Search results
1 – 10 of over 5000This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…
Abstract
Purpose
This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.
Design/methodology/approach
The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.
Findings
The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.
Originality/value
The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.
Details
Keywords
Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang
Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…
Abstract
Purpose
Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).
Design/methodology/approach
A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.
Findings
This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.
Originality/value
This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).
Details
Keywords
Murat Gunduz, Khalid Naji and Omar Maki
This paper aims to present the development of a holistic campus facility management (CFM) performance assessment framework that incorporates a fuzzy logic approach and integrates…
Abstract
Purpose
This paper aims to present the development of a holistic campus facility management (CFM) performance assessment framework that incorporates a fuzzy logic approach and integrates a comprehensive set of key factors for successful management of campus facilities. The devised framework aims to cater to the needs of campus facilities management firms and departments for the purpose of gauging and assessing their performance across different management domains. Through this approach, facility management organizations can detect potential areas of enhancement and adopt preemptive steps to evade issues, foster progress and ensure success.
Design/methodology/approach
After a comprehensive analysis of the literature, conducting in-depth interviews with industry experts and employing the Delphi technique in two rounds, a total of 45 indicators critical to CFM success were identified and subsequently sorted into seven distinct groups. Through an online questionnaire, 402 subject-matter experts proficiently assessed the significance of the critical success indicators and their groups. A fuzzy logic framework was developed to evaluate and quantify a firm's compliance with the critical success indicators and groups of indicators. The framework was subsequently weighted using computations of the relative importance index (RII) based on the responses received from the questionnaire participants. The initial section of the framework involved a comprehensive analysis of the firm's performance vis-à-vis the indicators, while the latter part sought to evaluate the impact of the indicators groups on the overall firm's performance.
Findings
The utilization of fuzzy logic has uncovered the significant effects each effective CFM key indicator on indicators groups, as well as the distinct effects of each CFM indicators group on the overall performance of CFM. The results reveal that financial management, communications management, sustainability and environment management and workforce management are the most impactful indicators groups on the CFM performance. This suggests that it is imperative for management to allocate increased attention to these specific areas.
Originality/value
This study contributes to the advancement of current knowledge by revealing vital indicators of effective CFM and utilizing them to construct a thorough fuzzy logic framework that can assist in evaluating the effectiveness of CFM firms worldwide. This has the potential to provide crucial assistance to facility management organizations, facility managers and policymakers in their quest for informed decision-making.
Details
Keywords
Prachi Vinod Ingle, Mahesh Gangadhar and M.D. Deepak
In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the…
Abstract
Purpose
In recent times, there has been a lot of research focused on performance measurement (PM) in project-based sectors. However, there are very few studies that were reported on the significance of PM in the construction sector. Keeping track of an organization in achieving organizations goals and objectives seems an important way. One of the major challenges faced by the industry is unavailable of an appropriate PM system for assessing organizational performance. Most of the PM approaches consider the traditional project triangle assessment of project success. Based on the limitations identified in existing PM models, the purpose of this paper is to develop a comprehensive PM model, i.e. Modified Project Quarter Back Rating (MPQR) applicable for construction projects.
Design/methodology/approach
A detailed list of performance areas as a method for PM is analyzed in the construction industry context. Also, industry-specific professionals conducted semi-structured interviews to assess whether these performance areas are sufficient to measure and understand the PM systems.
Findings
The research finding focuses on developing the MPQR model that considers both financial and non-financial areas for performance assessment to provide a holistic assessment of project performance.
Practical implications
MPQR model provides an opportunity to set the benchmark for overall performance for construction organizations.
Originality/value
The findings of the study are expected to provide guidelines to construction professionals for implementing the performance model that will improve performance in the construction industry.
Details
Keywords
Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…
Abstract
Purpose
In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.
Design/methodology/approach
A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.
Findings
This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.
Originality/value
This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.
Details
Keywords
Robert Osei-Kyei, Timur Narbaev, Michael Atafo-Adabre, Nicholas Chileshe and Joseph Kwame Ofori-Kuragu
The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the…
Abstract
Purpose
The demand for retirement villages globally has been increasing due to the rapid growth in the ageing population in recent years. To address the rising challenges in the retirement market, the public–private partnership (PPP) has become a feasible method to develop retirement villages. This paper aims to survey and examine the key success criteria (SC) for using the PPP approach in the retirement village sector.
Design/methodology/approach
An empirical questionnaire survey was conducted with experts experienced in international PPP and retirement village. The analysis was conducted using one-way analysis of variance, mean score analysis, Kendall’s coefficient of concordance and factor analysis.
Findings
Results indicate that out of the 16 recognized SC, the most significant ones are SC1: “Affordability”, SC11: “Reduced social isolation of residents” and SC14: “Improvement of emotional wellbeing of residents”. Furthermore, results from the factor analysis technique indicate that the 16 SC can be classified into five major factor groupings, and these include SCG1 – “Financial performance of project”; SCG2 – “Adherence to design and technical specifications”; SCG3 – “Adherence to local council/authority’s environmental health and socio-economic requirements”; SCG4 – “Social inclusion and risk management”; and SCG5 – “Advancement in emotional wellbeing and physical health of residents”.
Originality/value
The study will sufficiently assist retirement village stakeholders, retirement village project participants and related government authorities of the best measures to put in place to maintain the sustainable development of the global retirement village market.
Details
Keywords
Ruifan Chang and Maxwell Fordjour Antwi-Afari
The application of three-dimensional (3D) printing technology in construction projects is of increasing interest to researchers and construction practitioners. Although the…
Abstract
Purpose
The application of three-dimensional (3D) printing technology in construction projects is of increasing interest to researchers and construction practitioners. Although the application of 3D printing technology at various stages of the project lifecycle has been explored, few studies have identified the relative importance of critical success factors (CSFs) for implementing 3D printing technology in construction projects. To address this research gap, this study aims to explore the academics (i.e. researchers) and construction practitioners’ perspectives on CSFs for implementing 3D printing technology in construction projects.
Design/methodology/approach
To do this, a questionnaire was administered to participants (i.e. academics and construction practitioners) with knowledge and expertise in 3D printing technology in construction projects. The collected data were analysed using mean score ranking, normalization and rank agreement analysis to identify CSFs and determine the consistency of the ranking of CSFs between academics and construction practitioners. In addition, exploratory factor analysis was used to identify the relationships and underlying constructs of the measured CSFs.
Findings
Through a rank agreement analysis of the collected data, 11 CSFs for implementing 3D printing technology were retrieved (i.e. 17% agreement), indicating a diverse agreement in the ranking of the CSFs between academics and construction practitioners. In addition, the results show three key components of CSFs including “production demand enabling CSFs”, “optimize the construction process enabling CSFs” and “optimized design enabling CSFs”.
Originality/value
This study highlights the feasibility of implementing the identified CSFs for 3D printing technology in construction projects, which not only serves as a reference for other researchers but also increases construction practitioners’ awareness of the practical benefits of implementing 3D printing technology in construction projects. Specifically, it would optimize the construction lifecycle processes, enhance digital transformation and promote sustainable construction projects.
Details
Keywords
Minh Van Nguyen and Tu Thanh Nguyen
This research aims to identify the climate for innovation variables and to propose an innovative tool to quantitatively assess the degree of climate for innovation of construction…
Abstract
Purpose
This research aims to identify the climate for innovation variables and to propose an innovative tool to quantitatively assess the degree of climate for innovation of construction firms.
Design/methodology/approach
14 climate-for-innovation variables were identified from a literature review and discussion with experienced practitioners. After that, a questionnaire survey was developed to collect data. Factor analysis was used to analyze data gathered from 157 completed responses. Then, fuzzy synthetic evaluation (FSE) was employed to assess the degree of climate for innovation in Vietnamese construction firms.
Findings
Climate-for-innovation variables were categorized into four factors by factor analysis. The FSE analysis shows leadership is the most critical category of four factors, followed by working culture, organization and employee commitment. The calculation also illustrates that the climate for innovation in Vietnamese construction firms is at a moderate level.
Originality/value
This research is one of the first integrated climate for innovation of construction firms in a comprehensive formulation. The formulation provides the decision-makers with a reliable tool to evaluate the degree of climate for innovation, thus having appropriate strategies to develop sustainable innovation performance within their organizations.
Details
Keywords
Ahmed Farouk Kineber, Ayodeji Emmanuel Oke, Ali Hassan Ali, Oluwaseun Dosumu, Kayode Fakunle and Oludolapo Ibrahim Olanrewaju
This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.
Abstract
Purpose
This study aims to explore the critical application areas of radio frequency identification (RFID) technology for sustainable buildings.
Design/methodology/approach
The quantitative research approach was adopted through a structured questionnaire administered to relevant stakeholders of construction projects. The data collected were analysed with the exploratory factor analysis, relative importance index (RII) and fuzzy synthetic evaluation (FSE).
Findings
The study’s results have categorised the crucial areas of application where construction industry stakeholders should focus their attention. These areas are divided into four categories: management technologies, production technologies, sensing technologies and monitoring technologies. The findings from the FSE indicate that monitoring technologies represent the most significant category, whereas management technologies rank as the least significant. Moreover, the RII analysis highlights that tools management stands out as the most important application of RFID, while dispute resolution emerges as the least significant RFID application.
Practical implications
The study establishes the core areas of RFID application and their benefits to sustainable buildings. Consequently, it helps stakeholders (consultants, clients and contractors) to examine the RFID application areas and make informed decision on sustainable construction. Furthermore, it provides systematic proof that can aid the implementation of RFID in developing countries.
Originality/value
The study provides an insight into the possible application areas and benefits of RFID technology in the construction industry of developing countries. It also developed a conceptual frame for the critical application areas of RFID technology in the construction industry of developing countries.
Details
Keywords
Abdullahi Babatunde Saka and Daniel W.M. Chan
Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing…
Abstract
Purpose
Building information modelling (BIM) research studies are highly contextual as the contexts provide lenses for interpreting the results. However, there has been a growing decontextualization in extant studies especially between the small and medium-sized enterprises (SMEs) and large firms; and between developed and developing countries. Albeit these contexts are all in the same construction industry, they often react differently to the same conditions. Thus, this study aims to evaluate the perceptions of firms in varying contexts of size and location on the perceived barriers to the implementation of BIM in the architecture, engineering and construction (AEC) industry.
Design/methodology/approach
The perceptions of 228 firms gleaned from 26 countries across the 6 continents were collated via an international empirical questionnaire survey. The data was analysed using the mean score, rank agreement analysis, Mann-Whitney U test and factor analysis.
Findings
The findings revealed the major factors impending BIM implementation in each of the contexts and a comparative analysis emphasized the difference in their perceptions. The findings underscore that there is a general digital divide as regard BIM implementation between the SMEs and large firms, and a deepening divide between the developed and developing countries.
Originality/value
The study has provided empirical evidence for the BIM divide in the AEC industry, which would influence the promulgation of BIM policy and transferability of best practices across varying contexts of both firm size and country level.
Details