Article
Publication date: 19 September 2024

Diana Ominde, Edward Godfrey Ochieng and Tarila Zuofa

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research…

Abstract

Purpose

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research question guided our inquiry: what is the influence of project complexity and stakeholder integration on the performance of IT projects in Kenya?

Design/methodology/approach

To advance the current understanding of the effect of stakeholder integration and project complexity on IT projects, multiple regressions were used to predict how project complexity and stakeholder integration influence project performance. Both government-funded and privately funded IT projects from a developing country were examined.

Findings

The study found that any project’s complexity and stakeholder integration levels offer a distinctive contribution to its success. Theoretically, the study contributes to linkages between stakeholder integration and project complexity concerning IT project performance. Through the adoption of actionable research and theoretical elaboration, we have shown that the successful execution of IT projects is driven by the successful integration of stakeholders and monitoring the level of complexity at each phase of the project.

Originality/value

The findings of this study add to the burgeoning literature on the performance of IT projects and come with several managerial implications as well. It brings to the fore the concept of stakeholder integration as an essential element of project success. The findings suggest that the inclusion of stakeholder integration into corporate decisions, strategies and policies can be an asset to the production of sustainable competitive advantages needed during the implementation of IT projects in government entities and organisations. As shown in this study, all the above require a collaborative platform allowing for data sharing among diverse stakeholders to ameliorate distrust or lack of information.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 27 April 2022

Ewald Kuoribo, Peter Amoah, Ernest Kissi, David John Edwards, Jacob Anim Gyampo and Wellington Didibhuku Thwala

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work…

Abstract

Purpose

Prodigious teamwork is the basis for augmenting the level of productivity on construction projects. Globalisation of the construction market has meant that many practitioners work outside of their geographical spectrum; however, the multicultural dissimilarities of construction workforces within the project management team (and how these may impact upon project productivity performance) have been given scant academic attention. To bridge this knowledge gap, this paper aims to analyse the effects of a multicultural workforce on construction productivity.

Design/methodology/approach

The epistemological positioning of the research adopted mixed philosophies (consisting of both interpretivism and postpositivism) to undertake a deductive and cross-sectional survey to collate primary quantitative data collected via a closed-ended structured questionnaire. Census sampling and convenience sampling techniques were adopted to target Ghana’s construction workforce and their opinions of the phenomenon under investigation. Out of 96 questionnaires administered, 61 were retrieved. The data obtained were analysed by using mean score ranking, relative important index, one sample t-test and multiple regression. The reliability of the scale was checked by using Cronbach’s alpha coefficient.

Findings

From the t-test analysis, 11 variables sourced from extant literature, and the null hypothesis for the study was not rejected and all factors (except high cost of training and improper gender diversity management) were affirmed as negative effects of the multicultural workforce on construction productivity. Using multiple regression analysis, six of the independent variables were shown to impact upon productivity. The goodness of fit was verified by collinearity and residual analysis. The model’s validation revealed a relatively high predictive accuracy (R2 = 0. 589), implying that the results could be generalized. In culmination, these findings suggest that the predictors can be used to accurately predict the effects of multicultural workforce on construction productivity performance.

Practical implications

The findings indicate that multicultural workforce/teams have a substantial effect on overall construction productivity in the construction sector; consequently, stakeholders must address this issue to enhance productivity across the sector.

Originality/value

The current study significantly contributes to our understanding of how multicultural workers/teams affect construction productivity in the construction business perspective and how to respond to the negative menace.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1315

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 October 2023

Eduardo André Cândido Da Silva, Flávio Santino Bizarrias, Renato Penha, Luciano Ferreira da Silva and Cristiane Drebes Pedron

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study…

Abstract

Purpose

Despite the significant interest from researchers and practitioners, the literature on project value measurement from the perspective of the customer is non-existent. This study aims to address this gap by developing and validating a scale to measure project value through a customer lens called the customer perception of project value scale.

Design/methodology/approach

A list of items was initially generated based on 762 sample responses through a systematic review of the literature and with the participation of specialists. Exploratory and confirmatory factorial analyses and structural equation modelling were used to develop and validate the scale.

Findings

The authors formulated a four-dimension scale. The dimensions used to measure the second-order construct are customer centrality, process, delivery and cost-benefit. This was validated using a nomological structure.

Research limitations/implications

The non-consensual nature of what is value in projects restricts the results of this study to the context of a specific group of stakeholders only, that is, the consumers of the projects. The authors also see limitations in the absence of competing scales, which do not allow the comparison of the instrument with alternative measures.

Practical implications

This study allows project managers and other professionals to measure a project’s perceived value from the customer’s point of view and manage the improvement of this perception.

Originality/value

To the best of the authors’ knowledge, this is the first study to propose a scale to measure project value, which advances the literature on project management and value and contributes to academic knowledge and practice by measuring project value from the customer standpoint.

Details

European Business Review, vol. 36 no. 3
Type: Research Article
ISSN: 0955-534X

Keywords

Article
Publication date: 20 April 2022

Chigozie Collins Okafor, Ugochukwu Sydney Ani and Onuegbu Ugwu

Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible…

Abstract

Purpose

Recent studies on construction supply chain management (CSCM) evaluated its vulnerability and challenging factors, but studies that have identified and examined the possible corrective measures of CSCM are rare. This study sets out to bridge this gap by identifying and evaluating the most effective CSCM corrective measures that will benefit the global construction industry.

Design/methodology/approach

A methodology was designed to obtain the corrective measures of CSCM. Data were collected from 68 experts who served as research participants in this study, through a questionnaire survey and were analyzed statistically using the severity index analysis, Mann–Whitney test and factor analysis which includes KMO and Barlett's test, commonalities, total variance pattern matrix.

Findings

The findings of the study revealed that free exchange of information between parties from both suppliers and site/firm is the best CSCM corrective measures, according to the research participant's opinion using the severity index analysis. Further analysis revealed seven underlying factors of CSCM corrective measures.

Practical implications

The findings of this study have identified the most critical solutions to the lapses of CSCM. These will serve as adequate corrective measures to the challenges of CSCM and benefit the global construction industry.

Originality/value

This study contributed seven underlying factors of CSCM corrective measures which can be adopted as adequate corrective measures to the lapses of CSCM. The study further contributed to CSCM research theory.

Details

International Journal of Building Pathology and Adaptation, vol. 42 no. 4
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 20 February 2023

Eyad Aboseif and Awad S. Hanna

The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to…

Abstract

Purpose

The exact process of construction projects performance assessment and benchmarking still remains subjective relying on qualitative techniques, which does not allow stakeholders to address the issues and the drawbacks of their respective projects as effectively as possible for performance improvement purposes. Hence, this research aims to establish a unified project performance score (PPS) for assessing and comparing projects performance.

Design/methodology/approach

Data were collected from Construction Industry Institute (CII) members and through University of Wisconsin active research projects. Exploratory data analysis was done to investigate the calculated performance metrics and the collected data characteristics. Data were converted into six performance metrics which were used as the independent variables in creating the PPS model. Logistic regression model was developed to generate the unified PPS equation in order to explain the variables that significantly affect construction projects successful post-completion performance. The PPS model was then applied on the collected dataset to benchmark projects in terms of project delivery systems, compensation types and project types in order to showcase the PPS capabilities and possible applications.

Findings

The model revealed that construction cost and schedule growth are the most important metrics in assessing projects performance, while RFIs’ processing time and change orders per million dollars were the features with the least effect on the PPS value. The authors found that integrated project delivery (IPD) and target value (TV) projects outperformed all other project delivery and compensation types. While, industrial projects showed the worst performance, as compared to commercial or institutional projects.

Originality/value

The PPS model can be used to assess the performance of any pool of executed projects, and introducing a novel addition to the field of construction business analytics which is a supplementary tool to successful decision making and performance improvement. Additionally, the bidding selection system can be revolutionized from a cost-based to a performance based one using the PPS model to improve the outcomes of the buyout process.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Hilary Omatule Onubi

The impact of mankind on the environment and the usage of natural resources might be influenced by spirituality, through the consciousness of creating an improved moral sense…

Abstract

Purpose

The impact of mankind on the environment and the usage of natural resources might be influenced by spirituality, through the consciousness of creating an improved moral sense regarding the consequences of human activities and the necessity to alter these to achieve sustainable development. However, the spiritual element in the form of ecospirituality (ES) has not been sufficiently considered in pro-environmental studies as it relates to the influence of green training (GT) on voluntary workplace green behaviour (VWGB) in the construction sector. This study aims to determine the effect of GT on VWGB and the mediating effect of ES on the relationship between GT and VWGB on construction projects.

Design/methodology/approach

This study’s data were gathered through a questionnaire survey of construction site managers and project managers by adopting the probability sampling method. 249 appropriately completed questionnaires were returned. The data obtained were analysed by means of the partial least squares structural equation modelling technique (PLS-SEM).

Findings

The outcomes of the study show that GT has a significant positive impact on VWGB, while ES has a significant mediating effect on the relationship between GT and VWGB, both supporting the study’s hypotheses.

Practical implications

These findings point to the fact that the hitherto conflicting results reported in earlier studies on the GT–VWGB relationship can be attributed to the lack of consideration given to ES. Hence, special attention should be given to ES.

Originality/value

This research presents actions to enhance the transformation of GT into VWGB by giving due consideration to ES, which was not taken into account in previous studies.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 31 October 2023

Kofi Agyekum, Judith Amudjie, Hayford Pittri, Annabel Morkporkpor Ami Dompey and Edward Ayebeng Botchway

Circular economy (CE) is guided by principles, the key being the R-framework. All R-frameworks have a hierarchy. Although several studies have prioritized these principles, there…

Abstract

Purpose

Circular economy (CE) is guided by principles, the key being the R-framework. All R-frameworks have a hierarchy. Although several studies have prioritized these principles, there is still an urgent call for country-specific prioritization. This study prioritized circular economy (CE) principles among Ghana's built environment (BE) professionals.

Design/methodology/approach

An explanatory sequential mixed methods approach was adopted. Six principles of CE were identified through a review of related literature and incorporated into a questionnaire. In total, 162 questionnaire responses were received. The quantitative data were analyzed through descriptive and inferential analyses. The data were further validated via semi-structured interviews with eight interviewees of different professional backgrounds in the BE.

Findings

The findings revealed that BE professionals in Ghana highly perceived CE principles as important. The findings further revealed the order of prioritization of the CE principles as follows: (1) recycle, (2) reuse, (3) repair/remanufacture, (4) renewable energy usage, (5) redesign and (6) reduce. To further elaborate on these prioritized principles via the qualitative phase, the interviewees agreed to and confirmed the importance of the identified principles through their verbatim comments.

Originality/value

Although there is a growing interest in research regarding CE in the Ghanaian construction industry, its principles have yet to be prioritized and ranked by professionals in the Ghanaian construction industry. This study unearths why, in terms of prioritization of the CE principles, the construction industry in Ghana does not follow the well-known hierarchy (i.e. reduce, reuse and recycle) in the order of high to low level of circularity.

Details

Built Environment Project and Asset Management, vol. 14 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 3 January 2023

Simon Wyke, Søren Munch Lindhard and Jesper Kranker Larsen

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as…

Abstract

Purpose

Cost and time are two of the primary benchmarks in which construction projects are measured. A variety of factors, however, affect cost and time on construction projects, as identified in previous research. This has led to a need for better understanding how factors affecting cost and time overruns on public construction projects can be managed more efficiently. The purpose of this paper is to address these issues.

Design/methodology/approach

In this study 26 factors affecting cost and time overruns on construction projects were identified, through qualitative interviews with project managers from Danish governmental agencies and through a literature review. Through principal component analyses the 26 factors were subsequently narrowed down to four primary latent factors.

Findings

The identified four latent factors affecting cost and time overruns on public construction projects were lack of quality management, lack of project pre-planning, lack of user management and lack of project management.

Originality/value

Previous research has focussed on increasing knowledge by identifying and ranking factors affecting time and cost performance. This has led to the identification of an overwhelming number of factors to use for managing construction projects. The present research reduced the number of factors by clustering them into key latent factors responsible for most of the deviation in performance, narrowing the scope of construction cost and time management into a few tangible key focus areas. This supports and improves fast decision-making that is necessary in a changeable environment such as construction.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 31 July 2024

Aravindh Devandran, Felicita J. Davis and Michael Sammanasu Joseph

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of…

1100

Abstract

Purpose

This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of risk owing to cost overruns. These overruns frequently lead to delays, incomplete work or other related challenges. Building delays are a prevalent problem in the building sector of developing nations. These delays prolong the duration of projects and result in increased costs and conflicts among stakeholders. A conceptual model consisting of the factors causing the delays in heating, ventilation and air conditioning (HVAC) projects was developed and tested in this study.

Design/methodology/approach

A comprehensive data collection process was undertaken. A meticulously designed survey was distributed to a diverse cohort of 294 participants, including contractors and sub-contractors from Chennai, Tamil Nadu. The data was collected using stratified sampling, ensuring a representative sample. The data was then analysed using ordinary least squares multiple regression.

Findings

The findings of this study have significant implications for the construction industry. They indicate that factors related to sales, clients, design, procurement, finance and labour all contribute to delays in HVAC projects. Understanding these factors can help stakeholders in the industry to better manage and mitigate project delays.

Originality/value

This study is unique because it is a perceptual study of stakeholders. It provides valuable information for analysing and assessing project performance by identifying the primary causes of HVAC project delays. To the best of the authors’ knowledge, the study conducted on HVAC projects is the first of its kind and hence makes a pivotal contribution to the literature on construction projects. Additionally, the study will assist policymakers and consultants in taking necessary steps to minimize delays.

Details

Vilakshan - XIMB Journal of Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0973-1954

Keywords

1 – 10 of 60