advantages of concrete-filled steel tube, this paper proposes a prefabricated concrete-filled steel tube frame joint.

Design/methodology/approach

The concrete-filled steel tube column and beam are connected by high-strength bolted end-plate, and the steel bars in the concrete beam are welded vertically with the end-plates through the enlarged pier head. In addition, the finite element software ABAQUS is used numerically to study the seismic performance of the structure.

Findings

The ductility coefficient of the joint is in 1.72–6.82, and greater than 2.26 as a whole. The equivalent viscous damping coefficient of the joint is 0.13–3.03, indicating that the structure has good energy dissipation capacity.

Originality/value

The structure is convenient for construction and overcomes the shortcomings of the previous on-site welding and on-site concrete pouring. The high-strength bolted end-plate connection can effectively transfer the load, and each component can give play to its material characteristics.

Details

International Journal of Structural Integrity, vol. 13 no. 2
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 30 October 2019

Wang Jiawei and Sun Quansheng

In order to reduce the impact of bridge construction on traffic under the bridge, the construction of bridges for some important traffic nodes usually adopts the swivel…

Abstract

Purpose

In order to reduce the impact of bridge construction on traffic under the bridge, the construction of bridges for some important traffic nodes usually adopts the swivel construction method. The spherical hinge is a rotating mechanism located between the bottom of the pier and the bridge cap, and is subjected to tremendous vertical pressure. According to the mechanical characteristics of the spherical hinges, this paper applies the ultra-high performance concrete (UHPC) material to the spherical hinge. The spherical hinge is subjected to a compression test to test its mechanical behavior. This paper aims to discuss this issue.

Design/methodology/approach

In order to test the mechanical behavior of the UHPC spherical hinge, multiple sets of 100 mm UHPC spherical hinge specimens were prefabricated. Through the universal testing machine to measure the compressive strength of specimens, draw the force-displacement curve to analyze the failure mechanism and establish the stress calculation formula of the spherical hinge at each point along the radial direction.

Findings

Through the test, the compressive strength of UHPC spherical hinge is obtained, and the influencing factors of UHPC spherical hinge strength are found: reducing water–cement ratio, increasing steel fiber content and length and changing steel fiber arrangement direction can effectively improve the compression strength of UHPC spherical hinge.

Originality/value

For the first time, UHPC materials were applied to the spherical hinge structure, the UHPC spherical hinge diameter is 1/3 of the diameter of the reinforced concrete spherical hinge, which is equivalent to the diameter of the steel spherical hinge. By applying the UHPC spherical hinge, the manufacturing cost is reduced, the process is simple, and the construction difficulty is reduced.

Details

International Journal of Structural Integrity, vol. 11 no. 2
Type: Research Article
ISSN: 1757-9864

Keywords

Article
Publication date: 27 September 2022

Yong Huang, Guangyou Song and Guochang Li

The purpose of this study is to explore the seismic damage mechanism of the Dayemaling Bridge during the Maduo earthquake and discuss the seismic damage characteristics of the…

Abstract

Purpose

The purpose of this study is to explore the seismic damage mechanism of the Dayemaling Bridge during the Maduo earthquake and discuss the seismic damage characteristics of the high-pier curved girder bridge.

Design/methodology/approach

In this study, the numerical simulation method is used to analyze the seismic response using synthetic near-field ground motion records.

Findings

The near-field ground motion of the Maduo earthquake has an obvious directional effect, it is more likely to cause bridge seismic damage. Considering the longitudinal slope of the bridge and adopting the continuous girder bridge form, the beam end displacement of the curved bridge can be effectively reduced, and the collision force of the block and the bending moment of the pier bottom are reduced, so the curved bridge with longitudinal slope is adopted.

Originality/value

Combined with the seismic damage phenomenon of bridges in real earthquakes, the seismic damage mechanism and vulnerability characteristics of high-pier curved girder bridges are discussed by the numerical simulation method, which provides technical support for the application of such bridges in high seismic intensity areas.

Details

Multidiscipline Modeling in Materials and Structures, vol. 18 no. 6
Type: Research Article
ISSN: 1573-6105

Keywords

Article
Publication date: 14 July 2020

Shufeng Li, Le Deng and Zhao Di

The purpose of this study is to put forward a high-strength bolt end-plate connection of prefabricated concrete beam-column joint and carry out the pseudo-static test.

Abstract

Purpose

The purpose of this study is to put forward a high-strength bolt end-plate connection of prefabricated concrete beam-column joint and carry out the pseudo-static test.

Design/methodology/approach

ABAQUS finite element software is used to study the fire resistance performance of high-strength bolt end-plate prefabricated joint. This mainly considers the influence of axial compression ratio, screw preload, end-plate thickness and steel hoop thickness.

Findings

The results show that the thickness of end-plate and steel hoop has a certain effect on the fire resistance. The change of screw preload has little effect on the fire resistance limit. Compared with the cast-in-place concrete beam-column joint, the deformation trend of column-beam end of the fabricated joint is basically the same as that of cast-in-place joint.

Originality/value

To study the mechanical performance of this kind of joint more comprehensively, the finite element software is used to study the prefabricated concrete beam-column joint with end-plates, and the effects of axial compression ratio, screw preload, end-plate thickness and steel hoop thickness on the fire resistance of joints are mainly considered.

Details

Journal of Structural Fire Engineering, vol. 11 no. 4
Type: Research Article
ISSN: 2040-2317

Keywords

Article
Publication date: 29 October 2020

Ting Luo, Xiaolong Xue, Yongtao Tan, Yuna Wang and Yuanxin Zhang

This paper aimed to introduce a systematic body of knowledge via a scientometric review, guiding the sustainable transition from conventional construction to prefabricated

1608

Abstract

Purpose

This paper aimed to introduce a systematic body of knowledge via a scientometric review, guiding the sustainable transition from conventional construction to prefabricated construction. The construction industry currently faces a challenge to balance sustainable development and the construction of new buildings. In this context, one of the most recent debates is prefabricated construction. As an emerging construction approach, although existing knowledge makes contributions to the implementation of prefabricated construction, there is a lack of a comprehensive and in-depth overview of the critical knowledge themes and gaps.

Design/methodology/approach

This study uses the scientometric analysis to review the state-of-the-art knowledge of prefabricated construction. It retrieved data from the Web of Science core collection database. CiteSpace software was used to conduct the analysis and visualization; three analysis methods identify the knowledge hotspots, knowledge domains and knowledge topics. Finally, according to integrating the hidden connections among results, a body of knowledge for prefabricated construction application can be inferred.

Findings

The results show that 120 knowledge hotspots, five critical knowledge domains and five prominent knowledge topics are vital for promoting implementation of prefabricated construction. Based on the afore analysis, a body of knowledge for prefabricated construction that can systematically cover a broad knowledge of prefabricated construction-related research and activities are integrated and proposed in this paper.

Originality/value

Body of knowledge systematically covers a broad knowledge of prefabricated construction applications and is vital to guide researchers and practitioners to conduct related research and activities, thereby promoting the sustainable transition to prefabricated construction implementation.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 July 2022

Sushilawati Ismail, Carol K.H. Hon, Philip Crowther, Martin Skitmore and Fiona Lamari

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been…

Abstract

Purpose

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been used for commercial building projects, its application to sustainable infrastructure development has been limited to date. This study aims to examine the drivers and challenges involved.

Design/methodology/approach

A preliminary conceptual framework was initially developed based on a systematic literature review. Semi-structured interviews involving 20 participants were undertaken to gain insightful thoughts from the construction practitioners to discover the perception towards IBS application in the construction industry, the applicability of IBS, particularly in infrastructure projects, the strategies of IBS delivery and the sustainable potential of its application. A two-round Delphi study was conducted with 15 experienced and knowledgeable panellists to further identify, verify and prioritise factors developed from the literature review and interview findings. Then, the results were synthesised and triangulated to demonstrate a holistic insight.

Findings

The results show the main drivers to be better productivity, quality, environmental, safety and health, constructability design and cost, policy and requirements, with the main challenges being project planning and cost-related issues, inexperience and industry capacity.

Originality/value

The study’s main contribution is in systematically determining the practical implications involved in applying the IBS to sustainable infrastructure developments in Malaysia and other similar developing countries.