Article
Publication date: 8 April 2024

Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…

Abstract

Purpose

Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.

Design/methodology/approach

The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.

Findings

Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.

Originality/value

The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 December 2023

Tippatrai Saelawong, Torplus Yomnak, Thanee Chaiwat, Siwat Poopunpanich and Charoen Sutuktis

This study evaluates the effect of transparency measures on public procurement efficiency, focusing on Thailand’s Infrastructure Transparency Initiative (CoST). This study aims to…

Abstract

Purpose

This study evaluates the effect of transparency measures on public procurement efficiency, focusing on Thailand’s Infrastructure Transparency Initiative (CoST). This study aims to understand its impact on the country’s public infrastructure procurement practices.

Design/methodology/approach

This paper analyses Thailand’s government construction procurement data, focusing on budgetary savings and CoST process participation. Budgetary savings are this study dependent variable, while the main intervention variable is the adoption of the CoST data disclosure standard. This study uses multiple linear regression, fixed-effects model and propensity score matching with the logit model for a comprehensive analysis.

Findings

This study shows that using the CoST data disclosure leads to notable budget savings in Thai public construction procurement. With CoST’s introduction, the savings rose by Baht 9.6m, and even with added controls, the savings remained significant at around Baht 3.3m. The savings consistently stay near 5% across different models. The propensity score matching method confirms these results, consistent with factors such as open bidding and agency categorisation.

Research limitations/implications

This study might not capture all benefits, especially non-financial ones. Thailand’s unique context and potential biases in data sources also need consideration.

Practical implications

CoST evidence backs Thailand’s procurement transparency. This study recommends broadening CoST, streamlining online platforms and promoting digital public engagement. Training stakeholders and partnering with state-owned enterprises and local agencies is vital to align with CoST and mitigate risks.

Originality/value

This study shows a clear link between transparency from information disclosure and budget efficiency in public procurement, using data from Thailand. It highlights the potential of transparency measures in developing countries.

Details

Journal of Financial Crime, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1359-0790

Keywords

Article
Publication date: 22 June 2023

Argaw Gurmu and Mani Pourdadash Miri

Several factors influence the costs of buildings. Thus, identifying the cost significant factors can assist to improve the accuracy of project cost forecasts during the planning…

Abstract

Purpose

Several factors influence the costs of buildings. Thus, identifying the cost significant factors can assist to improve the accuracy of project cost forecasts during the planning phase. This paper aims to identify the cost significant parameters and explore the potential for improving the accuracy of cost forecasts for buildings using machine learning techniques and large data sets.

Design/methodology/approach

The Australian State of Victoria Building Authority data sets, which comprise various parameters such as cost of the buildings, materials used, gross floor areas (GFA) and type of buildings, have been used. Five different machine learning regression models, such as decision tree, linear regression, random forest, gradient boosting and k-nearest neighbor were used.

Findings

The findings of the study showed that among the chosen models, linear regression provided the worst outcome (r2 = 0.38) while decision tree (r2 = 0.66) and gradient boosting (r2 = 0.62) provided the best outcome. Among the analyzed features, the class of buildings explained about 34% of the variations, followed by GFA and walls, which both accounted for 26% of the variations.

Originality/value

The output of this research can provide important information regarding the factors that have major impacts on the costs of buildings in the Australian construction industry. The study revealed that the cost of buildings is highly influenced by their classes.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 29 May 2023

Peipei Wang, Kun Wang, Yunhan Huang and Peter Fenn

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly…

Abstract

Purpose

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.

Design/methodology/approach

A preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naïve Bayes classifier (NBC) and Bayesian belief networks (BBNs).

Findings

The model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.

Originality/value

The identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 September 2023

Ruth Ben-Yashar and Miriam Krausz

This study aims to develop a theoretical model that uses the decision-making theory in a financial intermediation setting to provide insights into the differences between the…

Abstract

Purpose

This study aims to develop a theoretical model that uses the decision-making theory in a financial intermediation setting to provide insights into the differences between the outcomes of the decision-making process for a bank and for a peer-to-peer (p2p) lending platform to explain the role of p2p lending versus bank lending in the credit market.

Design/methodology/approach

This study develops a novel approach to explaining the differences between p2p lending and bank lending by using the decision-making theory. In particular, it analyzes the likelihood of a risky borrower being able to obtain a loan from a p2p lending platform versus the likelihood of being able to obtain a loan from a bank. The results contribute a theoretical understanding of factors that can determine the role of p2p lending platforms versus that of banks in the credit market, with implications for recovery from an economic crisis.

Findings

p2p lending platforms have the potential for contributing to economic recovery when they are subject to less regulations and are able to offer a faster and less costly lending process than do banks and when they are used by a large number of lenders. However, the potential role of p2p lending platforms in recovery might be reduced when banks have access to anticyclical measures that reduce banks’ capital requirements or provide them with low-cost funds.

Originality/value

This study provides a novel approach to explaining the differences between p2p lending and bank lending by using the decision-making theory. The results contribute a theoretical understanding of factors that can determine the role of p2p lending platforms versus that of banks in the credit market.

Details

Studies in Economics and Finance, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1086-7376

Keywords

Article
Publication date: 3 November 2023

Jhih-Hua Jhang-Li and I. Robert Chiang

The purpose of this paper is to investigate both the impact of different reward types and the adoption of knowledge-sharing practice on a crowdsourcing-based open innovation…

Abstract

Purpose

The purpose of this paper is to investigate both the impact of different reward types and the adoption of knowledge-sharing practice on a crowdsourcing-based open innovation contest. Despite the benefit of knowledge sharing, contestants could struggle to find a balance between knowledge sharing and knowledge protection in open innovation.

Design/methodology/approach

The authors' approach follows a stylised contest model in a game-theoretical setting in which contestants first decide on their efforts and then the contest sponsor chooses the winner. Moreover, the outcome of an open innovation contest is delineated as either intermediate goods that require further refinement and risk-taking versus a market-ready end product for the contest sponsor. The authors also investigate how knowledge sharing among contestants would be influenced by reward types such as fixed-monetary prizes vs performance-contingent awards.

Findings

The contest sponsor will lower the prize level after adopting knowledge sharing. Therefore, the total effort will decline regardless of the reward type. Moreover, the choice of reward types depends on the contest sponsor's characteristics because the performance-contingent award is suitable for a large market size but the fixed-monetary prize can more efficiently raise the quantity of contestant inputs.

Originality/value

Prior studies have tested the connection between contest performance and knowledge sharing in crowdsourcing-based contests; however, there is not an integrated framework to best design the operation of a contest when considering different reward types and knowledge-sharing practices.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 22 September 2023

Chengkuan Zeng, Shiming Chen and Chongjun Yan

This study addresses the production optimization of a cellular manufacturing system (CMS) in magnetic production enterprises. Magnetic products and raw materials are more critical…

Abstract

Purpose

This study addresses the production optimization of a cellular manufacturing system (CMS) in magnetic production enterprises. Magnetic products and raw materials are more critical to transport than general products because the attraction or repulsion between magnetic poles can easily cause traffic jams. This study needs to address a method to promote the scheduling efficiency of the problem.

Design/methodology/approach

To address this problem, this study formulated a mixed-integer linear programming (MILP) model to describe the problem and proposed an auction and negotiation-based approach with a local search to solve it. Auction- and negotiation-based approaches can obtain feasible and high-quality solutions. A local search operator was proposed to optimize the feasible solutions using an improved conjunctive graph model.

Findings

Verification tests were performed on a series of numerical examples. The results demonstrated that the proposed auction and negotiation-based approach with a local search operator is better than existing solution methods for the problem identified. Statistical analysis of the experiment results using the Statistical Package for the Social Sciences (SPSS) software demonstrated that the proposed approach is efficient, stable and suitable for solving large-scale numerical instances.

Originality/value

An improved auction and negotiation-based approach was proposed; The conjunctive graph model was also improved to describe the problem of CMS with traffic jam constraint and build the local search operator; The authors’ proposed approach can get better solution than the existing algorithms by testing benchmark instances and real-world instances from enterprises.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 13 November 2023

Khaled Hesham Hyari and Mujahed Thneibat

Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims…

Abstract

Purpose

Skewed pricing is a typical tactic used by tenderers in unit price projects to gain additional advantages at the expense of the owner or other competing tenderers. This paper aims to describe the development of a model for detecting skewed pricing in competitive tendering for unit price contracts.

Design/methodology/approach

The model evaluates how much the offered unit rates for work items deviate from the reasonable rate identified from the item’s submitted unit rates. Item rate deviations are integrated into a total deviation score for each submitted tender based on the relative weight of the work item to the total project amount. The model allows for assigning higher weights to work items that are more prone to skewed pricing, such as those that are performed early and those that are expected to experience quantity fluctuations.

Findings

The paper presents a detection model that uses only the submitted prices of the competing tenderers to perform the needed calculations, which reduces subjectivity in identifying skewed tenders. Two examples are given to demonstrate how the model may be used to detect skewed tenders.

Originality/value

The model supports tendering officials in the challenging task of identifying skewed tenders, which is required by rules and regulations governing public procurement. The model’s ease of use is expected to make it more widely used as a decision-support tool during the tender evaluation stage of real-world projects.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 8 March 2024

Henrik Gislason, Jørgen Hvid, Steffen Gøth, Per Rønne-Nielsen and Christian Hallum

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to…

Abstract

Purpose

An increasing number of Danish municipalities wish to minimize tax avoidance due to profit shifting in their public procurement. To facilitate this effort, this study aims to develop a firm-level indicator to assess the potential risk of profit shifting (PS-risk) from Danish subsidiaries of multinational corporations to subsidiaries in low-tax jurisdictions.

Design/methodology/approach

Drawing from previous research, PS-risk is assumed to depend on the maximum difference in the effective corporate tax rate between the Danish subsidiary and other subsidiaries under the global ultimate owner, in conjunction with the tax regulations relevant to profit shifting. The top 400 contractors in Danish municipalities from 2017 to 2019 are identified and their relative PS-risk is estimated by combining information about corporate ownership structure with country-specific information on corporate tax rates, tax regulations and profit shifting from three independent data sets.

Findings

The PS-risk estimates are highly significantly positively correlated across the data sets and show that 17%–23% of the total procurement sum of the Danish municipalities has been spent on contracts with corporations having a medium to high PS-risk. On average, PS-risk is highest for large non-Scandinavian multinational contractors in sectors such as construction, health and information processing.

Social implications

Danish public procurers may use the indicator to screen potential suppliers and, if procurement regulations permit, to ensure high-PS-risk bidders document their tax practices.

Originality/value

The PS-risk indicator is novel, and to the best of the authors’ knowledge, the analysis provides the first estimate of PS-risk in Danish public procurement.

Details

Journal of Public Procurement, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1535-0118

Keywords

Article
Publication date: 19 February 2024

Ozan Okudan, Gökhan Demirdöğen and Zeynep Işık

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also…

Abstract

Purpose

The purpose of this study is to develop a decision-support framework that can be used by decision-makers to suspend public infrastructure projects. Additionally, the study also investigates how to select the most convenient infrastructure project for suspension.

Design/methodology/approach

The proposed framework includes an extensive set of factors and a novel comparison mechanism that can reveal the most convenient infrastructure project to be suspended. A comprehensible literature review and focus group discussion (FGD) sessions were conducted to identify factors that should be considered for suspension. Then, the neutrosophic analytic hierarchy process (N-AHP) method was used to determine the relative importance of the factors. Finally, the proposed comparison mechanism was demonstrated through a hypothetical case study and Technique for order of preference by similarity to ideal solution (TOPSIS) analysis.

Findings

Results showed that suspension decisions cannot be made merely based on “financial” factors. Instead, the other aspects, namely “Technical and managerial” and “Social and Environmental”, should also be taken into consideration. Second, factors related to the initial investment, cost of refinancing, cash flow, permits and approvals, insufficiency of bidders, degradation of the components, reputation, impact on stakeholders and criticality of the infrastructure were particularly elaborated as the most significant, needing the utmost attention of the decision-makers. Lastly, the results demonstrated that the proposed comparison mechanism has considerable potential to identify the most convenient infrastructure project for suspension.

Originality/value

Public infrastructure projects are often under pressure due to the inflationary state and economic stagnation of countries after major crises. The suspension decision for infrastructure projects necessitates comprehensible assessments to consider all consequences. Studies have widely investigated the contractual and legal aspects of project suspension in light of existing literature. However, little effort has been devoted to identifying the factors that decision-makers should consider before suspending a particular infrastructure project. Furthermore, existing literature does not investigate how to select the most convenient infrastructure project for suspension either. Thus, by developing a specific suspension framework for infrastructure projects by considering various factors, this study is the earliest attempt to examine the contract suspension mechanism of public infrastructure projects. In this respect, the study significantly contributes to the theory of contract management domain and has important managerial implications.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords