Article
Publication date: 13 July 2017

R.P.N.P. Weerasinghe and Y.G. Sandanayake

The purpose of this paper is to develop a collaborative facilities management (CFM) model incorporating facilities management (FM) functions that can be shared and performed…

Abstract

Purpose

The purpose of this paper is to develop a collaborative facilities management (CFM) model incorporating facilities management (FM) functions that can be shared and performed collaboratively by two or more organisations to enhance the performance of FM functions of collaborating organisations.

Design/methodology/approach

A critical literature review followed by a preliminary investigation was used to identify main categories of FM functions that can be performed collaboratively and dimensions that affect FM collaboration. Subsequently, a detailed list of FM functions that can be performed collaboratively under eight different contexts based on three dimensions identified through observations, document reviews and in-depth interviews with experts who have experience in each context.

Findings

The paper introduces a novel concept of CFM to share utility/infrastructure facilities, facility services and information by two or more organisations to maintain, improve, adapt and ensure functionality of the built environments of the collaborating organisations. The study identified core business, geographical location and ownership as the key dimensions that affect CFM concept. The outcome of the study, which is CFM model, proposes FM functions that can be performed collaboratively and benefits of collaborating utilities/infrastructure facilities, facility services and information under the aforementioned key dimensions to create a win-win situation for the organisations.

Practical implications

The paper highlights the FM functions that can be performed collaboratively in order to provide favourable solutions for operational issues faced by facilities managers, while optimising the FM performance of the organisations.

Originality/value

The CFM model offers original insights to the FM functions that can be shared and performed collaboratively by organisations under different contexts to optimise the FM performance.

Article
Publication date: 22 September 2021

R. Rajadurai and Aneetha Vilventhan

Transportation infrastructure projects are inevitably delayed due to delays in the completion of underground utility relocation. Unfamiliar location, difficulty in utility…

Abstract

Purpose

Transportation infrastructure projects are inevitably delayed due to delays in the completion of underground utility relocation. Unfamiliar location, difficulty in utility identification and use of ineffective coordination practices hamper timely completion of utility relocation works. This paper aims to develop integrated road information modeling (RIM) and geographic information system (GIS) models to assist early identification of utilities and effective coordination during utility relocation in infrastructure projects.

Design/methodology/approach

An ethnographic action-based case study research methodology was adopted in this paper. Two ongoing infrastructure projects with significant utility relocation delays are chosen as case studies and integrated RIM-GIS models are developed to assist utility relocation. To verify the applications of developed RIM-GIS models, a focus group discussion was conducted with 10 field experts from the considered case studies.

Findings

The application of the developed RIM-GIS models enabled 3D visualization of existing underground utilities and enabled identification of utility conflicts before the start of the construction. They also enabled facilitating coordination and reduce utility relocation delays. The evaluation of the developed models shows that the RIM-GIS model approach enabled early planning and coordination and facilitates effective management of utility relocations.

Practical implications

The current practices of using CAD and GIS for utility relocations are inadequate due to the difficulties in characterizing utilities and ineffective coordination practices. The proposed RIM-GIS approach can be adopted as a suitable alternative for effective management of utility relocations.

Originality/value

Several studies have contributed toward integrating BIM and GIS for the analysis of highway and utility infrastructure projects. Efforts on integrating RIM and GIS for the support and management of utility relocations in highway and utility infrastructure projects remain unexplored.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 October 2020

Aneetha Vilventhan, Sanu Razin and R. Rajadurai

The relocation of existing underground utilities in urban environments is complex because of the existence of multiple utility agencies being responsible for numerous utilities…

Abstract

Purpose

The relocation of existing underground utilities in urban environments is complex because of the existence of multiple utility agencies being responsible for numerous utilities and over constrained space and time to execute maintenance works. Unfamiliar location and insufficient records of maintenance data hamper the flow of work, causing unnecessary delays and conflicts. The aim of the paper is to explore 4 dimensional Building Information Modeling as a smart solution for the management of multiple utility data for a relocation project in an urban setting.

Design/methodology/approach

An empirical case-based research methodology is used to collect data and develop the BIM models. Two ongoing construction projects in an urban city are empirically studied, and 4D BIM models of identified utilities are developed to assist management and relocation of existing utilities.

Findings

The developed BIM models enabled the location of existing sub-surface utilities through 3D visualization and also enabled clash detection. The 4D simulation of BIM model enabled the tracking of actual progress of relocation works and thereby helped in taking necessary actions to minimize forthcoming delays. The evaluation of the developed model showed that the application of 4D BIM improved communication and coordination during utility relocation works.

Practical implications

4D BIM for utility infrastructure provides better management of utility information. They provide utility stakeholders an efficient way to coordinate, manage utility relocation processes through improved visualization and communication with a reduction in delays and conflicts.

Originality/value

Limited efforts were made using 3D BIM for sub-surface utility infrastructure in visualization and management of utility information. Efforts using 4D BIM in coordination and management of utility projects are left unexplored. This study adds value to the current literature through the application of 4D BIM for utility relocation projects.

Article
Publication date: 6 May 2021

Kerry Liu

This study aims to analyse the effects of China’s information and communications technology (ICT) infrastructure investment on economic growth.

Abstract

Purpose

This study aims to analyse the effects of China’s information and communications technology (ICT) infrastructure investment on economic growth.

Design/methodology/approach

Using a panel data set of China’s 30 regions during 2010–2015, this study uses the generalized method of moments (GMM) methods.

Findings

This study finds that compared with “old-type” infrastructure investment such as transport infrastructure and utility infrastructure, there is a time lag but greater effect from ICT infrastructure investment on growth and this relation is non-linear. Also, the human capital factor plays an enhancing role.

Originality/value

This study is the first of its kind that examines the relationship between ICT infrastructure investment and growth in China.

Article
Publication date: 6 December 2021

Henry Duncan John Mwamvani, Christopher Amoah and Emma Ayesu-Koranteng

The study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.

Abstract

Purpose

The study aims to find the causes of road projects implementation delays in Blantyre, one of the four city councils (CCs) in Malawi.

Design/methodology/approach

The study followed a qualitative research approach using a Blantyre City Council (BCC) as a case study. This study combined in-depth, face-to-face interviews with councillors, secretariat staff, consultants, and contractors who worked on the city's road projects. Data gathered were analysed using thematic content analysis. Also, some road project documents were examined.

Findings

The findings from the case study revealed the primary cause of road project construction delays as the shortage of engineers in conducting detailed proposed projects surveys resulting in incomplete project scope definition before contractor's procurement. Other identified factors were service providers delaying the removal of existing public utility infrastructure from project sites, client funding issues, scope changes, and client delays in issuing instructions to the contractors during project implementation. Another factor was the shortage of construction equipment and construction materials experienced by some appointed contractors.

Research limitations/implications

Only road construction projects and stakeholders operating from Blantyre city, Malawi, were contacted for the study; thus, the findings may not be generalizable.

Practical implications

There is an urgent need to increase technical employees, especially engineers and other critical technical staff such as quantity surveyors in Blantyre. Employees' conditions of service should be conducive to attract qualified people to undertake effective management and assessment of projects before commencement to identify the feasibility of proposed projects to decrease the rate of road construction project delays.

Originality/value

The study has established Blantyre city's core challenges in implementing its road projects seamlessly and has provided mitigation measures for dealing with the shortcomings.

Details

Built Environment Project and Asset Management, vol. 12 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Book part
Publication date: 30 November 2018

Lloyd Levine

Access to high-speed Internet is essential for full and consequential participation in the civic, economic, and education systems of modern life. Yet 30% of Californians continue…

Abstract

Access to high-speed Internet is essential for full and consequential participation in the civic, economic, and education systems of modern life. Yet 30% of Californians continue to lack “meaningful Internet access” at home. This digital divide is worse among already disadvantaged communities and prevents rural, lower-income, and disabled individuals from fully participating in the civic, economic, and education systems of life in 2018. This chapter establishes the magnitude of the digital divide, examines the factors that contribute to the Divide, and looks at which groups are most affected. Successful government programs that invested in utility infrastructure and adoption, such as the Rural Electrification Act, the American Reinvestment and Recovery Act and the California Advanced Services Fund, are examined to provide a foundation for broadband specific policy recommendations. The chapter sets up a framework for policy recommendations by segmenting the population based upon the concepts of material and motivational access and establishing meaningful Internet access as the goal for policy-makers. The chapter puts forth a number of specific policy recommendations to address the technological disparity and prevent it from furthering the economic and educational divides.

Details

The M in CITAMS@30
Type: Book
ISBN: 978-1-78769-669-3

Keywords

Expert briefing
Publication date: 9 May 2018

Trump described the Joint Comprehensive Plan of Action (JCPOA) as "defective at its core". Iran's compliance has repeatedly been verified, but the agreement has never operated as…

Article
Publication date: 1 March 2005

Stefan Geiser

The west surgery wing of the University Hospital “Insel” in Bern, which was completed in 1971, no longer meets operational requirements. A decision was made in 1995 that it must…

Abstract

The west surgery wing of the University Hospital “Insel” in Bern, which was completed in 1971, no longer meets operational requirements. A decision was made in 1995 that it must be completely renovated. The INO renovation project embraces in particular the Intensive care, Emergency and Surgery Centre. The Building Department of the Canton of Bern, which is responsible for overseeing construction work on the Insel hospital, is pursuing an open building method for the INO project to ensure that the “serviced structure” of the building (with main utility infrastructure) will continue to be highly adaptable, and that the components of the building are interchangeable and reusable. Building sections with differing service lives and designated purposes are therefore kept consistently separate in the planning and execution phases. The use of separate (discrete) systems anticipates the long-term life cycle of the building, and thus safeguards its value in terms of future use. Work is divided into discrete system levels: the primary system (building shell) is designed for a service life of 50 to 100 years, the secondary system (fit-out) for 15 to 50 years and the tertiary system (hospital equipment) for 5 to 15 years.

The project is currently in the execution phase and is being developed in three stages. The 1st stage, the primary system, was completed at the end of 2002, the other stages have not yet been implemented. The 1st stage of the INO project is to go into operation by 2006 and the 2nd stage by 2009.

Details

Open House International, vol. 30 no. 1
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 15 September 2022

Bardia Naghshineh and Helena Carvalho

This study aims to explore how certain adoption barriers of additive manufacturing (AM) technology may lead to supply chain (SC) vulnerabilities, which in turn would deteriorate…

Abstract

Purpose

This study aims to explore how certain adoption barriers of additive manufacturing (AM) technology may lead to supply chain (SC) vulnerabilities, which in turn would deteriorate supply chain resilience (SCR).

Design/methodology/approach

A case study of a leading original equipment manufacturer (OEM) that uses AM technology to directly produce end-use metal parts for different industries was performed. Primary data were collected using the in-depth interview method, which was complemented by secondary data from internal and publicly available sources. The findings were compared with the existing literature to triangulate the results.

Findings

The findings indicate that certain AM adoption barriers make the SC vulnerable to reliance on specialty sources, supplier capacity, production capacity, utilization of restricted materials, importance of product purity, raw material availability, unpredictability in customer demand, reliability of equipment, unforeseen technology failures, reliance on information flow, industrial espionage, and utilities availability.

Research limitations/implications

The SCR outcomes of the identified SC vulnerabilities and their interrelated AM adoption barriers are proposed in this study.

Practical implications

Drawing on the case study findings and the existing literature, several practices are put forward in a framework that supply chain management (SCM) may use to mitigate the identified SC vulnerabilities caused by the AM adoption barriers.

Originality/value

This is the first study to empirically examine and identify the SC vulnerabilities that are caused by the adoption barriers of AM technology.

Details

Journal of Manufacturing Technology Management, vol. 33 no. 8
Type: Research Article
ISSN: 1741-038X

Keywords

Article
Publication date: 9 July 2021

Dermot McCarthy, Phyllis Alexander and Young Jung

This study aims to examine the interrelationship between the employee public service motivations (PSM), organisational corporate social responsibility (CSR) objectives and…

Abstract

Purpose

This study aims to examine the interrelationship between the employee public service motivations (PSM), organisational corporate social responsibility (CSR) objectives and employee organisational commitment amongst accounts department staff in public service organisations.

Design/methodology/approach

Survey data is taken from tax accountants and accounts administration staff (n = 285) across seven South Korean state-owned enterprises involved in the provision of various public services (utilities, infrastructure, energy and housing). Structural equation modeling techniques are used to conduct mediation and moderated-mediation analysis.

Findings

Results show that both employee PSM and organisational CSR are significant in determining organisational commitment, especially where they result in value congruence. The authors also find that perceived levels of internal and external CSR are significant in moderating the impact of different dimensions of PSM.

Practical implications

As accounting in public service organisations faces growing professional and commercial demands to address stakeholder needs, the need for organisations to retain accounts staff with the necessary motivations is vital. The findings highlight the importance of value congruence in achieving long-term employee organisational commitment and the need for the CSR objectives of organisations to take account of both external and internal stakeholders.

Originality/value

Little research has examined the relationship between PSM and organisational commitment amongst accounting staff in the quasi-public/private state-owned enterprise sector. This despite the level of organisational (e.g. introduction of new public management approach) and professional change (e.g. regulatory changes) experienced over the past two decades and the importance of the sector in public service provision.

Details

Journal of Accounting & Organizational Change, vol. 18 no. 2
Type: Research Article
ISSN: 1832-5912

Keywords