Publication date: 9 November 2021

Masoud Zavari and Mohammad Reza Afshar

In the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is…

Abstract

Purpose

In the construction industry, site managers are responsible for the day-to-day on-site running of a project. Site managers are required not only to ensure that work is done safely, on time, within budget and to the right quality standards, but also to manage any delays or problems encountered on-site during a construction project. Thus, a site manager has a significant position in the success of a construction project. However, there is a lack of studies considering the role of the leadership style of a site manager in construction project success. In this study, not only the effect of the transformational leadership (TL) style of site managers on the success of construction projects is assessed, but also the mediating role of team-building (TB) and team innovation between TL and project success is studied.

Design/methodology/approach

The proposed hypotheses are tested by comparing the performance criteria of construction projects with the TL style of site managers. The success criteria of the projects are examined using project documents and client opinions, and the TL of site managers, TB aspects and team innovation in projects are assessed by asking from their subordinates. The Pearson correlation coefficient is employed to investigate the relation between every two variables.

Findings

The results illustrate that the TL of a site manager is directly related to project success; thus, the findings would confirm the importance of selecting appropriate site managers for construction projects. Moreover, while there is a mediating role of TB between TL and construction project success, team innovation does not have a mediating impact in design-bid-build (DBB) construction projects.

Originality/value

As there is a lack of studies assessing the TL effects on the success of construction projects and the significant role of site managers, this study is one of the first researches that tested these impacts and evaluated the mediating role of TB and team innovation between TL and project performance.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Click here to view access options
Article
Publication date: 27 September 2021

Tirivavi Moyo and Benviolent Chigara

Increased construction risk due to the complexity and numerous construction performance challenges requires improved construction project managers’ competence. However…

Abstract

Purpose

Increased construction risk due to the complexity and numerous construction performance challenges requires improved construction project managers’ competence. However, contextual interrogation of these competencies is limited. This paper aims to report on a study that sought to determine the expected competencies of construction project managers and assesses the existence of statistically significant differences due to gender, designation and educational levels of respondents.

Design/methodology/approach

A quantitative research design was instituted through the administration of a questionnaire survey on Project Managers, Architects, Engineers and Quantity surveyors working for consultants and contractors’ organizations. Descriptive and inferential statistics analysed significant differences due to demographic variables. Factor analysis was also used to reveal interrelated significant sets of competencies expected of construction project managers.

Findings

Factor analysis determined 11 significant components with the highest-ranked components comprising organizational savvy and experience in managing project constraints. The univariate analysis determining effective communication, leadership and good team-building skills as being the three most critical expected competencies. Significant differences due to educational levels were established, with shortcomings existing in those with Diplomas.

Research limitations/implications

The higher education institutions need to establish curricula designs that align with the competency expectations. Mentorship programmes within construction organizations can also be significant in bridging the existing competence gap. However, due to the exploratory nature of the study, the insights of clients were not considered.

Originality/value

The study determined competencies for construction project managers and demographic-specific interventions.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Click here to view access options
Article
Publication date: 27 September 2021

Samrakshya Karki and Bonaventura Hadikusumo

Project manager’s competency is crucial in the construction sector for the successful completion of projects, particularly in the case of developing countries like Nepal…

Abstract

Purpose

Project manager’s competency is crucial in the construction sector for the successful completion of projects, particularly in the case of developing countries like Nepal. Therefore, it is very essential to select competent project managers by finding the competency factors required by them. Hence, this study aims to identify the characteristics of competent project managers by expert opinion method and to evaluate their competency level by a questionnaire survey to develop a prediction model using a supervised machine learning approach via Waikato Environment for Knowledge Analysis (WEKA), a machine learning tool which predicts Project manager’s performance as “Higher than expected,” “Expected” or “Lower than expected” for the medium complexity construction projects of Nepal (from US$200,000 up to US$10M).

Design/methodology/approach

The data collection procedure for this research is based on an expert opinion method and survey. Expert opinion method is conducted to find the characteristics of a competent project manager by validating the top 15 competency factors based on literature review. The survey is conducted with the top management to assess their project manager’s competency level. Both qualitative and quantitative approaches are used to collect data for classification and prediction in WEKA, a machine learning tool.

Findings

The results illustrate that the project managers in Nepal have a high score in leadership skills, personal characteristics, team development and delegation, communication skills, technical skills, problem-solving/coping with situation skills and stakeholder/relationship management skills. Furthermore, among the seven classifiers (naïve Bayes, sequential minimal optimization [SMO], multilayer perceptron, logistic, KStar, J48 and random forest), the accuracy given by the SMO algorithm is highest of all in both the percentage split and k-folds cross validation method. The model developed using SMO classifier by k-folds cross-validation (k = 10) is acknowledged as a final model.

Research limitations/implications

This research focuses to develop a prediction model to predict and analyze the competency of project managers by applying a supervised machine learning approach. Seven extensively used algorithms (Naïve Bayes, SMO, multilayer perceptron, logistic, KStar, J48, random forest) are used to check the accuracy of models and an algorithm that gives the highest accuracy is adopted. Data collection for this research is carried out by expert opinion method to validate the characteristics (factors) essential for competent project managers in the first round and the description of each factor as high, medium and low is inquired with the same experts in the second round. After an expert opinion, a structured questionnaire is prepared for the survey to assess the competency level of project managers (PMs). The competency level of PMs working under government funded, foreign aided or private projects from the contractor’s side is measured. This research is limited to the medium scale construction projects of Nepal.

Practical implications

This model can be a huge asset in the human resource department of construction companies as it helps to know the performance level of project managers in terms of “Higher than expected,” “Expected” or “Lower than expected” for the medium complexity construction projects of Nepal. Also, the model will assist human intelligence to make the decision while recruiting a new project manager/s for different types of projects at a time. Moreover, the model can be used for self-assessment of project manager/s to know their performance level. The model can be used to develop a user friendly interface system or an application such that it can be conveniently used anywhere any time.

Social implications

This research shows that most of the project managers working in a medium complexity construction project of Nepal are male, maximum of them hold bachelor’s degree and study for road projects. Furthermore, most of the project managers scored high in leadership skills, personal characteristics, communication skills, technical skills, problem-solving/coping with situation skills, team development and delegation and stakeholder/relationship management skills. The model has given the “Personal characteristics” attribute the highest weightage. Likewise, other attributes having high weightage are communication skills, analytical abilities, project budget, stakeholder/relationship management, team development and delegation and time management skills.

Originality/value

This research was conducted to find the competency factors and to study the competency level of project managers in Nepal to develop a prediction model to predict the PM’s performance using a machine learning approach in medium scale construction projects. There is a lack of research to develop a model that predicts project manager’s competency using the machine learning approach. Therefore, the predictive model developed here helps in the identification of a competent project manager as it will be advantageous for project completion with a high success rate.

Click here to view access options
Article
Publication date: 1 July 2014

Julius Ayodeji Fapohunda

The purpose of this paper is to delineate different types of site manager attributes that significantly contribute to construction project management efficiency and…

Abstract

Purpose

The purpose of this paper is to delineate different types of site manager attributes that significantly contribute to construction project management efficiency and evaluate the factors that hinder the site manager during construction production processes. Towards efficient resources utilisation, site managers require various qualities and potentials.

Design/methodology/approach

To achieve valid result, the research study was triangulated by exploring literature, which was augmented with both quantitative questionnaire and qualitative interview research methods. The research data were collected in the UK building industry.

Findings

It was found that the barriers that often affect efficient utilisation of construction resources in the industry are poor communication, disagreement, misunderstandings, bad weather, union strikes and construction participants’ personality conflicts. This research study presents severity of site manager’s hindrances, factors that affect site manager’s efficiencies, solutions to minimise the hindrances on site manager’s efficient performance and factors that should be constant towards site mangers’ efficient performance. Among these solutions found evident that will enhance site managers’ performance and minimise the effect of the hindrances are an enhanced planning and adequate programming of construction resources before and during project execution, rational team building and an efficient construction team for project, in addition to adequate information dissemination and transfer of knowledge.

Originality/value

The adequate implementation of the solutions presented in this paper will not only enhance the performance of site managers on resources utilisation but will also augment client satisfactions.

Details

Journal of Engineering, Design and Technology, vol. 12 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

Click here to view access options
Article
Publication date: 4 April 2016

Michelle Turner and Anthony Mariani

The purpose of this paper is to explore the work-family experience of projects managers working in the construction industry, and identify how they manage their…

Downloads
2849

Abstract

Purpose

The purpose of this paper is to explore the work-family experience of projects managers working in the construction industry, and identify how they manage their work-family interface.

Design/methodology/approach

Structured interviews were conducted with nine construction project managers working in the commercial sector, and data were subject to thematic analysis.

Findings

Role conditions were found to impact on participants’ work-family interface, identified as working hours, accountability, and the stress arising from accountability. Participants identified four key strategies used to manage their work-family interface: managing work-based stress, having a supportive partner, prioritising non-work time for family, and trading off activities. Despite having to limit time with family and trade off social and leisure activities, participants did not report negative work-to-family spillover. All participants shared a passion for their work. Findings can be explained using the heavy worker investment model, which proposes that job devotion is linked to psychological well-being, decreases in work-family conflict (WFC), and work satisfaction.

Originality/value

Contrary to previous research, findings suggest that construction project managers did not experience inter-role conflict between their work and family domains. It is recommended that further research explore these findings using the heavy work investment (HWI) framework which considers how internal and external predictors shape workers’ behaviour, and whether HWI typologies moderate the experience of WFC.

Details

International Journal of Managing Projects in Business, vol. 9 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Click here to view access options
Article
Publication date: 16 April 2018

Mohammed Shurrab, Ghaleb Abbasi and Razan Al Khazaleh

Construction organizations and companies are concerned with the motivational factors of the project managers that influence the project success. Therefore, the purpose of…

Abstract

Purpose

Construction organizations and companies are concerned with the motivational factors of the project managers that influence the project success. Therefore, the purpose of this paper is to use a questionnaire based on five Likert-scales to identify and investigate the importance of the motivational dimensions on the construction project managers in Jordan

Design/methodology/approach

Therefore, this study aims at using a questionnaire based on five Likert-scales to identify and investigate the importance of the motivational dimensions on the construction project managers in Jordan. The six motivational dimensions were interpersonal interaction, task, general working conditions, empowerment, personal development, and compensation. Hypotheses testing were also developed to study the influence of both the characteristics of the project manager and the characteristic of the project on the motivational dimensions.

Findings

The results showed that the construction project managers in Jordan were motivated more by compensation and personal development. Moreover, the level of education for the project manager was positively related to the motivation by task. It was also noticed that the project manager, who had higher experience, was motivated more by empowerment. The study is valuable in providing important information for the construction organizations in Jordan to actively influence the construction project managers’ motivation.

Originality/value

The urgent needs for increasing project managers’ motivation is the major concern for organizations and companies. Increasing the project managers’ motivation has a major influence on increasing the project success rate and productivity. Construction sector is typically country’s most important asset economically and socially. Currently, no studies were shown to investigate the construction project manager’s motivation in Jordan. This study is, therefore, aims to evaluate the factors that influence the construction project manager’s motivation in Jordan based on content and process motivational theories’ perspectives. This research also utilizes the motivational factors instrument to test its validity in Jordan construction sector.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Click here to view access options
Article
Publication date: 4 November 2014

Abdulaziz M. Jarkas, Milan Radosavljevic and Liu Wuyi

An extensive search of the literature revealed a dearth of research on the demotivational factors affecting the performance and productivity level of site-based…

Downloads
2042

Abstract

Purpose

An extensive search of the literature revealed a dearth of research on the demotivational factors affecting the performance and productivity level of site-based construction project managers. Following the announcement of awarding the FIFA 2022 World Cup hosting rights to the State of Qatar, the State is pledging to spend tens of Billions of Dollars on hundreds of new construction projects. Therefore, the purpose of this paper is to identify, explore, and rank the relative importance of the demotivational factors influencing the productivity of the State's construction management force.

Design/methodology/approach

A structured questionnaire survey comprising 38 potential demotivational factors, which were shortlisted based on relevant previous studies on the impact of motivation on construction productivity, and numerous interviews with local industry professionals, was distributed to a relatively large sample of site-resident project managers. Using the “Relative Importance Index” technique, the influence ranks of the factors explored were determined.

Findings

The results obtained reveal the following as the prominent demotivational factors influencing the productivity of construction project managers: lack of financial incentive schemes; slow decision-making process by owners; remuneration scale; delay in responding to Requests For Information (RFI); shortage of skilled labour force; shortage of materials; clarity and completeness of technical specifications; frequent changing orders during execution; drawings quality level; and rework.

Research limitations/implications

It is clear, based on the outcomes, that the cultural background of individuals, and the prevalent practices within the environment in which they operate, are two critical factors in determining their motivation drivers. Hence, it is prudent to explore the dominant culture and values of the management workforce, in addition to the characteristics of the working environment, before trying to apply relevant motivational theories, or even implement new management strategies.

Practical implications

The results demonstrate that, within the geographical setting and cultural aspects of the sample surveyed, “tributes” and “pecuniary” may be interpreted to have the largest effect on the productivity of construction project managers.

Originality/value

The findings not only contribute to the overall body of knowledge related to the effect of the motivation phenomenon on the productivity of the construction operation, but can also be used to provide industry practitioners with guidance for focusing, acting upon, and controlling the significant demotivational factors affecting the efficiency of the construction project management force practicing in State.

Details

International Journal of Productivity and Performance Management, vol. 63 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Click here to view access options
Article
Publication date: 16 March 2021

Guofeng Ma, Shan Jiang and Ding Wang

Although social media has been increasingly applied and valued in the construction industry, there has been little evidence revealing the influence mechanism of social…

Abstract

Purpose

Although social media has been increasingly applied and valued in the construction industry, there has been little evidence revealing the influence mechanism of social media use in the construction context. In this way, this paper aims to explore how different purposes of social media use affect project performance from a project manager's perspective.

Design/methodology/approach

Drawing on the mechanism–outcome–performance framework, this paper developed a research model to figure out the mechanism through which work-oriented and socialization-oriented social media use influences construction project performance. The empirical data were collected from a survey of 249 construction project managers, and the structural equation modeling technique was applied to test the proposed model.

Findings

Results indicate that both work-oriented and socialization-oriented social media use promote knowledge acquisition and project social capital, which both further positively impact the project performance. Additionally, the negative moderating role of information overload is identified on the relationship between social media use and knowledge acquisition.

Originality/value

This study fulfills the need for an in-depth investigation of social media use on construction project performance, contributing to the project management and social media literature. Furthermore, this study provides recommendations for project managers to advance social media applications in the construction domain.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Click here to view access options
Article
Publication date: 15 February 2021

Georgios Kapogiannis, Terence Fernando and Ahmed Mohammed Alkhard

Many aspects of social behaviour are manifested in project managers in interaction with team members in the construction sector. Proactive behaviour as a social behaviour…

Abstract

Purpose

Many aspects of social behaviour are manifested in project managers in interaction with team members in the construction sector. Proactive behaviour as a social behaviour impacts on project and organizational effectiveness. This paper aims to explore and explain how project managers’ proactive behaviour could be enhanced in a project by the use of integrated collaborative environments. The paper aims to discuss these issues.

Design/methodology/approach

To investigate this interrelationship, researchers used a survey methodology involving gathering both quantitative and qualitative data, and used regression analysis to assess the strength of impact of proactive behaviour antecedents on project manages’ performance on a construction project when using integrated collaborative technologies. For the qualitative data, researchers used content analysis.

Findings

The research showed that by developing a proactive personality, the construction project manager is more likely to pre-identify “accurately” project time and costs, and to identify project culture, collaboration strategy and project risks. Moreover, co-worker trust as a proactive behaviour antecedent has been shown to impact on raising quality issues in a project. Furthermore, project managers’ flexibility could assist them in designing procurement strategies as well as designing a project business plan and avoiding conflict. Nevertheless, flexibility, including self-efficacy, control appraisal, change orientation, job autonomy and supportive supervision, plays a significant role in the development of proactive behaviour in construction project managers and enhances project performance.

Research limitations/implications

The sample is limited, but the research methodology is acceptable because the authors use mixed approach to check the correlation.

Practical implications

How project managers can use integrated collaborative technologies on developing their proactive behaviour and thus impacting project performance is observed.

Originality/value

The value of this paper is to contribute understanding of the impact of the use of integrated collaborative technologies on developing project managers’ proactive behaviour and thus impacting project performance.

Click here to view access options
Article
Publication date: 18 March 2020

Kofi Agyekum, Ernest Kissi, James Cofie Danku, Godslove Ampratwum and Gideon Selorm Amegatsey

This paper aims to examine the factors that drive the career progression of construction project managers (CPM) in the Ghanaian construction industry.

Abstract

Purpose

This paper aims to examine the factors that drive the career progression of construction project managers (CPM) in the Ghanaian construction industry.

Design/methodology/approach

Based on the quantitative approach, the views of 80 CPMs working with D1 building construction firms were elicited using a structured questionnaire. Data was analysed using one-sample t-test, which was used to examine the relative significance of the variables. The mean scores, standard deviations and significance values (p-values) of each variable were used to examine the outcome of the survey.

Findings

The findings suggest that “existence of organizational support systems”, “ability to create identity”, “having an influential mentor and coach”, “accepting complicated and high visibility assignments” and “ability to gain managerial or leadership experience” are the key factors that drive the career progression of CPMs in Ghana.

Research limitations/implications

Findings from this study is limited to CPMs, specifically within the Ghanaian construction industry. This implies that with the fragmented nature of the construction industry, adopting these findings in construction settings within other countries may not yield the desired results, especially, if those countries do not share similar characteristics and context with Ghana.

Practical implications

Practically, this study highlights for the benefits of project managers (PM) (especially those in the construction industry) the key factors that drive their career progressions. Identification of these drivers offers the professionals with those factors to be prioritized when seeking to progress their careers in the construction industry.

Originality/value

Empirical research on the factors that drive the career progression of CPMs has not been fully examined in previous studies, though such studies in other sectors aside construction are prevalent. Hence, the identification of the drivers for career progression of construction PMs advances literature in the area and offers the professionals with those factors to be prioritized when seeking to progress their careers.

Details

Journal of Engineering, Design and Technology , vol. 18 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 10 of over 37000