Search results

1 – 10 of 547
Article
Publication date: 26 July 2024

Beth Crosbie, Trevor Gerhardt and Joel Montgomery

Using a Problem Based Learning (PBL) approach, this paper examines whether internships can stand as a viable alternative to Higher Degree Apprenticeships (HDAs) within the UK…

Abstract

Purpose

Using a Problem Based Learning (PBL) approach, this paper examines whether internships can stand as a viable alternative to Higher Degree Apprenticeships (HDAs) within the UK Higher Education (HE) context. It was a process that was undertaken to identify work-integrated schemes as a part of a curriculum portfolio transformation project. This presented itself as a strategic avenue capable of fostering a competitive advantage (strategic differentiation), particularly in enhancing graduate employability through a differentiation in pedagogy employing Work-Integrated Learning (WIL).

Design/methodology/approach

This paper applied a PBL approach comprising of five distinct stages based on the McMaster Five-Point Strategy. This included the Problem Identification, Generating Solutions through a review of relevant literature and a case study, using an evaluation matrix to identify the best solution to Decide a Course of Action, Implementing the Solution and Evaluating the Solution. It presents an institutional and curriculum change project.

Findings

WIL can offer both strategic differentiation, an organisational distinctiveness within HE and Pedagogical differentiation, such as embedding internships in curriculum. This can be achieved by creating clear guidelines and expected outcome frameworks, bespoke feedback templates and enhanced collaboration, Experiential Learning pedagogy in the curriculum and the inclusion of other forms of WIL to further diversify and create a WIL organisational culture.

Practical implications

Practitioner use of applying problem-solving models for work-integrated curriculum planning.

Originality/value

We present a confluence of the concepts strategic differentiation and pedagogical differentiation using WIL as a conduit. We present this using a PBL evaluative review approach. The paper’s distinct contribution manifests in the formulation of three pivotal recommendations.

Details

Higher Education, Skills and Work-Based Learning, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2042-3896

Keywords

Article
Publication date: 25 August 2023

Sepani Senaratne, Abhishek KC and Siryana Rai

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from…

Abstract

Purpose

Megaprojects are financially large and complex in scope, which require engagement of stakeholders from various institution and communities. With increased concerns from stakeholders on sustainability related issues, from environmental to socio-economic perspective, managing megaprojects has become quite challenging. Hence, there should be proactive approaches in active engagement of stakeholders from the start of the projects to overcome such issues. Currently, there is a knowledge gap on stakeholder management strategies specific to megaprojects on managing sustainability issues.

Design/methodology/approach

This research has adopted review of secondary data from case studies to identify stakeholder management challenges and strategies in megaprojects around Sydney area. The documents related to three different projects were reviewed and data were collected through qualitative content analysis and coding with use of NVivo software for within case analysis and was followed by thematic approach for cross case analysis.

Findings

Every case study project's sustainability-related stakeholder issues are more similar than different to others. Differences are mostly in terms of intensity of impact of any issue in a particular project, and/or intensity of impact at certain phase of any project. Moreover, significant sectors and strategies have been identified for key focus to manage environment and socioeconomic issues. Whatever be the strategies, in case of megaprojects, they need to be mostly proactive.

Originality/value

This research has extended the knowledge on stakeholder management, in relation to managing sustainability-related issues of megaprojects during their design, construction and operation phases. This research offers useful strategies for project teams of megaprojects to develop a proactive stakeholder management plan, addressing unavoidable sustainability challenges.

Details

Built Environment Project and Asset Management, vol. 14 no. 3
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 4 March 2024

Prasad Vasant Joshi, Bishal Dey Sarkar and Vardhan Mahesh Choubey

Supply chain finance (SCF) has become a vital ingredient that fosters growth and provides flexibility to the global supply chain. Thus, it becomes essential to understand the…

Abstract

Purpose

Supply chain finance (SCF) has become a vital ingredient that fosters growth and provides flexibility to the global supply chain. Thus, it becomes essential to understand the factors that contribute to the success of the supply chain finance ecosystem (SCFE). This study aims to identify the critical success factors (CSFs) for the development of an efficient and effective SCFE. Based on their characteristics, the study intends to classify the factors into constructs and further establish a hierarchical relationship among the CSFs.

Design/methodology/approach

The study is based on empirical data collected from 221 respondents based on administered questionnaires. Exploratory factor analysis (EFA) is carried out on 16 selected factors (out of 21 proposed factors) based on the feedback of the experts and the factors were classified into four constructs. The total interpretive structural modeling (TISM) model was developed by identifying and finalizing CSFs of the SCFE. The model developed a hierarchical relationship between the various factors.

Findings

The study identified significant CSFs for the efficient and effective SCF ecosystem. Four constructs were developed by analyzing CSFs using the EFA. The finalized 16 CSFs modeled through the TISM and further hierarchical relationship established between the CSFs concludes that governmental policies and sectoral growth are the strongest driving forces and financial attractiveness is the weakest driving force. Based on the CSFs and the constructs identified, it was found that for the success of the SCF ecosystem, the existence of an economic ecosystem provides a facilitating framework for the overall development of the SCFE. Also, the trustworthiness among the partners fosters better relationships and results in financial feasibility and offers business opportunities for all the stakeholders.

Practical implications

This study will help the SCF partners across the globe understand the CSFs that ensure development of mutually beneficial SCF ecosystems and provide flexibility to the supply chain partners. The CSFs would provide insights to the policymakers and the financial intermediaries for providing a conducive environment for the development of a better SCF ecosystem. Also, the buyers and sellers would understand the CSFs that would develop better relationships among them and ultimately help in development of business across the globe.

Originality/value

The study identifies the CSFs for the SCF ecosystem. The study ascertains the significant factors and classifies them into clusters using EFA. Unlike the literature available, the paper develops the hierarchical relationship between the CSFs and develops a model for an efficient and effective SCF ecosystem.

Article
Publication date: 17 September 2024

Ghiwa Assaf and Rayan H. Assaad

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are…

Abstract

Purpose

Project bundling is an innovative practice that groups or bundles several infrastructure projects into a single contract. While project bundling has various benefits, agencies are facing some challenges when bundling their projects, including properly assessing the feasibility (or infeasibility) of project delivery methods (PDMs) of interest. More specifically, project owners face the challenge of properly selecting between traditional and alternative PDMs for their bundled projects. Although some research efforts were devoted to providing guidelines in relation to different aspects related to project bundling, no previous study was conducted to help project owners performing PDMs-related feasibility analysis for bundled projects, which differ from normal, singly delivered projects. To fill this knowledge gap, this paper develops a decision-support tool that assists agencies in deciding whether they should select a traditional or alternative PDM (i.e. whether to go with the Design-Bid-Build (DBB) PDM or not) for their bundled projects.

Design/methodology/approach

An analytical methodology comprised of four main steps was followed in this paper. First, an expert survey was developed and distributed to industry experts to quantify the importance of 25 project bundling objectives. Second, principal component analysis was used to determine the weights for the different project bundling objectives. Third, a series of statistical tests was implemented to identify different feasibility tiers. Fourth, a user-friendly decision-support tool was developed, and its capabilities were demonstrated.

Findings

The results showed that six tiers exist to classify the feasibility (or infeasibility) of traditional PDMs (i.e. the DBB method) for bundled projects. The research outcomes have also reflected that the following five project bundling objectives contribute the most to making traditional PDMs (i.e. the DBB method) more feasible for bundled projects: (1) Having well-defined design features; (2) Requiring prior knowledge or experience with similar project size and scope; (3) Completing the overall project on schedule; (4) Keeping rate of expenditures within cash flow plan; and (5) Acquiring specific legislative, regulatory and jurisdictional requirements early on.

Originality/value

This research adds to the body of knowledge by equipping agencies and project owners with a decision-support system that helps them identify whether traditional or alternative PDMs are more appropriate for the specific objectives of their bundling program(s). By making the right PDM decision, project owners can enhance their bundling practices (especially in relation to the PDM proper selection) and ultimately the performance of their bundled projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 September 2024

Minh Van Nguyen, Khanh Duy Ha and Chien Thanh Phan

Reconstruction of old buildings is often necessary after prolonged usage, but these projects encounter various complexities, leading to their failure. However, there is a lack of…

Abstract

Purpose

Reconstruction of old buildings is often necessary after prolonged usage, but these projects encounter various complexities, leading to their failure. However, there is a lack of studies that focus on investigating the complexity of old building reconstruction initiatives. Thus, this study aims to examine the complexity of reconstruction projects for old buildings in Vietnamese urban areas.

Design/methodology/approach

Through a literature review and discussions with experienced practitioners, 12 significant complexity factors were identified. The study then utilized the fuzzy decision-making trial and evaluation laboratory (DEMATEL) technique to analyze the interrelationships among these complexity factors.

Findings

The findings revealed intricate interdependencies among the complexity factors, visualized in a complexity map. The map highlighted the critical complexities of site compensation, clearance and the long project duration. Furthermore, a causal diagram categorized the complexity factors into net-effect and net-cause groups.

Originality/value

By examining the relationships and interactions among these factors, the study emphasizes the interconnected nature of complex systems and the influence of one factor on others. Therefore, decision-makers and stakeholders involved in reconstructing old buildings are suggested to possess a comprehensive understanding of these interdependencies to ensure effective decision-making.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 August 2024

Ali Nouri, Mehdi Safari Gerayli, Ebrahim Givaki and Ali Laalbar

The aim of this study is to examine the effect of aural accounting (AA) on companies’ stakeholder relationship capability in the Iranian capital market.

23

Abstract

Purpose

The aim of this study is to examine the effect of aural accounting (AA) on companies’ stakeholder relationship capability in the Iranian capital market.

Design/methodology/approach

In terms of methodology, this study adopts a mixed approach based on both inductive and deductive foundations. The goal is to develop a comprehensive theoretical framework regarding the feasibility and practical implementation of AA and to assess its impact on the ability to interact with stakeholders. In this research, the components of AA were identified through a meta-synthesis process. Subsequently, data on these variables were collected using a researcher-made questionnaire. Additionally, a standard questionnaire was used to measure the stakeholders' interaction capability. The study used partial least squares structural equation modeling for hypothesis testing. A total of 412 participants, consisting of financial managers and heads of accounting departments of capital market companies, were involved in hypothesis testing.

Findings

The results of this study indicate that AA has a significant and positive impact on companies’ stakeholder relationship capabilities. In other words, AA establishes a bidirectional flow of information, enabling companies to demonstrate a more appropriate response to the changing needs of their stakeholders.

Originality/value

To the best of the authors’ knowledge, this study represents the first research to present a framework for AA and examine its impact on companies' interaction capabilities with stakeholders. Consequently, the findings not only contribute to the expansion of theoretical literature in accounting and financial reporting but also provide multiple practical implications for capital market policymakers and standard setters regarding the potential consequences of AA.

Details

Accounting Research Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1030-9616

Keywords

Article
Publication date: 19 September 2024

Diana Ominde, Edward Godfrey Ochieng and Tarila Zuofa

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research…

Abstract

Purpose

The purpose of this study is to examine the influence of stakeholder integration and project complexity on information technology (IT) projects in Kenya. The following research question guided our inquiry: what is the influence of project complexity and stakeholder integration on the performance of IT projects in Kenya?

Design/methodology/approach

To advance the current understanding of the effect of stakeholder integration and project complexity on IT projects, multiple regressions were used to predict how project complexity and stakeholder integration influence project performance. Both government-funded and privately funded IT projects from a developing country were examined.

Findings

The study found that any project’s complexity and stakeholder integration levels offer a distinctive contribution to its success. Theoretically, the study contributes to linkages between stakeholder integration and project complexity concerning IT project performance. Through the adoption of actionable research and theoretical elaboration, we have shown that the successful execution of IT projects is driven by the successful integration of stakeholders and monitoring the level of complexity at each phase of the project.

Originality/value

The findings of this study add to the burgeoning literature on the performance of IT projects and come with several managerial implications as well. It brings to the fore the concept of stakeholder integration as an essential element of project success. The findings suggest that the inclusion of stakeholder integration into corporate decisions, strategies and policies can be an asset to the production of sustainable competitive advantages needed during the implementation of IT projects in government entities and organisations. As shown in this study, all the above require a collaborative platform allowing for data sharing among diverse stakeholders to ameliorate distrust or lack of information.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 16 August 2024

Coralie Helleputte and Anaïs Périlleux

Social enterprises (SEs) are increasingly expected to rely on formal methodologies to assess their social impact. These structured methodologies, which produce objective and…

Abstract

Purpose

Social enterprises (SEs) are increasingly expected to rely on formal methodologies to assess their social impact. These structured methodologies, which produce objective and evidence-based measures of impact, are sometimes opposed to bricolage approaches that “make do” with what is at hand. This paper aims to question this distinction by identifying the conflicting considerations that arise in the process of implementing a formal methodology, which might lead SEs to rely on bricolage mechanisms. The authors propose a model of “formally-driven” bricolage with core principles to navigate between those considerations.

Design/methodology/approach

Adopting an inductive approach, the authors draw on the in-depth case study of a work integration SE engaged in a formal social impact assessment (SIA) through collaborative research.

Findings

First, the authors identify five types of considerations (feasibility, efficiency, ethics, legitimacy and aim) that come into tension with the primary considerations of formality in formal methodologies, leading SEs to still rely on bricolage mechanisms. Second, the authors identify five principles (multidimensional, participative, cultural, mixed-method and adaptive) that permit navigation between those conflicting considerations. Based on the findings, the authors develop a model of “formally-driven” bricolage.

Originality/value

The contribution is methodological, theoretical and practical. The authors bridge the gap between theory and practice through long-term immersion in an SE. The authors contribute to the understanding of the use of bricolage in SIA by investigating why and how bricolage is still at play in formal assessments. The proposed model of “formally-driven” bricolage can help researchers and practitioners to better grasp the ins and outs of the SIA process.

Details

Social Enterprise Journal, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-8614

Keywords

Article
Publication date: 6 June 2022

Abdullahi Mohammed Usman and Kamil Abdullah

The purpose of this study is to develop a set of parameters universally acceptable for assessing design and construction strategies for reducing operational energy usage and its…

Abstract

Purpose

The purpose of this study is to develop a set of parameters universally acceptable for assessing design and construction strategies for reducing operational energy usage and its associated greenhouse gas (GHG) emission. Also, the parameters are intended to estimate the quantity of energy and its associated GHG emission reduction over the assessment period.

Design/methodology/approach

This study used five steps framework comprising definition of purpose, selecting the candidate parameters, criteria selection and description, selecting proposed parameters and defining the proposed parameters. The criteria used were the parameter’s prevalence, measurability, preference and feasibility toward adaptability to the relevant stakeholders.

Findings

This study consolidated 11 parameters. Seven cover designs and construction strategies comprising energy monitoring, natural lighting and ventilation design. Others are building thermal performance, efficient equipments, renewable energy and energy policy. The remaining four consider operational energy consumption, GHG emission quantification and their reduction over time.

Practical implications

Providing suitable indicators for assessing direct and indirect GHG emission with easily accessible data is essential for assessing built environment. The consolidated parameters can be used in developing rating systems, monitoring GHG inventories and activities of building related industries.

Originality/value

This study was conducted at the CEIES UTHM and used 11 existing rating systems open for research purposes, International Panel for Climate Change reports and GHG protocol report and guides and several other standards.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 4
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 14 August 2024

Huijun Tu and Shitao Jin

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible…

Abstract

Purpose

Due to the complexity and diversity of megaprojects, the architectural programming process often involves multiple stakeholders, making decision-making difficult and susceptible to subjective factors. This study aims to propose an architectural programming methodology system (APMS) for megaprojects based on group decision-making model to enhance the accuracy and transparency of decision-making, and to facilitate participation and integration among stakeholders. This method allows multiple interest groups to participate in decision-making, gathers various perspectives and opinions, thereby improving the quality and efficiency of architectural programming and promoting the smooth implementation of projects.

Design/methodology/approach

This study first clarifies the decision-making subjects, decision objects, and decision methods of APMS based on group decision-making theory and value-based architectural programming methods. Furthermore, the entropy weight method and fuzzy TOPSIS method are employed as calculation methods to comprehensively evaluate decision alternatives and derive optimal decision conclusions. The workflow of APMS consists of four stages: preparation, information, decision, and evaluation, ensuring the scientific and systematic of the decision-making process.

Findings

This study conducted field research and empirical analysis on a practical megaproject of a comprehensive transport hub to verify the effectiveness of APMS. The results show that, in terms of both short-distance and long-distance transportation modes, the decision-making results of APMS are largely consistent with the preliminary programming outcomes of the project. However, regarding transfer modes, the APMS decision-making results revealed certain discrepancies between the project's current status and the preliminary programming.

Originality/value

APMS addresses the shortcomings in decision accuracy and stakeholder participation and integration in the current field of architectural programming. It not only enhances stakeholder participation and interaction but also considers various opinions and interests comprehensively. Additionally, APMS has significant potential in optimizing project performance, accelerating project processes, and reducing resource waste.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 547