Article
Publication date: 20 May 2024

Janappriya Jayawardana, Malindu Sandanayake, Supun Jayasinghe, Asela Kulatunga and Guomin Zhang

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated…

Abstract

Purpose

The present study aims to identify significant barriers to adopting prefabricated construction (PFC) in developing economies using a study in Sri Lanka and develop an integrated strategy framework to mitigate and overcome the obstacles.

Design/methodology/approach

The research process included a comprehensive literature review, a pilot study, a questionnaire survey for data collection, statistical analysis and a qualitative content analysis.

Findings

Ranking method revealed that all 23 barriers were significant. Top significant barriers include challenges in prefabricated component transportation, high capital investment costs and lack of awareness of the benefits of PFC among owners/developers. Factor analysis clustered six barrier categories (BCs) that fit the barrier factors, explaining 71.22% of the cumulative variance. Fuzzy synthetic evaluation revealed that all BCs significantly influence PFC adoption in Sri Lanka. Finally, the proposed mitigation strategies were mapped with barriers to complete the integrated framework.

Practical implications

The study outcomes are relevant to construction industry stakeholders of Sri Lanka, who are keen to enhance construction efficiencies. The implications can also benefit construction industry stakeholders and policymakers to formulate policies and regulations and identify mitigation solutions.

Originality/value

The study provides deeper insights into the challenges to adopting prefabrication in South Asian countries such as Sri Lanka. Furthermore, the integrated framework is a novel contribution that can be used to derive actions to mitigate barriers in developing economies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79472

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 23 December 2022

Dan Wang, Jingyi Luo and Yongkun Wang

This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building…

Abstract

Purpose

This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building supply chain risk and is expected to be used by industry stakeholders for supply chain risk management.

Design/methodology/approach

Based on the uncertainty circle model, construct a configuration analysis framework for supply chain risks in prefabricated buildings. The fuzzy set qualitative comparative analysis (fsQCA) is used to study the configuration influence of five uncertain factors, including environment, plan-control, demand-supply, manufacturing and assembly-transportation, on the risk of the prefabricated building supply chain.

Findings

There are three paths to promote the high-risk generation of the prefabricated building supply chain: assembly-transportation-oriented, plan-control-oriented and manufacturing-oriented. There is a specific equivalent substitution relationship among the five causal conditions. Under specific conditions, different combinations of conditions have the same effect on promoting supply chain high-risk generation through equivalent substitution.

Originality/value

The multiple concurrent causal relationships of risk conditions in the assembly construction supply chain are studied under the grouping perspective, which helps to expand the research perspective of assembly construction supply chain risk and provides theoretical guidance for supply chain risk management of construction enterprises.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2236

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 7 November 2022

Buddhini Ginigaddara, Srinath Perera, Yingbin Feng, Payam Rahnamayiezekavat and Mike Kagioglou

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive…

Abstract

Purpose

Industry 4.0 is exacerbating the need for offsite construction (OSC) adoption, and this rapid transformation is pushing the boundaries of construction skills towards extensive modernisation. The adoption of this modern production strategy by the construction industry would redefine the position of OSC. This study aims to examine whether the existing skills are capable of satisfying the needs of different OSC types.

Design/methodology/approach

A critical literature review evaluated the impact of transformative technology on OSC skills. An existing industry standard OSC skill classification was used as the basis to develop a master list that recognises emerging and diminishing OSC skills. The master list recognises 67 OSC skills under six skill categories: managers, professionals, technicians and trade workers, clerical and administrative workers, machinery operators and drivers and labourers. The skills data was extracted from a series of 13 case studies using document reviews and semi-structured interviews with project stakeholders.

Findings

The multiple case study evaluation recognised 13 redundant skills and 16 emerging OSC skills such as architects with building information modelling and design for manufacture and assembly knowledge, architects specialised in design and logistics integration, advanced OSC technical skills, factory operators, OSC estimators, technicians for three dimensional visualisation and computer numeric control operators. Interview findings assessed the current state and future directions for OSC skills development. Findings indicate that the prevailing skills are not adequate to readily relocate construction activities from onsite to offsite.

Originality/value

To the best of the authors’ knowledge, this research is one of the first studies that recognises the major differences in skill requirements for non-volumetric and volumetric OSC types.

Details

Construction Innovation , vol. 24 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 September 2022

Marina Arnaut

Corporate entrepreneurship (CE) has attracted considerable attention worldwide, and the challenges of managing employees’ entrepreneurial behaviours are increasingly recognised…

Abstract

Purpose

Corporate entrepreneurship (CE) has attracted considerable attention worldwide, and the challenges of managing employees’ entrepreneurial behaviours are increasingly recognised. However, the paucity of research on managers’ entrepreneurial behaviour in the United Arab Emirates multinational corporate environment creates a salient gap in the current understanding of how national and organisational cultures that not always align frame the critical problems of CE. This study aims to fill this research gap by examining multinationals’ CE antecedents drawing on an institutional perspective in Dubai.

Design/methodology/approach

The author conducts 54 in-depth interviews with middle managers in multinational enterprises. This study adopts a multiple case study research design to reveal whether an emergent discovery is exclusive to a particular case or is consistently replicated by multiple cases. The author has used abductive reasoning to systematically integrate analytical framework deduction with raw data induction.

Findings

This study’s findings indicate that CE in Dubai is ineffective and fragmented. Arguably, the cultural background of employees creates different circumstances and determinants of entrepreneurial behaviour. Hence, CE may not achieve epitome competencies without identifying multicultural nuances in an organisational context.

Originality/value

Existing research has placed relatively little emphasis on the role of individual national culture in multinational enterprises. This study’s results offer potentially valuable implications for theory, practice and future research addressing other emerging countries. This model presents a distinct CE architecture with compelling evidence for national culture (at the macro level), organisational culture, Corporate Entrepreneurship Assessment Instrument and emergent factors (at the meso level) and individual middle managers' real-life experience (at the micro level).

Details

Journal of Entrepreneurship in Emerging Economies, vol. 16 no. 3
Type: Research Article
ISSN: 2053-4604

Keywords

Open Access
Article
Publication date: 22 March 2024

Abdul Rauf, Daniel Efurosibina Attoye and Robert H. Crawford

Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received…

Abstract

Purpose

Recently, there has been a shift toward the embodied energy assessment of buildings. However, the impact of material service life on the life-cycle embodied energy has received little attention. We aimed to address this knowledge gap, particularly in the context of the UAE and investigated the embodied energy associated with the use of concrete and other materials commonly used in residential buildings in the hot desert climate of the UAE.

Design/methodology/approach

Using input–output based hybrid analysis, we quantified the life-cycle embodied energy of a villa in the UAE with over 50 years of building life using the average, minimum, and maximum material service life values. Mathematical calculations were performed using MS Excel, and a detailed bill of quantities with >170 building materials and components of the villa were used for investigation.

Findings

For the base case, the initial embodied energy was 57% (7390.5 GJ), whereas the recurrent embodied energy was 43% (5,690 GJ) of the life-cycle embodied energy based on average material service life values. The proportion of the recurrent embodied energy with minimum material service life values was increased to 68% of the life-cycle embodied energy, while it dropped to 15% with maximum material service life values.

Originality/value

The findings provide new data to guide building construction in the UAE and show that recurrent embodied energy contributes significantly to life-cycle energy demand. Further, the study of material service life variations provides deeper insights into future building material specifications and management considerations for building maintenance.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

3089

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 8 of 8