Search results

1 – 10 of over 2000
Article
Publication date: 3 July 2024

Raja Nurul Waheeda Raja Zilan, Adi Irfan Che-Ani and Siti Rashidah Hanum Abd Wahab

This paper aims to review the elements of facilities condition index (FCI) as one of the most widely used metrics for describing the physical condition of facilities and as a…

Abstract

Purpose

This paper aims to review the elements of facilities condition index (FCI) as one of the most widely used metrics for describing the physical condition of facilities and as a measure of financial indicator related to maintenance activity. This research will benefit future studies that focus on implementation of FCI and encourage the best practice when assessing the physical condition to evaluate the performance of facilities as well as to plan for maintenance action to be taken and financial implication involved based on the findings from FCI.

Design/methodology/approach

A total of 33 studies from 2012 to 2022 were identified and extracted from four academic databased, named Scopus, Google Scholar, Web of Science and Mendeley. These published studies were selected because it matches with the inclusion requirements for research question, “What are the elements of facilities condition index discussed in the literature from 2012 to 2022?”. To answer the research question, the studies in ATLAS.ti were grouped into five major themes based on the codes and categories found.

Findings

This paper presents the findings of a thematic analysis of the current literature discussed about FCI. A total of 33 studies from 2012 to 2022 were identified and extracted from four academic databased, named Scopus, Google Scholar, Web of Science and Mendeley. A themed review was conducted, and five themes were identified as elements of FCI, which are named as follows: “Condition Assessment”, “Deferred Maintenance”, “Facilities Performance”, “Financial and Fund Allocation” and “Decision Making”.

Originality/value

This paper fulfils the fundamental elements on current FCI practices as well as intended to highlight existing practices that are essential to evaluate facilities performance and planning for maintenance strategies.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 17 September 2024

Mahadev Laxman Naik and Milind Shrikant Kirkire

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance…

Abstract

Purpose

Asset maintenance in manufacturing industries is a critical issue as organizations are highly sensitive towards maximizing asset uptime. In the advent of Industry 4.0, maintenance is increasingly becoming technology driven and is being termed as Maintenance 4.0. Several barriers impede the implementation of Maintenance 4.0. This article aims at - exploring the barriers to implementation of Maintenance 4.0 in manufacturing industries, categorizing them, analysing them to prioritize and suggesting the digital technologies to overcome them.

Design/methodology/approach

Twenty barriers to the implementation of Maintenance 4.0 were identified through literature survey and discussion with the industry experts. The identified barriers were divided into five categories based on their source of occurrence and prioritized using fuzzy-technique for order preference by similarity to ideal solution (TOPSIS), sensitivity analysis was carried out to check the robustness of the solution.

Findings

“Data security issues” has been ranked as the most influencing barrier towards the implementation of Maintenance 4.0, whereas “lack of skilled engineers and data scientists” is the least influencing barrier that impacts the implementation of Maintenance 4.0 in the manufacwturing industries.

Practical implications

The outcomes of this research will help manufacturing industries, maintenance engineers/managers, policymakers, and industry professionals for detailed understanding of barriers and identify easy pickings while implementing Maintenance 4.0.

Originality/value

Manufacturing industries are witnessing a paradigm shift due to digitization and maintenance 4.0 forms the cornerstone. Little research has been carried in Maintenance 4.0 and its implementation; this article will help in bridging the gap. The prioritization of the barriers and digital course of actions to overcome those is a unique contribution of this article.

Details

Benchmarking: An International Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 18 September 2024

Felipe Terra Mohad, Leonardo de Carvalho Gomes, Guilherme da Luz Tortorella and Fernando Henrique Lermen

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not…

Abstract

Purpose

Total productive maintenance consists of strategies and procedures that aim to guarantee the entire functioning of machines in a production process so that production is not interrupted and no loss of quality in the final product occurs. Planned maintenance is one of the eight pillars of total productive maintenance, a set of tools considered essential to ensure equipment reliability and availability, reduce unplanned stoppage and increase productivity. This study aims to analyze the influence of statistical reliability on the performance of such a pillar.

Design/methodology/approach

In this study, we utilized a multi-method approach to rigorously examine the impact of statistical reliability on the planned maintenance pillar within total productive maintenance. Our methodology combined a detailed statistical analysis of maintenance data with advanced reliability modeling, specifically employing Weibull distribution to analyze failure patterns. Additionally, we integrated qualitative insights gathered through semi-structured interviews with the maintenance team, enhancing the depth of our analysis. The case study, conducted in a fertilizer granulation plant, focused on a critical failure in the granulator pillow block bearing, providing a comprehensive perspective on the practical application of statistical reliability within total productive maintenance; and not presupposing statistical reliability is the solution over more effective methods for the case.

Findings

Our findings reveal that the integration of statistical reliability within the planned maintenance pillar significantly enhances predictive maintenance capabilities, leading to more accurate forecasts of equipment failure modes. The Weibull analysis of the granulator pillow block bearing indicated a mean time between failures of 191.3 days, providing support for optimizing maintenance schedules. Moreover, the qualitative insights from the maintenance team highlighted the operational benefits of our approach, such as improved resource allocation and the need for specialized training. These results demonstrate the practical impact of statistical reliability in preventing unplanned downtimes and informing strategic decisions in maintenance planning, thereby emphasizing the importance of your work in the field.

Originality/value

In terms of the originality and practicality of this study, we emphasize the significant findings that underscore the positive influence of using statistical reliability in conjunction with the planned maintenance pillar. This approach can be instrumental in designing and enhancing component preventive maintenance plans. Furthermore, it can effectively manage equipment failure modes and monitor their useful life, providing valuable insights for professionals in total productive maintenance.

Details

International Journal of Quality & Reliability Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 18 October 2023

Temidayo O. Osunsanmi, Chigozie Collins Okafor and Clinton Ohis Aigbavboa

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment…

Abstract

Purpose

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment. Unfortunately, its actualization for stakeholders in the built environment in the fourth industrial revolution (4IR) era remains a challenge. To reduce the challenge, this study aims at conducting a bibliometric analysis to unearth the critical success factors supporting SM implementation. The future direction and practice of SM in the construction industry were also explored.

Design/methodology/approach

A bibliometric approach was adopted for reviewing articles extracted from the Scopus database. Keywords such as (“smart maintenance“) OR (“intelligent maintenance”) OR (“technological maintenance”) OR (“automated maintenance”) OR (“computerized maintenance”) were used to extract articles from the Scopus database. The studies were restricted between 2006 and 2021 to capture the 4IR era. The initial extracted papers were 1,048; however, 288 papers were selected and analysed using VOSviewer software.

Findings

The findings revealed that the critical success factors supporting the implementation of SM in the 4IR era are collaboration, digital twin design, energy management system and decentralized data management system. Regarding the future practice of SM in the 4IR era, it was also revealed that SM is possible to evolve into maintenance 4.0. This will support the autonomous maintenance of infrastructures in the built environment.

Research limitations/implications

The use of a single database contributed to the limitation of the findings from this study.

Practical implications

Despite the limitations, the findings of this study contributed to practice and research by providing stakeholders in the built environment with the direction of SM practice.

Originality/value

Stakeholders in the built environment have clamoured to implement SM in the 4IR era. This study provided the critical success factors for adopting SM, guaranteeing the 4IR era. It also provides the research trends and direction of SM practice.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 15 August 2024

Meiqi Lu and Maxwell Fordjour Antwi-Afari

Recent emerging information technologies like digital twin (DT) provide new concepts and transform information management processes in the architecture, engineering and…

Abstract

Purpose

Recent emerging information technologies like digital twin (DT) provide new concepts and transform information management processes in the architecture, engineering and construction (AEC) industry. Although numerous articles are pertinent to DT applications, existing research areas and potential future directions related to the state-of-the-art DT in project operation and maintenance (O&M) are yet to be studied. Therefore, this paper aims to review the state-of-the-art research on DT applications in project O&M.

Design/methodology/approach

The current review adopted four methodological steps, including literature search, literature selection, science mapping analysis and qualitative discussion to gain a deeper understanding of DT in project O&M. The impact and contribution of keywords and documents were examined from a total of 444 journal articles retrieved from the Scopus database.

Findings

Five mainstream research topics were identified, including (1) DT-based artificial intelligence technology for project O&M, (2) DT-enabled smart city and sustainability, (3) DT applications for project asset management, (4) Blockchain-integrated DT for project O&M and (5) DT for advanced project management. Subsequently, research gaps and future research directions were proposed.

Originality/value

This study intends to raise awareness of future research by summarizing the current DT development phases and their impact on DT implementation in project O&M among researchers and practitioners.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 April 2024

Ramads Thekkoote

This paper uses the complex proportionality assessment (COPRAS) method to examine the driving factors of Industry 4.0 (I4) technologies for lean implementation in small and…

Abstract

Purpose

This paper uses the complex proportionality assessment (COPRAS) method to examine the driving factors of Industry 4.0 (I4) technologies for lean implementation in small and medium-sized enterprises (SMEs).

Design/methodology/approach

Adopting I4 technology is imperative for SMEs seeking to maintain competitiveness within the manufacturing sector. A thorough understanding of the driving factors involved is required to support the implementation of I4. For this objective, the multi-criteria decision-making (MCDM) tool COPRAS was used to efficiently analyze and rank these driving elements based on their importance. These factors can help small and medium-sized firms (SMEs) prioritize their efforts and investments in I4 technologies for lean implementation.

Findings

This study evaluates and prioritizes the nine I4 factors according to the perceptions of SMEs. The ranking offers significant insights into the factors SMEs consider more accessible and effective when adopting I4 technologies.

Originality/value

The author's original contribution is to examine I4 driving factors for lean implementation in SMEs using COPRAS.

Details

The TQM Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 15 June 2023

Amna Salman and Wasiq Ahmad

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only…

Abstract

Purpose

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only 5–10%. Therefore, enhancing and optimizing the O&M of a facility is a crucial issue. In addition, with the increasing complexities in a building's operating systems, more technologically advanced solutions are required for proactively maintaining a facility. Thereby, a tool is needed which can optimize and reduce the cost of facility maintenance. One of the solutions is Augmented or Mixed Reality (AR/MR) technologies which can reduce repair time, training time and streamline inspections. Therefore, the purpose of this study is to establish contextual knowledge of AR/MR application in facilities operation and maintenance and present an implementation framework through the analysis and classification of articles published between 2015 and 2022.

Design/methodology/approach

To effectively understand all AR/MR applications in facilities management (FM), a systematic literature review is performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) protocol was followed for searching and describing the search strategies. Keywords were identified through the concept mapping technique. The Scopus database and Google Scholar were employed to find relevant articles, books and conference papers. A thorough bibliometric analysis was conducted using VOS Viewer and subsequently, a thematic analysis was performed for the selected publications.

Findings

The use of AR/MR within facilities O&M could be categorized into five different application areas: (1) visualization; (2) maintenance; (3) indoor localization and positioning; (4) information management and (5) indoor environment. After a thematic analysis of the literature, it was found that maintenance and indoor localization were the most frequently used research application domains. The chronological evolution of AR/MR in FM is also presented along with the origin of publications, which showed that the technology is out of its infancy stage and is ready for implementation. However, literature showed many challenges hindering this goal, that is (1) reluctance of the organizational leadership to bear the cost of hardware and trainings for the employees, (2) Lack of BIM use in FM and (3) system lagging, crashing and unable to register the real environment. A preliminary framework is presented to overcome these challenges.

Originality/value

This study accommodates a variety of application domains within facilities O&M. The publications were systematically selected from the existing literature and then reviewed to exhibit various AR/MR applications to support FM. There have been no literature reviews that focus on AR and/or MR in the FM and this paper fills the gap by not only presenting its applications but also developing an implementation framework.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 5 January 2024

Caroline Silva Araújo, Emerson de Andrade Marques Ferreira and Dayana Bastos Costa

Tracking physical resources at the construction site can generate information to support effective decision-making and building production control. However, the methods for…

Abstract

Purpose

Tracking physical resources at the construction site can generate information to support effective decision-making and building production control. However, the methods for conventional tracking usually offer low reliability. This study aims to propose the integrated Smart Twins 4.0 to track and manage metallic formworks used in cast-in-place concrete wall systems using internet of things (IoT) (operationalized by radio frequency identification [RFID]) and building information modeling (BIM), focusing on increasing quality and productivity.

Design/methodology/approach

Design science research is the research approach, including an exploratory study to map the constructive system, the integrated system development, an on-site pilot implementation in a residential project and a performance evaluation based on acquired data and the perception of the project’s production team.

Findings

In all rounds of requests, Smart Twins 4.0 registered and presented the status from the formworks and the work progress of buildings in complete correspondence with the physical progress providing information to support decision-making during operation. Moreover, analyses of the system infrastructure and implementation details can drive researchers regarding future IoT and BIM implementation in real construction sites.

Originality/value

The primary contribution is the system proposal, centralized into a mobile app that contains a Web-based virtual model to receive data in real time during construction phases and solve a real problem. The paper describes Smart Twins 4.0 development and its requirements for tracking physical resources considering theoretical and practical previous research regarding RFID, IoT and BIM.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 June 2024

Erfan Anjomshoa

Nowadays, designing environmentally compatible buildings with acceptable performance in terms of cost, materials, and energy efficiency is considered crucial for developing…

Abstract

Purpose

Nowadays, designing environmentally compatible buildings with acceptable performance in terms of cost, materials, and energy efficiency is considered crucial for developing sustainable cities. This research aims to identify and rank the most influential factors in the application of Building Information Modeling (BIM) systems in the smartification of green and sustainable buildings.

Design/methodology/approach

The present research is applied and descriptive. In this study, we identified the most influential factors in the application of Building Information Modeling (BIM) systems through library studies and expert opinions. Data were collected using a questionnaire, and a combination of the one-sample t-test method with a 95% confidence level and the fuzzy VIKOR method was employed for analysis.

Findings

The results show that the most influential factors in the application of Building Information Modeling (BIM) systems in the Smartification of green and sustainable buildings, in order, are: “Energy saving and consumption reduction,” “Increased productivity and efficiency,” “Life-cycle assessment (LCA),” “Eco-friendly design,” “Integration with IoT and other technologies.”

Originality/value

In this study, while addressing the intersection of BIM technology, green building principles, and smart building objectives to optimize the performance of buildings during their life cycle, the most influential factors in the use of this system were ranked based on the criteria of “impact level,” “importance level,” and “availability of necessary tools” for implementation in Kerman. Moreover, solutions for more effectively utilizing this system in the smartification of green and intelligent buildings were proposed.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 January 2024

Mohamed Marzouk and Mohamed Zaher

Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing…

111

Abstract

Purpose

Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing complexity of different systems, facility managers may suffer from a lack of information. The purpose of this paper is to propose a new facility management approach that links segmented assets to the vital data required for managing facilities.

Design/methodology/approach

Automatic point cloud segmentation is one of the most crucial processes required for modelling building facilities. In this research, laser scanning is used for point cloud acquisition. The research utilises region growing algorithm, colour-based region-growing algorithm and Euclidean cluster algorithm.

Findings

A case study is worked out to test the accuracy of the considered point cloud segmentation algorithms utilising metrics precision, recall and F-score. The results indicate that Euclidean cluster extraction and region growing algorithm revealed high accuracy for segmentation.

Originality/value

The research presents a comparative approach for selecting the most appropriate segmentation approach required for accurate modelling. As such, the segmented assets can be linked easily with the data required for facility management.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of over 2000