Publication date: 18 March 2020

Kofi Agyekum, Ernest Kissi, James Cofie Danku, Godslove Ampratwum and Gideon Selorm Amegatsey

This paper aims to examine the factors that drive the career progression of construction project managers (CPM) in the Ghanaian construction industry.

Abstract

Purpose

This paper aims to examine the factors that drive the career progression of construction project managers (CPM) in the Ghanaian construction industry.

Design/methodology/approach

Based on the quantitative approach, the views of 80 CPMs working with D1 building construction firms were elicited using a structured questionnaire. Data was analysed using one-sample t-test, which was used to examine the relative significance of the variables. The mean scores, standard deviations and significance values (p-values) of each variable were used to examine the outcome of the survey.

Findings

The findings suggest that “existence of organizational support systems”, “ability to create identity”, “having an influential mentor and coach”, “accepting complicated and high visibility assignments” and “ability to gain managerial or leadership experience” are the key factors that drive the career progression of CPMs in Ghana.

Research limitations/implications

Findings from this study is limited to CPMs, specifically within the Ghanaian construction industry. This implies that with the fragmented nature of the construction industry, adopting these findings in construction settings within other countries may not yield the desired results, especially, if those countries do not share similar characteristics and context with Ghana.

Practical implications

Practically, this study highlights for the benefits of project managers (PM) (especially those in the construction industry) the key factors that drive their career progressions. Identification of these drivers offers the professionals with those factors to be prioritized when seeking to progress their careers in the construction industry.

Originality/value

Empirical research on the factors that drive the career progression of CPMs has not been fully examined in previous studies, though such studies in other sectors aside construction are prevalent. Hence, the identification of the drivers for career progression of construction PMs advances literature in the area and offers the professionals with those factors to be prioritized when seeking to progress their careers.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 12 September 2022

Kofi Agyekum, Samuel Amos-Abanyie, Victoria Maame Afriyie Kumah, Augustine Senanu Komla Kukah and Burcu Salgin

There are significantly fewer women than men in managerial positions, mainly project management. This problem is noticeable in the construction and engineering sectors…

Abstract

Purpose

There are significantly fewer women than men in managerial positions, mainly project management. This problem is noticeable in the construction and engineering sectors, traditionally male-dominated industries with leadership much dependent on masculine qualities. This study examines the obstacles to the career progression of professional female project managers (PFPMs) in the Ghanaian construction industry.

Design/methodology/approach

Twenty potential obstacles to women's career progression in the construction industry were identified from a comprehensive review of the literature. A questionnaire was prepared and administered among eighty project managers who work in large construction firms in Ghana. Data obtained were analysed using one sample t-test, Kendall's concordance test, Chi-square test and exploratory factor analysis.

Findings

The findings suggest the significance of all the twenty factors as potential obstacles to the career progression of PFPMs. The exploratory factor analysis identified five underlying grouped obstacles: “leadership and human capital related issues”, “issues related to discrimination of all forms”, “career aspiration and planning issues”, “female related role conflicts”, and “recruitment and selection issues”.

Research limitations/implications

The subjective nature of the views of the respondents could influence the evaluation of the obstacles. With this study only exploring the dimensions underlying the significant obstacles, future studies could examine the interrelationships between the various obstacles and move on to determine their impacts on the career progression of professional female PMs as well.

Practical implications

Having an in-depth understanding of these obstacles, stakeholders and other industry practitioners in Ghana could make informed decisions on measures to put in place to address some of these critical issues to raise the standard of professional female PMs in the construction industry. Policymakers and gender advocates in Ghana could also take up some of the critical obstacles identified and provide suitable strategies to educate and create the needed awareness of the industry on those obstacles. Practically, the findings from this study can be valuable for informing decision-making at different management levels in the construction industry.

Originality/value

With country-specific (Ghana) obstacles identified, the findings significantly contribute to the literature on the career advancement of females in the construction sector.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 November 2018

Marzena Baker and Erica French

The purpose of this paper is to investigate the structural career barriers in project-based construction and property development organizations in Australia, and explore how these…

1584

Abstract

Purpose

The purpose of this paper is to investigate the structural career barriers in project-based construction and property development organizations in Australia, and explore how these affect women and their project careers. It applies the insights of the institutional theory to explain how the process of normative isomorphism continues to reproduce female underrepresentation in those organizations.

Design/methodology/approach

Based on an exploratory interpretive approach, this study consisted of 16 in-depth interviews with female project managers from the Australian construction and property industry.

Findings

The research shows that organizational practices may contribute to the ongoing female underrepresentation in the Australian construction and property development industries. The structural career barriers unique to project organizations include work practice, presenteeism, reliance on career self-management and the “filtering of personnel” in recruitment and promotion practices.

Research limitations/implications

The results support the institutional theory as an explanation for the factors that influence women’s’ perceptions of their project management careers. Addressing inequity between men and women is perceived as an organizational choice.

Practical implications

To achieve a substantive change in the numbers of women in project management, organizational leaders in male dominated industries such as construction and property development are encouraged to think strategically about how to overcome the access and opportunity that affect women’s career progress.

Originality/value

Drawing on the institutional theory, this study explores how the process of normative isomorphism may reproduce female underrepresentation and gender segregation in traditional project-based organizations.

Details

Equality, Diversity and Inclusion: An International Journal, vol. 37 no. 8
Type: Research Article
ISSN: 2040-7149

Keywords

Article
Publication date: 26 July 2019

Fangwei Zhu, Mengtong Jiang and Miao Yu

The challenge of unforeseen uncertainties in exploratory projects requires the lead firm in a project alliance to effectively manage exploratory co-innovation. The purpose of this…

Abstract

Purpose

The challenge of unforeseen uncertainties in exploratory projects requires the lead firm in a project alliance to effectively manage exploratory co-innovation. The purpose of this paper is to investigate the types of capabilities a lead firm required in exploratory projects and how these capabilities enable the exploratory innovation of the project alliance.

Design/methodology/approach

A multiple-case study was done to provide empirical evidence for the rationale of the capabilities of the lead firm. The provided analysis used abductive reasoning of two typical exploratory projects in China.

Findings

This paper identifies two types of capabilities: innovation-related capabilities and network-related capabilities. Furthermore, a process model of the capabilities of the lead firm is developed that enables exploratory co-innovation in a project alliance. The capabilities of the lead firm input varied at four different stages.

Practical implications

Innovation-related capabilities and network-related capabilities could form the foundation for the lead firm in an exploratory project alliance. This will enable an exploratory co-innovation and collaboratively overcome the barriers of exploratory projects.

Originality/value

Although exploratory project attracts extensive attention for its unique characteristics and universal value, there is limited amount of research on the context of joint exploratory projects. This study starts from the role of lead firm in an exploratory project alliance, contributes toward the comprehension of the link between the lead firm’s capabilities and the process of exploratory co-innovation. The findings will be of value in supporting the management of exploratory innovation in a project alliance.

Details

International Journal of Managing Projects in Business, vol. 13 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 3 May 2024

Maria Cleofe Giorgino and Federico Barnabè

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the…

Abstract

Purpose

Drawing motivation from the greater exposure to uncertainty and condition changes that affect large projects due to their long lifecycle, this paper aims to investigate how the time factor affects the use of governance mechanisms to pursue the success of these projects.

Design/methodology/approach

To pursue its aim, the article applies the dichotomization between the hard and soft mechanisms of project governance to the analysis of a historical case study, whose findings are organized over the short, medium and long periods. The case selected is referred to the peculiar water system, made up of tunnels named “bottini,” that was in use in Siena (Italy) as the old aqueduct. Specifically, the study focuses on the project of expansion of this water system that was realized during the 14th century for the construction of the “Bottino maestro di Fontegaia.”

Findings

This article highlights the different relevance that, during the lifecycle of large projects, is assumed by hard and soft governance mechanisms, with the former having main relevance in a short and medium period, and the latter usually emerging in the medium period and, subsequently, playing a growing role for the project success in the long period.

Originality/value

The article contributes to the literature on large projects by providing novel insights about how the time factor impacts the governance of these projects. Furthermore, the case study, with its unique history, highlights the relevance of combining effectively the hard and the soft dimensions of project governance to pursue success.

Details

Journal of Management History, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1751-1348

Keywords

Article
Publication date: 15 September 2022

Chris Simms and Paul Trott

The purpose of this paper is to examine how firms manage the front end of new product development projects where packaging forms a core part of the product itself. Within the…

Abstract

Purpose

The purpose of this paper is to examine how firms manage the front end of new product development projects where packaging forms a core part of the product itself. Within the fast-moving consumer goods industry, innovation provides opportunities to create packaging that forms an integrated part of the product offering. The authors refer to these as packaging-integrated-products. This study conceptualises three levels of integration and investigates how they impact upon the management of the front end.

Design/methodology/approach

The study consisted of a two-phase design. This involved a preliminary study with key informants, followed by a multiple case study design, which examines product development projects with differing extents of packaging integration.

Findings

The results identify nine different new product opportunities. The authors also present 11 propositions that reveal the key characteristics of the front end of packaging-integrated development projects, as well as the project management requirements to capture the opportunities they present.

Research limitations/implications

Initial insights into a number of unique front-end project management characteristics required to deliver different project types form an area for further research to better understand product packaging integration. The propositions presented guide the way forward for future studies.

Practical implications

The findings provide marketers with new understanding of three types of new product opportunities presented by packaging integration and demonstrate what is required to capture the opportunities they present in the front end of product development.

Originality/value

The paper contributes to extant studies of packaging development in the marketing literature, which have previously failed to capture the high levels of integration between packaging and the product. The authors present a new conceptual approach to understanding integration and subsequently uncover how the opportunities it presents can be captured.

Details

European Journal of Marketing, vol. 56 no. 8
Type: Research Article
ISSN: 0309-0566

Keywords

Article
Publication date: 6 July 2020

Andrew Kamunda, Suresh Renukappa, Subashini Suresh and Haddy Jallow

The UK water industry is a private sector that has no government mandate to implement building information modelling (BIM) but would benefit from its use. Research has identified…

Abstract

Purpose

The UK water industry is a private sector that has no government mandate to implement building information modelling (BIM) but would benefit from its use. Research has identified that fragmentation and inefficiency still existed in the water industry project delivery processes. These issues can be addressed by harnessing the collaboration that BIM brings by using emerging information technology. The UK water industry has had little research in the use of BIM in the project delivery processes over the years.

Design/methodology/approach

The aim of the research is to explore and examine BIM elements currently used in the water industry, as well as understand the organisational cultural support for BIM. It also investigated the adoption of BIM which will enable to improve water industry project delivery processes. An empirical study was performed in the UK given the relatively new and unexplored nature of the research problem, a qualitative research methodology was adopted. In total, 14 semi-structured interviews from six water sector organisations were conducted to collect data, which was then analysed using thematic analysis for inference and conclusion.

Findings

The study identified that BIM has already changed how projects are delivered by the water companies and their supply chain. Use of emerging technology such as Autodesk Revit, Civil 3D and virtual reality has gained traction and is leading organisations to continue investing in these areas to remain relevant. Although staff training was offered by all organisations within the study cohort, some interviews still thought that more can be done by their organisations as BIM is still maturing. Those interviewed regarded BIM models as data and information rich with the ability to enable the supply chain to obtain quicker approvals.

Originality/value

The paper provides a richer insight into the understanding and awareness of BIM elements used in the water industry to improve project delivery processes. This study suggests that the water industry supply chain has taken positive steps and started to benefit from BIM use. It also recommends that there is a need for cross-sector collaboration to capture and share best and worst practices relating to BIM adoption in the water sector.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 June 2021

Nikdokht Ghadiminia, Mohammad Mayouf, Sharon Cox and Jan Krasniewicz

Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of…

Abstract

Purpose

Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of the facility. A cyber-attack incurs adverse implications for the facility and its managing organisation. Hence, this paper aims to unravel the impact of a cybersecurity breach, by developing a BIM-facilities management (FM) cybersecurity-risk-matrix to portray what a cybersecurity attack means for various working areas of FM.

Design/methodology/approach

This study commenced with exploring cybersecurity within various stages of a BIM project. This showcased a heightened risk of cybersecurity at the post-occupancy phase. Hence, thematic analysis of two main domains of BIM-FM and cybersecurity in the built environment led to the development of a matrix that illustrated the impact of a cybersecurity attack on a BIM-FM organisation.

Findings

Findings show that the existing approaches to the management of cybersecurity in BIM-FM are technology-dependent, resulting in an over-reliance on technology and a lack of cybersecurity awareness of aspects related to people and processes. This study sheds light on the criticality of cyber-risk at the post-occupancy phase, highlighting the FM areas which will be compromised as a result of a cyber-attack.

Originality/value

This study seeks to shift focus to the people and process aspects of cybersecurity in BIM-FM. Through discussing the interconnections between the physical and digital assets of a built facility, this study develops a cyber-risk matrix, which acts as a foundation for empirical investigations of the matter in future research.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 15 July 2022

Susanne Leitner-Hanetseder and Othmar M. Lehner

With the help of “self-learning” algorithms and high computing power, companies are transforming Big Data into artificial intelligence (AI)-powered information and gaining…

5385

Abstract

Purpose

With the help of “self-learning” algorithms and high computing power, companies are transforming Big Data into artificial intelligence (AI)-powered information and gaining economic benefits. AI-powered information and Big Data (simply data henceforth) have quickly become some of the most important strategic resources in the global economy. However, their value is not (yet) formally recognized in financial statements, which leads to a growing gap between book and market values and thus limited decision usefulness of the underlying financial statements. The objective of this paper is to identify ways in which the value of data can be reported to improve decision usefulness.

Design/methodology/approach

Based on the authors' experience as both long-term practitioners and theoretical accounting scholars, the authors conceptualize and draw up a potential data value chain and show the transformation from raw Big Data to business-relevant AI-powered information during its process.

Findings

Analyzing current International Financial Reporting Standards (IFRS) regulations and their applicability, the authors show that current regulations are insufficient to provide useful information on the value of data. Following this, the authors propose a Framework for AI-powered Information and Big Data (FAIIBD) Reporting. This framework also provides insights on the (good) governance of data with the purpose of increasing decision usefulness and connecting to existing frameworks even further. In the conclusion, the authors raise questions concerning this framework that may be worthy of discussion in the scholarly community.

Research limitations/implications

Scholars and practitioners alike are invited to follow up on the conceptual framework from many perspectives.

Practical implications

The framework can serve as a guide towards a better understanding of how to recognize and report AI-powered information and by that (a) limit the valuation gap between book and market value and (b) enhance decision usefulness of financial reporting.

Originality/value

This article proposes a conceptual framework in IFRS to regulators to better deal with the value of AI-powered information and improve the good governance of (Big)data.

Details

Journal of Applied Accounting Research, vol. 24 no. 2
Type: Research Article
ISSN: 0967-5426

Keywords

Article
Publication date: 1 June 2004

John Maynard and Vikki Smith

Modern Apprenticeships (MAs) have been criticised in some quarters (in 2002, only 40 per cent of work‐based learning (WBL) providers were deemed adequate). Things are improving…

1517

Abstract

Modern Apprenticeships (MAs) have been criticised in some quarters (in 2002, only 40 per cent of work‐based learning (WBL) providers were deemed adequate). Things are improving but there is still much to be done. This paper addresses this issue. Support for Success, a Learning and Skills Development Agency quality improvement programme funded by the Learning and Skills Council, commissioned a small number of action research projects in 2002, with the aim of improving learner outcomes. Of those projects, 12 sought practical ways of promoting achievement and progression in WBL to respond to the government directive of securing progression and the attainment of targets in the WBL arena. The paper provides an overview of the issues associated with 14‐19‐year‐old vocational education and training, before addressing aspects of retention and achievement in modern apprentice programmes. Drawing on 12 projects, different approaches to improving success in MAs are explored.

Details

Education + Training, vol. 46 no. 5
Type: Research Article
ISSN: 0040-0912

Keywords

1 – 10 of over 14000