1 – 10 of 11Souad Nassir, Imane Lebdaoui, Youssef Chetioui and Hind Lebdaoui
Despite the digitalization reforms attempting to enhance public service quality, paper-based tendering is still widely used in a number of developing countries (i.e. Morocco)…
Abstract
Purpose
Despite the digitalization reforms attempting to enhance public service quality, paper-based tendering is still widely used in a number of developing countries (i.e. Morocco). This has led to many issues including waste of time, higher costs as well as labor-intensive issues. E-tendering has been widely recommended as a key resolution. Still, both scholars and practitioners raised concerns related the readiness of small and medium enterprises (SMEs) to this digitalization process. The current research aims to investigate the key drivers of SMEs intention to adopt electronic tendering in the context of an emerging African market (i.e. Morocco). Specifically, the authors focus on SMEs contributing to the public procurement process and registered in the online portal recently created by the Moroccan government.
Design/methodology/approach
To achieve this goal, the authors proposed a conceptual model combining the unified theory of acceptance and use of technology (UTAUT) and technology acceptance model (TAM). Based on data collected from suppliers participating in Moroccan public tenders, the authors empirically tested the conceptual model using a partial least squares (PLS) estimation.
Findings
Facilitating conditions and social influence had a positive impact on SMEs intention to adopt electronic tendering. The study’s findings also convey a negative impact of effort expectancy on SMEs intent to adopt e-tendering. Unexpectedly, perceived performance had no significant impact on the intention to adopt electronic bidding among Moroccan SMEs.
Originality/value
This research filled the gap in the literature with regards to SMEs e-Tendering readiness in emerging markets. With the recent digitalization reforms of public tendering in many developing economies (i.e. Morocco), the study findings can be used to improve not only government implementation of electronic bidding but also SMEs' user experience.
Details
Keywords
Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana
The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart…
Abstract
Purpose
The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart solution to streamline the housing adaptation process to prevent lengthy delays for disabled and elderly people.
Design/methodology/approach
The Adapt-ABLE approach is suggested based on a constructive research approach, where extensive theoretical development of the Adapt-ABLE concept is developed. It consists of four integrated platforms that undergo theoretical and analogical development and validations through applicable theories, a workshop, four brainstorming sessions and a focus group.
Findings
The proposed Adapt-ABLE approach utilises process optimisation techniques through an IT system for streamlining the process. The merits of the semi-automated system include the development of a preventive measure that allows measurement of suitability index of homes for the occupants, indicative assessment that shorten the application duration, procurement and contracting platform that utilises principles based on framework agreement and call-off contract, and a platform that standardised performance management for continuous improvement.
Originality/value
The Adapt-ABLE solution will cut the application journey of non-qualified applicants and suggest where help can be sought. The qualified applicants' application journey will also be shortened through an online indicative assessment regime and early online resources (means) testing. Overall, the proposed system reduces the waiting time, and timely delivery improves the applicant's quality of life by living independently. It will potentially save the NHS billions of pounds used to replace hips and residential care costs due to lengthy delays in the housing adaptations process.
Details
Keywords
Michael Nii Addy, Evans Teye Addo, Sulemana Fatoama Abdulai, Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa and Anita Odame Adade-Boateng
E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement…
Abstract
Purpose
E-procurement has the advantage of improving the overall performance of construction project delivery. The purose of this study is to uncover the factors influencing e-procurement acceptance in the public sector of Ghana’s construction industry (GCI). Using an extended unified theory of acceptance and use of technology (UTAUT 2), variables that promote the acceptance of e-procurement in GCI were explored.
Design/methodology/approach
Data was collected using a mixed method strategy. In the first stage, a semi-structured interview was used to collect, assess and optimize the UTAUT2 model. Thematic analysis was used on the qualitative data, leading to modification of the proposed UTAUT2 model. The study subsequently used a questionnaire survey using the extended UTAUT2 model. Survey data was analyzed using structural equation modelling (SEM), leading to the identification and validation of factors that facilitate e-procurement acceptance in Ghanaian construction as well as the impact of these factors.
Findings
The findings of the study reveal that five independent constructs of the proposed UTAUT2 model significantly affects the behavioural intention of practitioners to accept and use e-procurement in the construction industry in Ghana.
Practical implications
The study will be of utility to government agencies, contracting organizations and other construction stakeholders in developing policy and programmes to support e-procurement acceptance within the sector.
Originality/value
This is a new extended UTAUT2 model that is applicable to technology acceptance within the public sector in sub-Saharan Africa.
Details
Keywords
Elaine Pinto Varela Alberte and Gabriel de Oliveira Novelli
This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and…
Abstract
Purpose
This paper aims to analyze practices, processes and outcomes related to construction supply chain management (CSCM) in Brazil to identify opportunities and direct actions and strategies to improve the Brazilian sector through blockchain technology (BT).
Design/methodology/approach
The study collected empirical data through semi-structured interviews with consumers and distributors to identify how the CSCM functions today. The interviews were structured and analyzed around the following topics: processes, digitalization, quality and weakness of the activities performed. The opportunities for using BT in CSCM were identified by crossing these results with evidence in the bibliography.
Findings
The study identified deficiencies, gaps and good practices applied to information management in the sector. Also, it analyzed the features, drivers and barriers of BT from a practical perspective. The findings suggested that BT is feasible and promising, reducing costs and enhancing process transparency. The need to overcome cultural and economic barriers is a challenging task.
Originality/value
This study brings a new perspective on using BT in CSCM, relating it to the demands and particularities of the construction sector in Brazil. The study identifies a limited panorama of chronic CSCM concerns, given BT’s infinite opportunities. And it motivates a gradual transition toward installing a new technological culture based on BT that focuses on priority care for the sector’s chronic deficiencies. The results can guide practical actions for the successful insertion of BT in the CSCM, laying the foundations for significant future research.
Details
Keywords
Elijah Kusi, Isaac Boateng and Humphrey Danso
Using building information modelling (BIM) technology, a conventional structure in this study was converted into a green building to measure its energy usage and CO2 emissions.
Abstract
Purpose
Using building information modelling (BIM) technology, a conventional structure in this study was converted into a green building to measure its energy usage and CO2 emissions.
Design/methodology/approach
Digital images of the existing building conditions were captured using unmanned aerial vehicle (UAV), and were fed into Meshroom to generate the building’s geometry for 3D parametric model development. The model for the existing conventional building was created and converted to an energy model and exported to gbXML in Autodesk Revit for a whole building analysis which was carried out in the Green Building Studio (GBS). In the GBS, the conventional building was retrofitted into a green building to explore their energy consumption and CO2 emission.
Findings
By comparing the green building model to the conventional building model, the research found that the green building model saved 25% more energy while emitting 46.8% less CO2.
Practical implications
The study concluded that green building reduces energy consumption, thereby reducing the emission of CO2 into the environment. It is recommended that buildings should be simulated at the design stage to know their energy consumption and carbon emission performance before construction.
Social implications
Occupant satisfaction, operation cost and environmental safety are essential for sustainable or green buildings. Green buildings increase the standard of living and enhance indoor air quality.
Originality/value
This investigation aided in a pool of information on how to use BIM methodology to retrofit existing conventional buildings into green buildings, showing how green buildings save the environment as compared to conventional buildings.
Details
Keywords
Available studies on anticorruption practices in the construction industry are exploratory with a very limited theoretical basis. This paper aims to provide a solid theoretical…
Abstract
Purpose
Available studies on anticorruption practices in the construction industry are exploratory with a very limited theoretical basis. This paper aims to provide a solid theoretical foundation to examine situational factors that influence the corruption intentions of individuals and organizations in the construction industry.
Design/methodology/approach
This paper conducts a systematic literature review to synthesize construction management literature that suggests anticorruption practices. The identified practices are then examined using two theoretical frameworks: the fraud diamond theory and Lange’s corruption control framework.
Findings
The results of this research demonstrate how the four elements of the fraud diamond theory may trigger corrupt behavior in construction projects. The results also highlight conceptual distinctions among different means of corruption controls based on Lange’s corruption control framework. In addition, the findings of this research suggest that anticorruption practices should address (1) the incentives to act corruptly, (2) the normative means of corruption control, (3) the internal means of preventing corruption and (4) the shift in organizational culture.
Originality/value
This paper departs from prior research on corruption in construction projects by (1) identifying a large spectrum of anticorruption practices, (2) presenting a detailed theoretical interpretation of these practices and (3) viewing anticorruption practices as multidimensional constructs, which, in turn, leads to novel ways of examining these practices in construction projects.
Details
Keywords
Malik Lakshan Hasantha, Anuradha Samarajeewa Waidyasekara and Hasith Chathuranga Victar
Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for…
Abstract
Purpose
Insufficient time allocation for the bidding period occurs, causing drawbacks to both parties, the client and the bidder. Hence, this study aims to evaluate the time allocated for preparing a bid proposal as per the National Competitive Bidding (NCB) in the Sri Lankan context.
Design/methodology/approach
The study has adopted a mixed method approach and expert interviews and document review to detect, analyse and validate the issues, and solutions based on NCB along with the adequacy of the allocated bidding period used as main data collection tools. Both qualitative and quantitative data were analysed through manual content analysis and inferential analysis respectively.
Findings
Overall, 24 local issues with the existing competitive bidding process and solutions for each were identified. Among the 24 local issues, it was unanimously agreed by all interviewees that three specific issues require attention and improvement. These issues are related to the standard and incompleteness of bidding documents, inaccurate BOQ quantities measured by the consultant or the main contractor, and the excessive number of bidding document amendments by the consultant. It was revealed that a maximum of 42 calendar days (6 weeks) is sufficient for the bidding process while a minimum of 21 calendar days (3 weeks) is insufficient.
Originality/value
The findings of this study would be recommended that Information and Communication Technology Agency (ICTA) understand the necessity of revising the NCB reference to the time allocated for the preparation of bids. By recognising the importance of sufficient time allocation for bid preparation, this research serves as a practical guide for authorities involved in policy formulation, aiding them in implementing revisions that align with the dynamic requirements of bidding procedures.
Details
Keywords
Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas
Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…
Abstract
Purpose
Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.
Design/methodology/approach
Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.
Findings
The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.
Originality/value
The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.
Details
Keywords
Shamima Yesmin and Md. Atikuzzaman
This study aims to investigate the usability of a public university website for measuring its efficiency, users’ satisfaction or anxiety while searching for and retrieving…
Abstract
Purpose
This study aims to investigate the usability of a public university website for measuring its efficiency, users’ satisfaction or anxiety while searching for and retrieving information through different devices.
Design/methodology/approach
A task-based approach was adopted for the study. Twenty-eight participants were asked to complete 11 information-searching tasks on the website. The participants were divided into two groups. The tasks were carried out by members of each group, using desktop and mobile devices in a rotating fashion. Volunteers observed the participants' actions and recorded information regarding their productivity, time usage (using a timer), satisfaction or annoyance while performing each task. Finally, based on the use of the devices, a comparison was established between the participants' performance accuracy, efficiency and anxiety.
Findings
The study provides an overview of a task-based user experience carried out on the university website using a combination of qualitative and quantitative research methods. According to the results, participants' satisfaction levels were generally high, and their anxiety levels were low while completing the tasks on a mobile device. In comparison to the desktop, it took less time overall to complete all tasks. On the other hand, using a desktop computer (97.1%) resulted in better task completion success rates for participants than using a mobile device (85.7%).
Originality/value
No previous task-based evaluation study of this kind has been conducted to assess the usability of any university website in Bangladesh.
Details
Keywords
Usman Musa, Mastura Jaafar and Faraziera Mohd Raslim
This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.
Abstract
Purpose
This study attempts to examine the factors that influence user intention to adopt e-procurement in the Nigerian public sector.
Design/methodology/approach
A well-structured questionnaire was used to collect primary data from 278 procurement and information technology (IT) departments’ officials of key federal government ministries and agencies. The technology acceptance model (TAM) model was adopted and extended with security-related factors, namely perceived trust and perceived security. A partial least squares-structural equation modelling (PLS-SEM) approach was used to test and validate the model.
Findings
The results indicated that perceived usefulness is the best predictor of users’ intention to adopt e-procurement, followed by perceived security and perceived trust. In contrast, however, perceived ease of use was found to have a significant negative effect on the intention to adopt e-procurement.
Originality/value
This study is among the first in the Nigerian public sector context to evaluate users’ perceptions on e-procurement adoption with the use of a distinctive research model (TAM). The study's findings contribute to a better understanding of the factors influencing the adoption of e-procurement in the Nigerian public sector.
Details