Search results

1 – 10 of 757
Article
Publication date: 16 June 2023

Deniz Avci Hosanli

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study…

Abstract

Purpose

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study is to identify all the actors of housing production and their collaborations which shaped Ankara's urban development as the new capital city.

Design/methodology/approach

The study engages with the literature and archival documents to identify the actors of the housing production, i.e. architects, master-builders, public institutions, private companies, contractors and entrepreneurs, and their resultant vocational network in the housing production in Ankara during 1923–1928.

Findings

Due to different agendas, such as speculation, financial interests or patriotism, the construction industry in Ankara had become an arena where many paths intersected, forming an intertwined vocational network. The profession of contractor became popular, and local architects, engineers and even individuals of various other professions began to work as mediators for foreign companies and public institutions, which required support especially in large-scale projects.

Originality/value

The dispersed information revealed that the actors of the housing production remained mostly anonymous, or only the famous architects were commemorated; however, others could be found within the lines of the established literature on Ankara and/or in archival documents. This research not only focuses on “salient” actors but also highlights the “silent” actors of the housing production and prepares charts to clarify the vocational network in Ankara during its first five years to contribute to the future studies on Ankara and its housing.

Details

Open House International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 8 August 2023

Mengkai Liu and Meng Luo

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on…

Abstract

Purpose

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on the cost estimation of prefabricated construction as the research object. This research aims to enhance the accuracy of total project cost estimation for general contractors, ultimately leading to improved profitability.

Design/methodology/approach

This study used Vensim PLE software to establish a system dynamics model. In the modeling process, a systematic research review was used to identify cost-influencing factors; ABC classification and the analytic hierarchy process were used to score and determine the weights of influencing factors.

Findings

The total cost error obtained by the model is less than 2% compared with the actual value. It can be used to cost estimation and analysis. The analysis results indicate that there are 7 key factors, among which the prefabrication rate has the most significant impact. Furthermore, the model can provide the extreme range cost; the minimum cost can reduce by 13% from the value in the case. The factor's value can compose a cost control strategy for general contractors.

Practical implications

The cost of prefabricated buildings can be estimated well, and deciding the prefabrication rate is crucial. The cost can be declined by correct cost control strategies when bidding and subcontracting are in process. The strategies can follow the direction of the model.

Originality/value

A systemic, quantitative and qualitative analysis of cost estimation of prefabricated buildings for general contractors has been conducted. A mathematical model has been developed and validated to facilitate more effective cost-control measures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2024

Rabbia Aslam Siddiqui, Zulfikar Adamu, Obas John Ebohon and Wajeeha Aslam

The construction industry and its activities harmfully affect the environment. Hence, adopting green building (GRB) practices can be helpful in achieving sustainable development…

Abstract

Purpose

The construction industry and its activities harmfully affect the environment. Hence, adopting green building (GRB) practices can be helpful in achieving sustainable development goals. Therefore, this study aims to identify the factors affecting the intention to adopt GRB practices by extending theory of planned behavior (TPB).

Design/methodology/approach

Using non-probability purposive sampling technique, data was gathered from consultant and contractor engineers in the construction industry through a questionnaire. The analysis was done using partial least square-structural equation modeling technique on a useful sample of 290.

Findings

Findings revealed that the core constructs of TPB [i.e. attitude (AT), subjective norms (SUBN) and perceived behavioral control (PBC)] significantly affect the intention to adopt GRB practices. Moreover, government support and knowledge of green practices (KNGP) were found to be critical influencing factors on AT, SUBNs and PBC. Lastly, the findings confirmed that environmental concerns (ENC) play as a moderating between SUBN and intention to adopt GRB practices, as well as AT and intention to adopt GRB practices.

Practical implications

This study contributes to existing knowledge on GRB, offering evidence base for policy choices regarding climate change adaptation and mitigation in the construction industry.

Originality/value

This study provides insights from the perspective of a developing economy and confirms the applicability of TPB in the adoption of GRB practices. Moreover, this study confirms the moderation role of ENC in between TPB constructs and intention to GRB that is not tested earlier in the context of GRB. This study also confirms that government sustainable support positively affects PBC, and KNGP significantly affects SUBNs.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 20 October 2021

Omid Amiri, Mahmoud Rahimi, Amir Ayazi and Garshasb Khazaeni

Nowadays, engineering, procurement and construction (EPC) contracts are being widely used to perform industrial and infrastructure projects because of several reasons like high…

Abstract

Purpose

Nowadays, engineering, procurement and construction (EPC) contracts are being widely used to perform industrial and infrastructure projects because of several reasons like high speed of implementation. However, these contracts are always accompanied by high risks and uncertainties. Thus, selection of the right EPC contractor has significant importance. This paper aims to present a fuzzy multi-criteria decision-making (MCDM) model for EPC contractor prequalification.

Design/methodology/approach

First, the EPC contractor prequalification criteria are defined by using literature review and interviewing experts. Second, the weights of criteria are determined by interviewing experts. Then, each EPC contractor is evaluated in each criterion. Finally, fuzzy weighted average (FWA) approach is employed to select the right contractor among potential EPC contractors.

Findings

The proposed model is prepared as an applicable model for clients to select the right EPC contractors among contractors who want to conduct the project.

Originality/value

As a lack of applicable model does exist to assign the prequalification of EPC contractors, this study is one of the first research studies which proposed a fuzzy MCDM model for evaluation of EPC contractors. To cope with the uncertainty of the prequalification problem, fuzzy logic has been used. Using fuzzy sets leads to reaching more reliable results. Also, a real case study is provided to explain the proposed model.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 2 February 2024

Justice Williams, Frank Fugar, Emmanuel Adinyira and Kofi Agyekum

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This…

Abstract

Purpose

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This study aims to explore channels by which construction companies can effectively communicate health and safety (H&S) among communities of their operations.

Design/methodology/approach

Based on a quantitative research approach, this study addressed the knowledge gap through a cross-sectional survey of 250 contractors (comprising 155 building and 95 road contractors) involved in various projects in the Ghanaian construction industry. These contractors were selected by using a stratified simple random sampling technique. Data obtained from the survey was analysed through descriptive (i.e. frequencies, mean and standard deviation) and inferential (i.e. exploratory factor analysis) statistical analyses.

Findings

The findings from the mean scores revealed that all the 12 communication channels identified in the literature, confirmed through piloting and examined by the respondents, were important channels through which construction companies can effectively communicate H&S amongst communities of their operations. The exploratory factor analysis revealed a clustering of the 12 channels of communication into 5 components: “safety demonstration in the community”; “social media”; “mass media”; “community engagement”; and “opinion leaders”.

Research limitations/implications

This study offers construction project managers the means of managing one of the major stakeholders of a construction project (the community). It provides an actionable opportunity that can be leveraged strategically to integrate community members into projects to promote synergy and local content inclusion while gaining a peaceful atmosphere to achieve their project goals.

Practical implications

Practically, this study provides construction project managers with a means of managing one of the major stakeholders of a construction project (the community) and also demonstrates the integration of community members into projects to promote synergy and local content inclusion. This would give construction organisations a peaceful atmosphere to accomplish their project objectives.

Social implications

The social implication of this study is that the study offers society a means of creating safer Ghanaian communities by offering them the knowledge of identifying hazards and avoiding risky behaviours, creating a good safety atmosphere in these communities.

Originality/value

This study presents construction organisations with a unique opportunity to transfer and share novel external knowledge within a different social system (the community). It contributes to the state-of-the-art knowledge in H&S communication by providing channels through which H&S can be communicated in a developing country such as Ghana.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 3 November 2022

Aba Essanowa Afful, Joshua Ayarkwa, Godwin Kojo Kumi Acquah, Ama Antwi Darkwa Ossei Assibey and Dickson Osei-Asibey

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems…

Abstract

Purpose

The purpose of this study is to identify the capacity needs of building professionals to deliver environmentally sustainable buildings (ESBs) globally, from a unique systems approach. Through a review of extant literature, this study contributes to knowledge of the global delivery of ESBs by identifying research trends and gaps that can be tackled in future research, and current hotspots in capacity building (CB) research within the built environment (BE). The adopted systems approach to CB postulates that the construction industry is systemized in nature, and thus, CB solutions within the industry should be approached from a systems approach.

Design/methodology/approach

A literature search was conducted using the Scopus search engine, augmented by Google Scholar and Web of Science, to produce 54 relevant articles for analysis. The scientometric analysis was undertaken with the use of VOSViewer to better understand the broad literature on CB in the construction industry which would not have been possible with traditional data analysis. The content analysis allowed, for a systematic review of selected articles, to reveal key themes in this study.

Findings

Through a content analysis, four levels of CB were identified within the construction industry; individual level, organizational level, industry level and state level. Nine sub-capacities were subsumed under the four identified levels adopted from Potter and Brough (2004), including but not limited to Performance capacity, Workload capacity, Supervisory capacity, Industry Role capacity and Systems capacity. Under each sub-capacity, key questions were posed to aid identify the capacity needs of BE professionals. A framework for identifying capacity needs in the BE is proposed.

Practical implications

The findings of this study serve as a useful reference for practitioners and policymakers to assess their level of commitment to CB efforts for ESB delivery. The findings of this study have revealed that building the capacities of BE professionals to deliver ESBs should be addressed as part of a broader framework, interdependent on the other levels of CB in the systemic construction industry.

Originality/value

As a review study identifying capacity needs for BE professionals to deliver ESBs, this study enhances knowledge of CB within the construction industry.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 January 2023

Andrew Ebekozien, Clinton Ohis Aigbavboa, Mohamad Shaharudin Samsurijan, Bernard Adjekophori and Angeline Ngozika Chibuike Nwaole

The increasing growth of urbanisation, especially in developing countries, coupled with affordable housing leakages, may thwart achieving Sustainable Development Goal (SDG) 11…

Abstract

Purpose

The increasing growth of urbanisation, especially in developing countries, coupled with affordable housing leakages, may thwart achieving Sustainable Development Goal (SDG) 11 (sustainable cities and communities). Studies regarding affordable housing leakages and their aftermath to Goal 11 in one study are scarce in Malaysia. The study investigated Malaysia's low-cost housing (LCH) leakages and their aftermath to Goal 11 and proffered measures to achieving Goal 11 and its targets. The purpose of this paper is to address these issues.

Design/methodology/approach

The researchers covered four of Malaysia's major cities via a qualitative approach. The study used 40 participants via semi-structured virtual interviews, and saturation was achieved. The study adopted a thematic approach for the collected data and honed them with secondary sources.

Findings

Findings group Malaysia's LCH leakages into government/agencies/departments in housing, housing developers/building contractors and client/building owners' root causes in Malaysia's context. It shows a threat from Malaysia's LCH leakages to achieving Goal 11 and proffered measures to enhance achieving Goal 11. Achieving Goal 11 will strengthen and improve Malaysia's many SDGs accomplishments because of their link.

Originality/value

Apart from proffering measures to mitigate long-standing issues (leakages) in Malaysia's LCH delivery from achieving Goal 11, findings will stipulate the accomplishment of other SDGs related to housing delivery.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 July 2023

Chukwuemeka Patrick Ogbu and Edosa Mark Osazuwa

Studies focusing on the growth of indigenous construction firms (ICFs) are getting dated, and unreflective of recent policy changes in developing countries. This study sought to…

Abstract

Purpose

Studies focusing on the growth of indigenous construction firms (ICFs) are getting dated, and unreflective of recent policy changes in developing countries. This study sought to analyze critical barriers to the growth of ICFs and obtain an unsupervised parsimonious grouping of the barriers for policy improvements.

Design/methodology/approach

A mix of quantitative and qualitative research methods was adopted for the study. ICFs in Nigeria were cross-sectionally surveyed based on a set of firm growth barriers obtained from literature and refined by focus group discussion. Descriptive (means, standard deviations, percentages) and inferential (Kruskal-Wallice and Mann-Whitney U test) statistics were used in the analyses of the data. Factor analysis was used to group the variables.

Findings

Results showed that “declining” ICFs are more negatively impacted by low construction mechanization/use of labor intensive methods, inadequate geographical reach of operations, and inadequate flow of jobs/low demand than “stunted” and “growing” ICFs. The three main domains of critical barriers to the growth of ICFs were identified in descending order of importance as low patronage, difficulty accessing funds, and business management incapacity.

Research limitations/implications

The study recommends improvements in access to funds for ICFs by increasing the percentage of advance payments, and creating a pool of equipment for easy hire by ICFs. ICFs are advised to seek information on tendering opportunities outside their regions of domicile in order to increase their patronage.

Originality/value

This study reveals differences in the impacts of growth barriers on ICFs at different growth levels. This study also clarifies persisting barriers to the growth of ICFs [primarily construction micro, small and medium-sized enterprises (MSMEs)] from a developing country perspective using a longer list of variables.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 757