Article
Publication date: 16 April 2024

Shuyuan Xu, Jun Wang, Xiangyu Wang, Wenchi Shou and Tuan Ngo

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s…

Abstract

Purpose

This paper covers the development of a novel defect model for concrete highway bridges. The proposed defect model is intended to facilitate the identification of bridge’s condition information (i.e. defects), improve the efficiency and accuracy of bridge inspections by supporting practitioners and even machines with digitalised expert knowledge, and ultimately automate the process.

Design/methodology/approach

The research design consists of three major phases so as to (1) categorise common defect with regard to physical entities (i.e. bridge element), (2) establish internal relationships among those defects and (3) relate defects to their properties and potential causes. A mixed-method research approach, which includes a comprehensive literature review, focus groups and case studies, was employed to develop and validate the proposed defect model.

Findings

The data collected through the literature and focus groups were analysed and knowledge were extracted to form the novel defect model. The defect model was then validated and further calibrated through case study. Inspection reports of nearly 300 bridges in China were collected and analysed. The study uncovered the relationships between defects and a variety of inspection-related elements and represented in the form of an accessible, digitalised and user-friendly knowledge model.

Originality/value

The contribution of this paper is the development of a defect model that can assist inexperienced practitioners and even machines in the near future to conduct inspection tasks. For one, the proposed defect model can standardise the data collection process of bridge inspection, including the identification of defects and documentation of their vital properties, paving the path for the automation in subsequent stages (e.g. condition evaluation). For another, by retrieving rich experience and expert knowledge which have long been reserved and inherited in the industrial sector, the inspection efficiency and accuracy can be considerably improved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 February 2023

V.H. Lad, D.A. Patel, K.A. Chauhan and K.A. Patel

The work on bridge resilience assessment includes quantitative and qualitative approaches to compare the multiple bridges based on their resilience. But still, the bridge…

Abstract

Purpose

The work on bridge resilience assessment includes quantitative and qualitative approaches to compare the multiple bridges based on their resilience. But still, the bridge resilience obtained by these assessment approaches is inefficient when prioritising multiple bridges to improve their resilience. Therefore, this study aims to develop a methodology for prioritising the bridges to improve their resilience.

Design/methodology/approach

The research methodology follows three sequential phases. In the first phase, criteria importance through intercriteria correlation (CRITIC) technique is used to compute the criteria weights. The criteria considered are age, area, design high flood level, finish road level FRL and resilience index of bridges. While 12 river-crossing bridges maintained by one bridge owner are considered as alternatives. Then, in the second phase, the prioritisation of each bridge is evaluated using five techniques, including technique for order of preference by similarity to ideal solution, VIKOR (in Serbian, Visekriterijumska Optimizacija I Kompromisno Resenje), additive ratio assessment, complex proportional assessment and multi-objective optimisation method by ratio analysis. Finally, in the third phase, the results of all five techniques are integrated using CRITIC and the weighted sum method.

Findings

The result of the study enables bridge owners to deal with the particular bridge that requires resilience improvement. The study concluded that it is not enough to consider only the bridge resilience index to improve its resilience. The prioritisation exercise should consider various other criteria that are not preferred during the bridge resilience assessment process.

Originality/value

The proposed methodology is a novel framework based on the existing multi-criteria decision-making (MCDM) techniques for contributing knowledge in the domain of bridge resilience management. It can efficiently overcome the pitfall of decision-making when two bridges have the same resilience index score.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 April 2024

Jorge Furtado Falorca

The purpose of this paper is to report on the results of a study carried out to identify and analyse which potential subject areas may have impact on developments in the field of…

Abstract

Purpose

The purpose of this paper is to report on the results of a study carried out to identify and analyse which potential subject areas may have impact on developments in the field of building maintenance (BM). That is, it is intended to contribute to the integration of new approaches so that building maintenance management (BMM) becomes as automated, digital and intelligent or smartness as possible in the near future.

Design/methodology/approach

The research approach has resulted in a theory that is essentially based on a qualitative design. The route followed was a literature review, involving the collection, analysis and interpretation of carefully selected information, mostly from recently published records. The data assembled and the empirical experience itself made it possible to present a comprehensive viewpoint and some future outlooks.

Findings

Five thematic areas considered as potentially impactful for BM developments have been highlighted, analysed and generically labelled as thematic base words, which are monitoring, automation, digitalisation, intelligence and smart. It is believed that these may be aspects that will lay the groundwork for a much more advanced and integrated agenda, featured by a high-tech vision.

Originality/value

This is thought to be a different way of looking at the problem, as it addresses five current issues together. Trendy technological aspects are quite innovative and advantageous for BMM, providing opportunities not yet widely explored and boosting the paradigm shift.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 December 2023

Niveen Badra, Hosam Hegazy, Mohamed Mousa, Jiansong Zhang, Sharifah Akmam Syed Zakaria, Said Aboul Haggag and Ibrahim Abdul-Rashied

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel…

Abstract

Purpose

This research aims to create a methodology that integrates optimization techniques into preliminary cost estimates and predicts the impacts of design alternatives of steel pedestrian bridges (SPBs). The cost estimation process uses two main parameters, but the main goal is to create a cost estimation model.

Design/methodology/approach

This study explores a flexible model design that uses computing capabilities for decision-making. Using cost optimization techniques, the model can select an optimal pedestrian bridge system based on multiple criteria that may change independently. This research focuses on four types of SPB systems prevalent in Egypt and worldwide. The study also suggests developing a computerized cost and weight optimization model that enables decision-makers to select the optimal system for SPBs in keeping up with the criteria established for that system.

Findings

In this paper, the authors developed an optimization model for cost estimates of SPBs. The model considers two main parameters: weight and cost. The main contribution of this study based on a parametric study is to propose an approach that enables structural engineers and designers to select the optimum system for SPBs.

Practical implications

The implications of this research from a practical perspective are that the study outlines a feasible approach to develop a computerized model that utilizes the capabilities of computing for quick cost optimization that enables decision-makers to select the optimal system for four common SPBs based on multiple criteria that may change independently and in concert with cost optimization during the preliminary design stage.

Social implications

The model can choose an optimal system for SPBs based on multiple criteria that may change independently and in concert with cost optimization. The resulting optimization model can forecast the optimum cost of the SPBs for different structural spans and road spans based on local unit costs of materials cost of steel structures, fabrication, erection and painting works.

Originality/value

The authors developed a computerized model that uses spreadsheet software's capabilities for cost optimization, enabling decision-makers to select the optimal system for SPBs meeting the criteria established for such a system. Based on structural characteristics and material unit costs, this study shows that using the optimization model for estimating the total direct cost of SPB systems, the project cost can be accurately predicted based on the conceptual design status, and positive prediction outcomes are achieved.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 December 2023

Muzamil Ahmad Rafiqii, M.A. Lone and M.A. Tantray

This study aims to provide a review for scour in complex rivers and streams with coarser bed material, steep longitudinal bed slopes and dynamic environments, in the interest of…

Abstract

Purpose

This study aims to provide a review for scour in complex rivers and streams with coarser bed material, steep longitudinal bed slopes and dynamic environments, in the interest of the safety and the economy of hydraulic structures. The knowledge of scour in such geographical complexities is very crucial for a comprehensive understanding of scour failures and for establishing definitive criteria to bridge this major research gap.

Design/methodology/approach

The existing available literature shows significant work done in case of silt, sand and small sized coarser bed material but any substantial work for bed material of gravel size or above is lacking, resulting in a wide gap. Though some researchers have attempted to explore possibilities of refining the existing models by adding pier size, shape, sediment non-uniformity and armouring effects, which otherwise have been given a miss by the various researchers, including the pioneer in the field Lacey–Inglis (1930). But still, a rational model for scour estimation in such complex conditions for global use is yet to come. This is because all the parameters governing the scour have not been studied properly till date as is evident from the globally available literature and is witnessed in the field too, in recurrent failure of hydraulic structures especially bridges.

Findings

The researchers presume that the finer materials move only as a result of erosion. However, in actual field conditions, it has been observed that the large-sized stones also roll down and cause huge erosion along the river bed and damage the hydraulic structures, especially in the steep river/stream beds along hilly slopes. This fact has been overlooked in the models available globally and has been highlighted only in the current work in an attempt to recognize this major research gap. A study carried out on a number of streams globally and in Jammu and Kashmir, India also, has shown that in steep river and stream beds with bed material consisting of gravel size or greater than gravel, large scour holes ranging from 1 m to 5 m were created by furious floods, and due to other unknown forces along the channel path and near foundations of hydraulic structures.

Originality/value

To the best of the authors’ knowledge, this work is purely original.

Details

World Journal of Engineering, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1708-5284

Keywords

Article
Publication date: 28 June 2023

Lin Yang, Qiming Li and Wei Pan

This research aims to argue that manual geometric modeling is blocking the building information modeling (BIM) promotion to small-size companies. Therefore, it is necessary to…

Abstract

Purpose

This research aims to argue that manual geometric modeling is blocking the building information modeling (BIM) promotion to small-size companies. Therefore, it is necessary to study a manner of automated modeling to reduce the dependence of BIM implementation on manpower. This paper aims to make a study into such a system to propose both its theory and prototype.

Design/methodology/approach

This research took a prototyping as the methodology, which consists of three steps: (1) proposing a theoretical framework supporting automated geometric modeling process; (2) developing a prototype system based on the framework; (3) conducting a testing for the prototype system on its performance.

Findings

Previous researches into automated geometric modeling only respectively focused on a specific procedure for a particular engineering domain. No general model was abstracted to support generic geometric modeling. This paper, taking higher level of abstraction, proposed such a model that can describe general geometric modeling process to serve generic automated geometric modeling systems.

Research limitations/implications

This paper focused on only geometric modeling, skipping non-geometric information of BIM. A complete BIM model consists of geometric and non-geometric data. Therefore, the method of combination of them is on the research agenda.

Originality/value

The model proposed by this paper provide a mechanism to translate engineering geometric objects into textual representations, being able to act as the kernel of generic automated geometric modeling systems, which are expected to boost BIM promotion in industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 March 2023

Kexin Zhang, Dachao Li and Xingwei Xue

In this paper, taking a p-section girder cable-stayed bridge as an example, the construction monitoring and load test of the bridge are implemented.

Abstract

Purpose

In this paper, taking a p-section girder cable-stayed bridge as an example, the construction monitoring and load test of the bridge are implemented.

Design/methodology/approach

In order to ensure the safety of cable-stayed bridge structure in construction and achieve the internal force state of the completed bridge, the construction process is monitored for liner and stress of the p-section girder, construction error and safety state during construction. At the same time, to verify whether the bridge can meet the design requirements, the static and dynamic load tests are done.

Findings

The results of construction monitoring show that the stress state of the structure during construction is basically consistent with the theoretical calculation and design requirements. The final measured stress state of the structure is within the allowable range of the cable-stayed bridge, and the structural stress state is normal and meets the specification requirements. The load tests results show that the measured deflection of the midspan section of the main girder is less than the theoretical calculation value. The maximum deflection of the main girder is 48.03 mm, which is less than 54.25 mm of the theoretical value, indicating that the main girder has sufficient structural stiffness. Under the dynamic load test, the natural frequency of the three spans of the bridge is less than the theoretical frequency.

Originality/value

This study can provide important reference value for the construction and maintenance of similar p-section girder cable-stayed bridges.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 28 June 2023

Ahmed M. Ibrahim, Mohammad A. Hassanain and Mohamed H. Salaheldin

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Abstract

Purpose

This research compares consultants' and contractors' professional practices and perspectives on the use of specifications in the engineering of built environment projects.

Design/methodology/approach

The study initiates with a review of literature, toward realizing (1) the need for inclusion of specifications, throughout the projects' stages (design, tender, construction and handing over), as well as the (2) causes and effects of defective specifications in design and execution of engineered projects. Additionally (3) the study investigates the challenges and causes of specification variations to projects' design and execution. The systematic methodology adopted in this research utilizes frequency indicators, to rank and correlate the perspectives of 60 professionals, who are experienced in consulting and contracting of mega public and private projects.

Findings

The research considers the uncertainties and differences that could be present in engineering developments and use of design specifications for projects' execution and handing over. The two groups of experts' (consultants and contractors) perspectives are usually observed as conflicting, in practice. Practices comparison of their experiences with engineering projects' specifications usability provides unique empirical findings. The analysis and assessment of the experts' knowledge, this research addresses gaps identified in the literature, providing valuable insights.

Originality/value

The study provides in-depth recommendations and discusses possible trends and methods for enhancing specifications' usability in design engineering and execution of built environment projects. The analysis and recommendations present and assess experts' knowledge while bridge gaps identified from the literature.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 23 November 2023

Ruizhen Song, Xin Gao, Haonan Nan, Saixing Zeng and Vivian W.Y. Tam

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based…

Abstract

Purpose

This research aims to propose a model for the complex decision-making involved in the ecological restoration of mega-infrastructure (e.g. railway engineering). This model is based on multi-source heterogeneous data and will enable stakeholders to solve practical problems in decision-making processes and prevent delayed responses to the demand for ecological restoration.

Design/methodology/approach

Based on the principle of complexity degradation, this research collects and brings together multi-source heterogeneous data, including meteorological station data, remote sensing image data, railway engineering ecological risk text data and ecological restoration text data. Further, this research establishes an ecological restoration plan library to form input feature vectors. Random forest is used for classification decisions. The ecological restoration technologies and restoration plant species suitable for different regions are generated.

Findings

This research can effectively assist managers of mega-infrastructure projects in making ecological restoration decisions. The accuracy of the model reaches 0.83. Based on the natural environment and construction disturbances in different regions, this model can determine suitable types of trees, shrubs and herbs for planting, as well as the corresponding ecological restoration technologies needed.

Practical implications

Managers should pay attention to the multiple types of data generated in different stages of megaproject and identify the internal relationships between these multi-source heterogeneous data, which provides a decision-making basis for complex management decisions. The coupling between ecological restoration technologies and restoration plant species is also an important factor in improving the efficiency of ecological compensation.

Originality/value

Unlike previous studies, which have selected a typical section of a railway for specialized analysis, the complex decision-making model for ecological restoration proposed in this research has wider geographical applicability and can better meet the diverse ecological restoration needs of railway projects that span large regions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 October 2023

Temidayo O. Osunsanmi, Chigozie Collins Okafor and Clinton Ohis Aigbavboa

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment…

Abstract

Purpose

The implementation of smart maintenance (SM) has greatly benefited facility managers, construction project managers and other stakeholders within the built environment. Unfortunately, its actualization for stakeholders in the built environment in the fourth industrial revolution (4IR) era remains a challenge. To reduce the challenge, this study aims at conducting a bibliometric analysis to unearth the critical success factors supporting SM implementation. The future direction and practice of SM in the construction industry were also explored.

Design/methodology/approach

A bibliometric approach was adopted for reviewing articles extracted from the Scopus database. Keywords such as (“smart maintenance“) OR (“intelligent maintenance”) OR (“technological maintenance”) OR (“automated maintenance”) OR (“computerized maintenance”) were used to extract articles from the Scopus database. The studies were restricted between 2006 and 2021 to capture the 4IR era. The initial extracted papers were 1,048; however, 288 papers were selected and analysed using VOSviewer software.

Findings

The findings revealed that the critical success factors supporting the implementation of SM in the 4IR era are collaboration, digital twin design, energy management system and decentralized data management system. Regarding the future practice of SM in the 4IR era, it was also revealed that SM is possible to evolve into maintenance 4.0. This will support the autonomous maintenance of infrastructures in the built environment.

Research limitations/implications

The use of a single database contributed to the limitation of the findings from this study.

Practical implications

Despite the limitations, the findings of this study contributed to practice and research by providing stakeholders in the built environment with the direction of SM practice.

Originality/value

Stakeholders in the built environment have clamoured to implement SM in the 4IR era. This study provided the critical success factors for adopting SM, guaranteeing the 4IR era. It also provides the research trends and direction of SM practice.