Article
Publication date: 3 November 2022

Bruno Lot Tanko, Wyom Paul Zakka and Wee Nie Heng

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of…

591

Abstract

Purpose

The purpose of this study is to explore existing literature on Building Information Modelling (BIM) in Malaysia and examine the perception of practitioners about the potential of BIM applications in reducing construction waste and enhancing productivity.

Design/methodology/approach

First, using 244 bibliographic data extracted from the Scopus database, the paper used scientometric analysis and VOSviewer mapping technique to assess the most impactful publication literature on BIM in Malaysia to identify the existing research gaps. Second, using a structured questionnaire, a total of 100 questionnaires were distributed to practising practitioners who incorporate BIM in the delivery of their projects. Descriptive analysis using cross-tabulation in SPSS software, radar chart, relative importance index and Pearson’s correlation were used to analyze the data.

Findings

The research gaps are in the fields of construction projects, buildings, energy efficiency, lifecycle and housing. The findings of the survey indicate that quantity take-off, clash detection, site utilization planning, digital fabrication as well as 4D stimulation were the main BIM applications used among the practitioners in Johor and Selangor.

Practical implications

By assessing the state-of-the-art of BIM and BIM applications in this region, the practical implications of this study provide useful insights to construction stakeholders, funding organizations, policymakers, research institutions, professionals, journal editors, reviewers and researchers to understand the overall trend of BIM in Malaysia and its usage.

Originality/value

This paper is the first to use science mapping using scientometrics to reveal the current BIM research in “Malaysia only”. Relying on the identified gaps, the study further examined the usage of BIM applications in Malaysian construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 July 2023

Mohammad Omar Aburumman, Rateb Sweis and Ghaleb J. Sweis

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit…

Abstract

Purpose

The construction industry sector is developing rapidly, especially with the increasing pace of the Fourth Industrial Revolution in this sector. Construction projects can benefit from greater integration and collaboration between their technologies and processes to reap the advantages and keep pace with the recent significant technological and managerial techniques developments. Therefore, this study aims to delve into and investigate building information modeling (BIM) and Lean Construction (L.C.) with a concentration on the potential BIM–lean interactions synergy and integration in the Jordanian construction industry.

Design/methodology/approach

This study takes exploratory nature, followed by the deductive research approach, and is designed to be a mono-quantitative research methodology. Moreover, the sampling technique is non-probability convenience sampling, and the research strategy is implemented through a questionnaire used and analyzed by using Statistical Package for Social Science to conduct descriptive and inferential statistical analysis and verify the reliability and validity through proper tests.

Findings

The BIM–lean interactions synergy and integration findings revealed that eliminating waste (time, cost, resources), promoting continuous improvement (Kaizen) and standardizing as lean construction principles are the most significant and agreeable toward achieving BIM–lean interactions synergy. On the other hand, “High 3D Visualization Modelling” was the most significant BIM function, followed by “Rapid and Auto-Generation of Documents and Multiple Design Alternatives” and “Maintenance of Information and Design Model Integrity.” Moreover, based on the relative importance index (RII) values, “Lack of Technical Expertise in BIM-LEAN” is the most significant challenge with a 0.89 value of RII, followed by “Lack of Government Direction and Standard Guidelines” with a 0.88 value of RII and “Financial considerations” with a 0.83 value of RII.

Originality/value

This study will help provide a new detailed overview that investigates the effects and expected benefits of integrating BIM processes and technological functionalities with lean construction principles within a synergetic environment. Moreover, the study will increase the awareness of using new technologies and management approaches in the architectural, engineering and construction industry, seeking to achieve integration between these technologies to reach ideal results in terms of the outputs of construction operations.

Details

International Journal of Lean Six Sigma, vol. 15 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 15 November 2022

Esra Dobrucali, Sevilay Demirkesen, Emel Sadikoglu, Chengyi Zhang and Atilla Damci

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization…

1526

Abstract

Purpose

Construction safety is heavily affected by using new technologies in this growing trend of technology adoption. Especially, safety performance is enhanced through the utilization of some effective technologies such as artificial intelligence, virtual reality, BIM and wearable devices. Therefore, the main purpose of this study is to investigate the influence of emerging technologies on construction safety performance and quantify the relationship between those. The proposed components of emerging technologies are BIM, GIS, VR, RFID, AI, ML, eye tracking and serious games and wearable devices, whereas the dimensions of construction safety performance are safety planning, safety training, safety inspection and monitoring, safety audits and reviews and safety leadership.

Design/methodology/approach

A structural model was composed consisting of emerging technologies and safety performance indicators. Then, a questionnaire was designed and administered to construction professionals, and data from 167 projects were analyzed using structural equation modeling. The data were analyzed by using software, called SPSS AMOS.

Findings

The analysis of the structural model proves that there is a positive and significant relationship between emerging technologies and construction safety performance. Moreover, the factor loadings for each factor were found to be high indicating a good representation of the construct by the components developed. Among the technologies, BIM, robotics and automation, AI and wearable devices were detected to be the most significant technologies in terms of impacting safety performance.

Originality/value

The study contributes to the body of knowledge in that it develops a conceptual framework consisting of specific technologies in terms of emerging technologies, reveals the impact of such technologies on safety performance and proposes several tools and strategies for enabling effective safety management along the project lifecycle. Industry practitioners may benefit from the framework developed by adopting such technologies to enhance their safety performance on construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 September 2022

Angeliki Kylili, Phoebe-Zoe Georgali, Petros Christou and Paris Fokaides

The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this…

495

Abstract

Purpose

The built environment is taking enormous leaps towards its digitalization. Computer-aided tools such as building information modeling (BIM) are found in the forefront of this evolution, playing a critical role in creating the foundations for the upcoming development of smart low-carbon cities. However, the potential of BIM is still untapped – links will need to be created among the available and forthcoming methodologies under one integral operational system. The purpose of this paper is to present an integrated BIM-based life cycle-oriented framework for achieving sustainable constructions at the pre-construction phase. The developed framework represents an example of the approaches that the construction industry will need to adopt to integrate the different tools under an integrated smart city context.

Design/methodology/approach

The methodological approach follows the development of four same-volume different-configuration three-dimensional BIM designs, which are coupled with life cycle assessment (LCA) tools for establishing sustainable building design.

Findings

The results of this paper indicated that the choice of building design and shape can play a significant role in reducing the embodied energy and embodied carbon of buildings, achieving a reduction of up to 15% compared to a reference building of same volume and gross floor area.

Originality/value

The originality of this paper is found in its approach application by coupling three-dimensional BIM models with LCA data, the use of reinforcement detailing in an nD BIM study and the employment of country-specific LCA databases.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Chi Zhang, Kun He, Wenjie Zhang, Ting Jin and Yibin Ao

To further promote application of BIM technology in construction of prefabricated buildings, influencing factors and evolution laws of willingness to apply BIM technology are…

Abstract

Purpose

To further promote application of BIM technology in construction of prefabricated buildings, influencing factors and evolution laws of willingness to apply BIM technology are explored from the perspective of willingness of participants.

Design/methodology/approach

In this paper, a tripartite game model involving the design firm, component manufacturer and construction firm is constructed and a system dynamics method is used to explore the influencing factors and game evolution path of three parties' application of BIM technology, from three perspectives, cost, benefit and risk.

Findings

The government should formulate measures for promoting the application of BIM according to different BIM application willingness of the parties. When pursuing deeper BIM application, the design firm should pay attention to reducing the speculative benefits of the component manufacturer and the construction firm. The design firm and the component manufacturer should pay attention to balancing the cost and benefit of the design firm while enhancing collaborative efforts. When the component manufacturer and the construction firm cooperate closely, it is necessary to pay attention to balanced distribution of interests of both parties and lower the risk of BIM application.

Originality/value

This study fills a research gap by comprehensively investigating the influencing factors and game evolution paths of willingness of the three parties to apply BIM technology to prefabricated buildings. The research helps to effectively improve the building quality and construction efficiency, and is expected to contribute to the sustainability of built environment in the context of circular economy in China.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 November 2022

Asli Pelin Gurgun, Kerim Koc and Handan Kunkcu

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of…

1052

Abstract

Purpose

Completing construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.

Design/methodology/approach

In total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.

Findings

The findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.

Originality/value

Despite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 February 2024

Mojdeh Naderi, Ahad Nazari, Ali Shafaat and Sepehr Abrishami

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of…

Abstract

Purpose

This study addresses the prevailing complexities and limitations in estimating and managing construction overhead costs (COCs) in the existing literature, with the purpose of enhancing the accuracy of cost performance indicators in construction project management.

Design/methodology/approach

An innovative approach is proposed, employing the activity-based costing (ABC) accounting method combined with building information modelling (BIM) to assign real overhead costs to project activities. This study, distinguished by its incorporation of a real case study, focuses on an administrative building with a four-story concrete structure. It establishes an automated method for evaluating project cost performance through the detailed analysis of earned value management (EVM) cost indicators derived from ABC results and BIM data.

Findings

The results show that the ABC integration improves the accuracy of cost performance indicators by over 9%, revealing the project's true cost index for the first time and demonstrating the substantial value of the approach in construction engineering and management.

Research limitations/implications

The current study highlights a notable gap in the existing literature, addressing the challenges in onsite overhead cost estimation and offering a solution that incorporates the state-of-the-art techniques.

Practical implications

The proposed method has significant implications for project managers and practitioners, enabling better-informed decisions based on precise cost data, ultimately leading to enhanced project outcomes.

Originality/value

This research uniquely combines ABC and BIM, presenting a pioneering solution for the accurate estimation and management of COCs in construction projects, adding significant value to the current body of knowledge in this field.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 25 April 2022

Vuyokazi Precious Camngca, Christopher Amoah and Emma Ayesu-Koranteng

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of…

2167

Abstract

Purpose

The construction industry’s daily processes demand heavy data usage and communication between project participants to meet client requirements. Thus, the application of information technology in project implementation has been increasing in the construction sector (CS) lately. However, the same cannot be seen in public sectors responsible for implementing government projects in South Africa. This study aimed to investigate the causes and effects of the underutilisation of information communication technology (ICT) in the building section of a public sector in a municipality in South Africa.

Design/methodology/approach

A qualitative approach was adopted for the study, using a public sector in one of the municipalities as a case study. Face-to-face interviews were conducted among the building unit workers, using unstructured interview questions. The data collected were analysed using the ATLAS.ti software.

Findings

The findings indicate a lack of understanding of existing and newly available ICT software and hardware technology among staff within the building technology due to lack of digitalisation in construction projects implementation, inadequate system upgrades, lack of adequate ICT resources, lack of financial resources for internet and software application subscriptions and lack of ICT training leading. The issues mentioned above have led to the outsourcing of projects professionals, slow pace of electronic emails, untrained professionals, usage of different and unlicensed software, resulting in the underutilisation of ICT within the whole building section. This change also adversely affects all officials, especially the junior officials who have graduated using the most recent ICT technology during their studies.

Research limitations/implications

The building department of only one public sector was used for the study; therefore, the findings may not be generalisable. The case study public sector’s name is withheld for confidentiality purposes.

Practical implications

Adequate change management and continuous development, combined with the allocation of proper resources, would be necessary for all staff members. Enormous investments had to be made in the ICT equipment by providing a sufficient budget in the building section of the public sectors. The building section within public sectors should provide change management to all aged skills staff by attending seminars to learn new ICT technology applied within its work environment.

Originality/value

The study established the causes of the underutilisation of ICT in the CS, especially in the public work departments and municipalities, and how this contributes to service delivery.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords