1 – 10 of over 1000
Article
Publication date: 12 July 2023

Augustine Senanu Komla Kukah, De-Graft Owusu-Manu, Edward Badu, David J. Edwards and Eric Asamoah

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide…

Abstract

Purpose

Public-private partnership (PPP) power projects are associated with varying risk factors. This paper aims to develop a fuzzy quantitative risk allocation model (QRAM) to guide decision-making on risk allocation in PPP power projects in Ghana.

Design/methodology/approach

A total of 67 risk factors and 9 risk allocation criteria were established from literature and ranked in a two-round Delphi survey using questionnaires. The fuzzy synthetic evaluation method was used in developing the risk allocation model.

Findings

The model’s output variable is the risk allocation proportions between the public body and private body based on their capability to manage the risk factors. Out of the 37 critical risk factors, the public sector was allocated 12 risk factors with proportions = 50%, while the private sector was allocated 25 risk factors with proportions = 50%.

Originality/value

To the best of the authors’ knowledge, this research presents the first attempt in Ghana at endeavouring to develop a QRAM for PPP power projects. There is confidence in the model to efficiently allocate risks emanating from PPP power projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 9 February 2024

Runze Yu and Li Ma

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has…

138

Abstract

Purpose

The paper covers mega infrastructure construction supply chain (MICSC) in Engineering-Procurement-Construction (EPC) projects, where the frequent occurrence of risk incidents has greatly affected human life. The research aims to establish a risk evaluation index system for MICSC in EPC projects, exploring what risk factors lead to risk incidents and measure the importance and causality of all these risk factors.

Design/methodology/approach

The research applies a combination of quantitative and qualitative analysis methodology to process data sequentially. In the first place, risk factors for MICSC in EPC projects are extracted and identified from literature survey and expert interviews. In the second place, an integration model fuzzy Analytic Hierarchy Process (f-AHP) and fuzzy Decision-making Trial and Evaluation Laboratory (f-DEMATEL) is constructed to comprehensively analyze all these risk factors.

Findings

12 primary risk factors and 36 secondary risk factors comprise the risk evaluation index system for MICSC in EPC projects from 178 literature and 5 professionals. The results indicate that Political Situation (F1), Social Security (F2) and Management Mode (F8) are critical risk factors, where F1 and F2 are cause factors and F8 is an effect factor.

Originality/value

There are three main contributions of this paper. First and foremost, from the perspective of the research content, no other study has been able to assess risk factors for MICSC in EPC projects, while embedding nine phases of the whole project life cycle and six subjects of stakeholders into a risk evaluation index system. Additionally, from the perspective of research method, a combined model incorporating f-AHP and f-DEMATEL is constructed to avoid the one-sidedness of a single model. Last but not least, from the perspective of practical significance, focusing on the critical risk factors, a series of effective measures are formulated to make appropriate management decisions for nodal enterprises of MICSC, which can improve their risk management capabilities.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 October 2023

Bianca Arcifa de Resende, Franco Giuseppe Dedini, Jony Javorsky Eckert, Tiago F.A.C. Sigahi, Jefferson de Souza Pinto and Rosley Anholon

This study aims to propose a facilitating methodology for the application of Fuzzy FMEA (Failure Mode and Effect Analysis), comparing the traditional approach with fuzzy…

Abstract

Purpose

This study aims to propose a facilitating methodology for the application of Fuzzy FMEA (Failure Mode and Effect Analysis), comparing the traditional approach with fuzzy variations, supported by a case application in the aeronautical sector.

Design/methodology/approach

Based on experts' opinions in risk analysis within the aeronautical sector, rules governing the relationship between severity, occurrence, detection and risk factor were defined. This served as input for developing a fuzzyfied FMEA tool using the Matlab Fuzzy Logic Toolbox. The tool was applied to the sealing process in a company within the aeronautical sector, using triangular and trapezoidal membership functions, and the results were compared with the traditional FMEA approach.

Findings

The results of the comparative application of traditional FMEA and fuzzyfied FMEA using triangular and trapezoidal functions have yielded valuable insights into risk analysis. The findings indicated that fuzzyfied FMEA maintained coherence with the traditional analysis in identifying higher-risk effects, aligning with the prioritization of critical failure modes. Additionally, fuzzyfied FMEA allowed for a more refined prioritization by accounting for variations in each variable through fuzzy rules, thereby improving the accuracy of risk analysis and providing a more realistic representation of potential hazards. The application of the developed fuzzyfied FMEA approach showed promise in enhancing risk assessment in the aeronautical sector by considering uncertainties and offering a more detailed and context-specific analysis compared to conventional FMEA.

Practical implications

This study emphasizes the potential of fuzzyfied FMEA in enhancing risk assessment by accurately identifying critical failure modes and providing a more realistic representation of potential hazards. The application case reveals that the proposed tool can be integrated with expert knowledge to improve decision-making processes and risk mitigation strategies within the aeronautical industry. Due to its straightforward approach, this facilitating methodology could also prove beneficial in other industrial sectors.

Originality/value

This paper presents the development and application of a facilitating methodology for implementing Fuzzy FMEA, comparing it with the traditional approach and incorporating variations using triangular and trapezoidal functions. This proposed methodology uses the Toolbox Fuzzy Logic of Matlab to create a fuzzyfied FMEA tool, enabling a more nuanced and context-specific risk analysis by considering uncertainties.

Details

International Journal of Quality & Reliability Management, vol. 41 no. 4
Type: Research Article
ISSN: 0265-671X

Keywords

Article
Publication date: 29 March 2024

Ibrahim Yahaya Wuni

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of…

Abstract

Purpose

Sustainable construction re-engineers the conventional project lifecycle to integrate sustainability solutions. The additional sustainability requirements introduce new layers of complexity, challenges and risks that if unaddressed, can derail the gains in sustainable construction projects. This study developed a multidimensional risk assessment model for sustainable construction projects in the United Arab Emirates (UAE).

Design/methodology/approach

The research activities a comprised comprehensive literature review to shortlist relevant risks, an analysis of the probability – impact rating of the shortlisted risks – and the development of a risk assessment model for SC projects in the UAE. The model is developed based on the multicriteria framework and mathematical formulation of the fuzzy synthetic evaluation approach.

Findings

The developed model quantified the overall risk level in sustainable construction projects to be 3.71 on a 5-point Likert scale, indicating that investment in SC projects in the UAE is risky and should be carefully managed. The developed model further revealed that each of the risk groups, comprising management (3.82), technical (3.78), stakeholder (3.68), regulatory (3.66), material (3.53) and economic risks (3.502), presents a significant threat to realizing outcomes typical of SC projects.

Originality/value

This study developed a multidimensional risk assessment model capable of objectively quantifying the overall risk level and provides decision support to project teams to improve risk management in sustainable construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 September 2023

Behzad Paryzad and Kourosh Eshghi

This paper aims to conduct a fuzzy discrete time cost quality risk in the ambiguous mode CO2 tradeoff problem (FDTCQRP*TP) in a megaproject based on fuzzy ground.

Abstract

Purpose

This paper aims to conduct a fuzzy discrete time cost quality risk in the ambiguous mode CO2 tradeoff problem (FDTCQRP*TP) in a megaproject based on fuzzy ground.

Design/methodology/approach

A combinatorial evolutionary algorithm using Fuzzy Invasive Weed Optimization (FIWO) is used in the discrete form of the problem where the parameters are fully fuzzy multi-objective and provide a space incorporating all dimensions of the problem. Also, the fuzzy data and computations are used with the Chanas method selected for the computational analysis. Moreover, uncertainty is defined in FIWO. The presented FIWO simulation, its utility and superiority are tested on sample problems.

Findings

The reproduction, rearrangement and maintaining elite invasive weeds in FIWO can lead to a higher level of accuracy, convergence and strength for solving FDTCQRP*TP fuzzy rules and a risk ground in the ambiguous mode with the emphasis on the necessity of CO2 pollution reduction. The results reveal the effectiveness of the algorithm and its flexibility in the megaproject managers' decision making, convergence and accuracy regarding CO2 pollution reduction.

Originality/value

This paper offers a multi-objective fully fuzzy tradeoff in the ambiguous mode with the approach of CO2 pollution reduction.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 6 September 2022

Murat Cevikbas, Ozan Okudan and Zeynep Işık

The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction…

Abstract

Purpose

The purpose of this paper is to propose a disruption claim management (DCM) life cycle and a risk management framework to provide comprehensive guidance to construction practitioners for facilitating effective and efficient DCM.

Design/methodology/approach

DCM life cycle was initially developed through a focus group discussion (FGD) with the participation of the construction practitioners who have diverse experiences about DCM. The life cycle is comprised of 6 phases and also includes proper reactions of the owners and contractors. Then, 42 risk factors that can impact the deliverables of DCM were identified through a literature review and an additional FGD session. This was then followed by a Fuzzy Analytical Hierarchy Process (FAHP) which was performed to evaluate the importance of each risk factor in terms of the factor's impact on the success of DCM. Additionally, consistency analysis was performed to further maximize the reliability of the results.

Findings

Findings revealed that a proactive and systematic approach should be adopted and DCM practices should be initiated before any disruption event is triggered. Accordingly, the proposed framework recommends DCM practices to be initiated early in the contract development phase since compensation for the disruption might be recovered only to the extent that the contract permits. The contract-related risks were given top priority by the experts so that the results of the fuzzy AHP analysis also verified the significance of the contract development phase. Besides contract-related risks, risks related to insufficient site observation, ignorance of the project team, cognitive bias and conflict of interest were determined as the most significant DCM risks, needing an urgent and sophisticated risk response plan. Lastly, results suggested that “Site observation and record-keeping” is the most formidable phase since the phase's implementation on a continuous basis could create unforeseen organizational challenges such as mismanagement of project records, especially in the dynamic and turbulent environment of the construction projects.

Originality/value

Disruption – which is caused mostly by change – is inevitable in construction projects due to their sophisticated nature. DCM, therefore, becomes crucial to compensate losses of contractors and eliminate or diminish the prolonged dispute resolution process. Existing studies, however, do not provide a comprehensive theoretical basis for the DCM life cycle and DCM life cycle's potential risks so that DCM life cycle's promising benefits can hardly be materialized. Thus, developing a DCM life cycle and associating DCM life cycle with risk management, this study is highly believed to make a promising theoretical contribution to the DCM domain since this is one of the earliest attempts in the literature. Additionally, this research provides construction practitioners with an insight into the effective implementation of DCM practices in construction projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 30 April 2024

Sulakshya Gaur and Abhay Tawalare

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design…

Abstract

Purpose

Design cost overrun is one of the prominent factor that can impact the sustainable delivery of the project. It can be encountered due to a lack of information flow, design variation, etc. thereby impacting the project budget, waste generation and schedule. An overarching impact of this is witnessed in the sustainability dimensions of the project, mainly in terms of economic and environmental aspects. This work, therefore, aims to assess the implications of a technological process, in the form of building information modelling (BIM), that can smoothen the design process and mitigate the risks, thus impacting the sustainability of the project holistically.

Design/methodology/approach

The identified design risks in construction projects from the literature were initially analysed using a fuzzy inference system (FIS). This was followed by the focus group discussion with the project experts to understand the role of BIM in mitigating the project risks and, in turn, fulfilling the sustainability dimensions.

Findings

The FIS-based risk assessment found seven risks under the intolerable category for which the BIM functionalities associated with the common data environment (CDE), data storage and exchange and improved project visualization were studied as mitigation approaches. The obtained benefits were then subsequently corroborated with the achievement of three sustainability dimensions.

Research limitations/implications

The conducted study strengthens the argument for the adoption of technological tools in the construction industry as they can serve multifaceted advantages. This has been shown through the use of BIM in risk mitigation, which inherently impacts project sustainability holistically.

Originality/value

The impact of BIM on all three dimensions of sustainability, i.e. social, economic and environmental, through its use in the mitigation of critical risks was one of the important findings. It presented a different picture as opposed to other studies that have mainly been dominated by the use of BIM to achieve environmental sustainability.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 8 August 2022

Sitsofe Kwame Yevu, Ann Tit Wan Yu, Amos Darko, Gabriel Nani and David J. Edwards

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using…

Abstract

Purpose

This study aims to investigate the dynamic influences of clustered barriers that hinder electronic procurement technology (EPT) implementation in construction procurement, using the neuro-fuzzy system.

Design/methodology/approach

A comprehensive literature review was conducted and 21 barriers to EPT implementation within construction projects were identified. Based on an expert survey, 121 datasets were gathered for this study. Using mean and normalization analysis for the datasets, 15 out of the 21 barriers were deemed to have critical influences in EPT barriers phenomenon. Subsequently, the critical barriers were classified into five groups: human-related; technological risk-related; government-related; industry growth-related; and financial-related. The relationships and influence patterns between the groups of barriers to EPT implementation were analyzed using the neuro-fuzzy system. Furthermore, sensitivity analysis was performed to examine the dynamic influence levels of the barriers within the hindrance level composition.

Findings

The results reveal that addressing one barrier group does not reduce the high levels of hindrances experienced in EPT implementation. However, addressing at least two barrier groups mostly tends to reduce the hindrance levels for EPT implementation. Further, this study revealed that addressing some barrier group pairings, such as technological risk-related and government-related barriers, while other barrier groups remained at a high level, still resulted in high levels of hindrances to EPT implementation in construction procurement.

Research limitations/implications

This study provides insights for researchers to help them contribute to the development of theory with contemporary approaches based on the influence patterns of barrier interrelationships.

Practical implications

This study provides a model that would help practitioners and decision makers in construction procurement to understand and effectively determine the complex and dynamic influences of barrier groups to EPT uptake, for the development of suitable mitigation strategies.

Originality/value

This study provides novel insights into the complex influence patterns among grouped barriers concerning EPT adoption in the construction industry. Researchers and practitioners are equipped with knowledge on the influence patterns of barriers. This knowledge aids the development of effective strategies that mitigate the combined groups of barriers, and promote the wider implementation of EPT in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 October 2022

Libiao Bai, Shuyun Kang, Kaimin Zhang, Bingbing Zhang and Tong Pan

External stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk…

331

Abstract

Purpose

External stakeholder risks (ESRs) caused by unfavorable behaviors hinder the success of project portfolios (PPs). However, due to complex project dependency and numerous risk causality in PPs, assessing ESRs is difficult. This research aims to solve this problem by developing an ESR-PP two-layer fuzzy Bayesian network (FBN) model.

Design/methodology/approach

A two-layer FBN model for evaluating ESRs with risk causality and project dependency is proposed. The directed acyclic graph (DAG) of an ESR-PP network is first constructed, and the conditional probability tables (CPTs) of the two-layer network are further presented. Next, based on the fuzzy Bayesian network, key variables and the impact of ESRs are assessed and analyzed by using GeNIe2.3. Finally, a numerical example is used to demonstrate and verify the application of the proposed model.

Findings

The proposed model is a useable and effective approach for ESR assessment while considering risk causality and project dependency in PPs. The impact of ESRs on PP can be calculated to determine whether to control risk, and the most critical and heavily contributing risks and project(s) in the developed model are identified based on this.

Originality/value

This study extends prior research on PP risk in terms of stakeholders. ESRs that have received limited attention in the past are explored from an interaction perspective in the PP domain. A new two-layer FBN model considering risk causality and project dependency is proposed, which can synthesize different dependencies between projects.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 November 2022

Xianbo Zhao

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric…

526

Abstract

Purpose

This study collected the bibliographic data of 2034 journal articles published in 2000–2021 from Web of Science (WoS) core collection database and adopted two bibliometric analysis methods, namely historiography and keyword co-occurrence, to identify the evolution trend of construction risk management (CRM) research topics.

Design/methodology/approach

CRM has been a key issue in construction management research, producing a big number of publications. This study aims to undertake a review of the global CRM research published from 2000 to 2021 and identify the evolution of the research topics relating to CRM.

Findings

This study found that risk analysis methods have shifted from simply ranking risks in terms of their relative importance or significance toward examining the interrelationships among risks, and that the objects of CRM research have shifted from generic construction projects toward specified types of construction projects (e.g. small projects, underground construction projects, green buildings and prefabricated projects). In addition, researchers tend to pay more attention to an individual risk category (e.g. political risk, safety risk and social risk) and integrate CRM into cost, time, quality, safety and environment management functions with the increasing adoption of various information and communication technologies.

Research limitations/implications

This study focused on the journal articles in English in WoS core collection database only, thus excluding the publications in other languages, not indexed by WoS and conference proceedings. In addition, the historiography focused on the top documents in terms of document strength and thus ignored the role of the documents whose strengths were a little lower than the threshold.

Originality/value

This review study is more inclusive than any prior reviews on CRM and overcomes the drawbacks of mere reliance on either bibliometric analysis results or subjective opinions. Revealing the evolution process of the CRM knowledge domain, this study provides an in-depth understanding of the CRM research and benefits industry practitioners and researchers.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords