Search results

1 – 10 of 54
Open Access
Article
Publication date: 22 June 2018

Tri Yumarni and Dilanthi Amaratunga

The purpose of this paper is to discuss policy-relevant findings regarding strategies for mainstreaming gender in achieving sustainable post-disaster reconstruction (PDR).

3055

Abstract

Purpose

The purpose of this paper is to discuss policy-relevant findings regarding strategies for mainstreaming gender in achieving sustainable post-disaster reconstruction (PDR).

Design/methodology/approach

An exploratory case study was used to explore the implementation of gender mainstreaming strategies and the link to sustainable PDR. The Bantul and Sleman regencies of Yogyakarta province provide a unique site for researching PDR as they are located in a region that is more strongly affected by earthquakes than nearly any other in Indonesia. Data were collected through interviews with 17 key stakeholders and 26 beneficiaries who were involved during and after the earthquake. To support the interview findings, surveys involving 50 policy makers and 150 beneficiaries were conducted. Content analysis and t-statistics were used in analyzing the data.

Findings

Gender mainstreaming strategies within sustainable reconstruction should incorporate strategies for protecting against gender vulnerabilities and for promoting gender capacities. Both are fundamental to the achievement of sustainable PDR.

Originality/value

The paper establishes comprehensive strategies for mainstreaming gender under three pillars (i.e. economic, social and environmental) of sustainable development. The findings benefit relevant policy makers by improving the policy performance of gender mainstreaming in the affected communities in enhancing sustainable PDR.

Details

Built Environment Project and Asset Management, vol. 8 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 13 May 2020

Angelo Jonas Imperiale and Frank Vanclay

We consider what happened in the initial reconstruction interventions following the 6 April 2009 earthquake in L'Aquila (Italy). Using the disaster risk reduction and resilience…

3497

Abstract

Purpose

We consider what happened in the initial reconstruction interventions following the 6 April 2009 earthquake in L'Aquila (Italy). Using the disaster risk reduction and resilience paradigm, we discuss the cognitive and interactional failures of top-down approaches, and we analyse the main constraints to enacting inclusive social learning and socially-sustainable transformation and building back better more resilient communities in post-disaster reconstruction.

Design/methodology/approach

Our evidence comes from participant observation, action anthropology and analytic auto-ethnography conducted during the reconstruction phase following the L'Aquila earthquake. Findings were triangulated with document analysis, media analysis and retrospective interviewing conducted in 2013 and 2017.

Findings

The shift from civil defence to civil protection did not bring any advance in disaster management and development practice in terms of DRR and resilience. The militaristic command-and-control approach, which is still in vogue among civil protection systems, means that local political leaders become the civil protection authorities in a disaster area. As in the L'Aquila case, this exacerbates local social and environmental risks and impacts, inhibits local communities from learning and restricts them from participating in post-disaster interventions.

Originality/value

Most previous commentary on disaster recovery and reconstruction following the L'Aquila earthquake has focussed on the top-down approach carried out by the national government and the Italian Department of Civil Protection (DCP). This paper is unique in that it sheds light on how the command-and-control approach was also implemented by local authority figures and on how this undermined building back better more resilient communities.

Details

Disaster Prevention and Management: An International Journal, vol. 29 no. 4
Type: Research Article
ISSN: 0965-3562

Keywords

Open Access
Article
Publication date: 11 July 2016

Nuwan Tharanga Dias, Kaushal Keraminiyage and Kushani Kulasthri DeSilva

After tsunami 2004, it was estimated that more than 98,000 permanent houses had to be rebuilt. However, ten years on, as communities, are they satisfied in their new homes? What…

3255

Abstract

Purpose

After tsunami 2004, it was estimated that more than 98,000 permanent houses had to be rebuilt. However, ten years on, as communities, are they satisfied in their new homes? What are the indicators affecting the long-term satisfaction of resettled communities in relation to their new permanent houses. The purpose of this paper is to qualitatively evaluate the level of long-term satisfaction of two tsunami affected resettled communities in Sri Lanka in a bid to identify the indicators affecting the long-term satisfaction of post disaster resettled communities in relation to permanent housing.

Design/methodology/approach

In addition to the thorough literature review conducted to evaluate the state of the art in the subject area, a series of interviews were conducted with experts and tsunami affected communities in Sri Lanka to gather primary data for this research. The literature review is used to establish the initial list of indicators of long-term satisfaction of resettlements. The expert interviews and the community interviews were used to verify and refine the initially identified indicators.

Findings

A sustainable resettlement programme is just not merely reconstruction of a set of houses. A resettlement programme should re-establish the socio-economic and cultural life of people. Reconstruction of a house does not solve the housing issue; it is vital to look in to the indicators which can convert a house into a home and the surrounding into a neighbourhood.

Originality/value

This paper makes a significant contribution in terms of identifying indicators affecting the long-term community satisfaction with resettlement programmes taking into account economic, social and cultural factors with a special emphasis on post tsunami resettlements in Sri Lanka.

Details

Disaster Prevention and Management: An International Journal, vol. 25 no. 5
Type: Research Article
ISSN: 0965-3562

Keywords

Open Access
Article
Publication date: 4 April 2016

Gayani Karunasena and Dilanthi Amaratunga

The purpose of this paper is to present a theoretical framework for capacity building in post disaster construction and demolition (C & D) waste management at a national…

5122

Abstract

Purpose

The purpose of this paper is to present a theoretical framework for capacity building in post disaster construction and demolition (C & D) waste management at a national level to address the identified capacity gaps in managing disaster waste resulting from natural hazards.

Design/methodology/approach

Data were gathered through pilot interviews, case studies and expert opinion surveys representing government, non-government and other sector organisations involved in post disaster waste management.

Findings

The study revealed unavailability of a single point of responsibility and provision for disaster waste in existing policies and capacity constraints in prevailing peace time solid waste management practices which were identified as major capacity gaps. Establishment of a regulatory body and enforceable rules and regulations with necessary levels of capacities was identified and presented in a theoretical framework comprising of seven identified areas for capacity building in post disaster waste management.

Research limitations/implications

This study is limited to disaster C & D waste as debris generated from totally or partially damaged buildings and infrastructure as a direct impact of natural hazards or from demolished buildings and infrastructure at rehabilitation or early recovery stages. Waste generated during reconstruction phase of post disaster management cycle is not considered as disaster C & D waste for purposes of this study.

Originality/value

The research enabled analysis of existing capacities and presents approaches for capacity building for identified gaps in post disaster C & D waste management to attain sustainable post disaster waste management for future resilience.

Details

Disaster Prevention and Management, vol. 25 no. 2
Type: Research Article
ISSN: 0965-3562

Keywords

Open Access
Article
Publication date: 12 August 2020

Massimo Sargiacomo and Stephen P. Walker

The purpose of this paper is to investigate how public/private hybrid and ambiguous organizations played pivotal roles in a governmental programme of housing reconstruction

3066

Abstract

Purpose

The purpose of this paper is to investigate how public/private hybrid and ambiguous organizations played pivotal roles in a governmental programme of housing reconstruction following a major earthquake in central Italy in 2009. Venturing beyond the boundaries of institutional isomorphism and using a Foucauldian approach, the longitudinal analysis seeks to illuminate accounting and performance challenges and provide insights to the calculative techniques associated with evacuee housing.

Design/methodology/approach

In “act 1” this paper investigates the role of a consortium created during the recovery stage of the disaster to construct temporary housing. In “act 2” attention shifts to consortia established for the reconstruction of buildings in devastated communities. The total observation period is 11 years. 31 semi-structured interviews were conducted with 15 key-actors. A broad range of official documents was also consulted.

Findings

In the immediate aftermath of the earthquake a comprehensive reporting system was established to facilitate the construction of 19 new towns for 15,000 evacuees. The mix of accountants, engineers and architects who developed the system and a building prototype evidences the assembly of diverse calculative techniques by different experts and the de-territorialization of subject disciplines. During reconstruction technologies of government included the introduction of standardised systems and vocabularies that homogenised administrative procedures among diverse experts.

Research limitations/implications

This paper provides academics and policymakers with insights to accounting, performance management and accountability in hybrid organizations in the largely unexplored realm of post-disaster evacuee housing. Further studies are needed to examine the politics of calculation in similar contexts.

Originality/value

This paper fills a gap in the literature by exploring the role played by individual experts working for hybrid organizations. Further, by exploring actual practices over an extended period of post-disaster recovery and reconstruction, the study highlights how experts intervened to solve problems at the meso-political level and at the micro-organizational level.

Details

Accounting, Auditing & Accountability Journal, vol. 35 no. 3
Type: Research Article
ISSN: 0951-3574

Keywords

Open Access
Article
Publication date: 11 July 2016

Richard Haigh, Siri Hettige, Maheshika Sakalasuriya, G. Vickneswaran and Lasantha Namal Weerasena

The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on…

3534

Abstract

Purpose

The purpose of this paper is to critically analyse the role of housing reconstruction projects in post conflict and post tsunami Sri Lanka, and to discuss their implications on conflict prevention.

Design/methodology/approach

Using four housing reconstruction projects in Batticaloa, Kilinochchi and Jaffna Districts, Sri Lanka, as case studies, and a novel methodological framework, the study explores the causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention. The data, gathered from interviews and project reports, were analysed using propositions from a literature review, adopting a thematic analytical approach.

Findings

This study finds that reconstruction has created new forms of conflicts and tensions for the people who came to live in the newly constructed houses. The hostile relations that existed among different ethnic groups during the conflict were continued, and to some extent, exacerbated by the reconstruction undertaken after the war.

Practical implications

The study identifies causal relations among the independent variables associated with housing reconstruction and dependent variables related to conflict prevention, which can be used to inform physical reconstruction programmes after conflict.

Originality/value

The research presents a novel methodological framework. The results reveal concerns in housing and infrastructure development that have implications for future research and practice in post conflict environments.

Details

Disaster Prevention and Management: An International Journal, vol. 25 no. 5
Type: Research Article
ISSN: 0965-3562

Keywords

Open Access
Article
Publication date: 28 September 2021

Alex Copping, Noorullah Kuchai, Laura Hattam, Natalia Paszkiewicz, Dima Albadra, Paul Shepherd, Esra Sahin Burat and David Coley

Understanding the supply network of construction materials used to construct shelters in refugee camps, or during the reconstruction of communities, is important as it can reveal…

1833

Abstract

Purpose

Understanding the supply network of construction materials used to construct shelters in refugee camps, or during the reconstruction of communities, is important as it can reveal the intricate links between different stakeholders and the volumes and speeds of material flows to the end-user. Using social network analysis (SNA) enables another dimension to be analysed – the role of commonalities. This is likely to be particularly important when attempting to replace vernacular materials with higher-performing alternatives or when encouraging the use of non-vernacular methods. This paper aims to analyse the supply networks of four different disaster-relief situations.

Design/methodology/approach

Data were collected from interviews with 272 displaced (or formally displaced) families in Afghanistan, Bangladesh, Nepal and Turkey, often in difficult conditions.

Findings

The results show that the form of the supply networks was highly influenced by the nature/cause of the initial displacement, the geographical location, the local availability of materials and the degree of support/advice given by aid agencies and or governments. In addition, it was found that SNA could be used to indicate which strategies might work in a particular context and which might not, thereby potentially speeding up the delivery of novel solutions.

Research limitations/implications

This study represents the first attempt in theorising and empirically investigating supply networks using SNA in a post-disaster reconstruction context. It is suggested that future studies might map the up-stream supply chain to include manufacturers and higher-order, out of country, suppliers. This would provide a complete picture of the origins of all materials and components in the supply network.

Originality/value

This is original research, and it aims to produce new knowledge.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 12 no. 1
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 5 November 2018

Dilanthi Amaratunga, Chamindi Ishara Malalgoda and Kaushal Keraminiyage

Construction industry and the built environment professions play an important role in contributing to society’s improved resilience. It is therefore important to improve their…

2669

Abstract

Purpose

Construction industry and the built environment professions play an important role in contributing to society’s improved resilience. It is therefore important to improve their knowledgebase to strengthen their capacities. This paper aims to identify gaps in the knowledgebase of construction professionals that are undermining their ability to contribute to the development of a more disaster resilient society. The paper also provides a series of recommendations to key actors in the built environment on how to more effectively mainstream disaster resilience in the construction process.

Design/methodology/approach

The paper reports the findings of 87 stakeholder interviews with: national and local government organisations; the community; non-governmental organisations, international non-governmental organisation and other international agencies; academia and research organisations; and the private sector, which were supplemented by a comprehensive analysis of key policies related to disaster resilience and management. The findings were validated using focus group discussions that were conducted as part of six organised stakeholder workshops.

Findings

The primary and secondary data generated a long list of needs and skills. Finally, the identified needs and skills were combined “like-for-like” to produce broader knowledge gaps. Some of the key knowledge gaps identified are: governance, legal frameworks and compliance; business continuity management; disaster response; contracts and procurement; resilience technologies, engineering and infrastructure; knowledge management; social and cultural awareness; sustainability and resilience; ethics and human rights; innovative financing mechanisms; multi stakeholder approach, inclusion and empowerment; post disaster project management; and multi hazard risk assessment. The study also identifies a series of recommendations to key actors in the built environment on how to more effectively mainstream disaster resilience in the construction process. The recommendations are set out in five key themes: education, policy, practice, research and cross-cutting.

Research limitations/implications

This study is part of an EU funded research project that is seeking to develop innovative and timely professional education that will update the knowledge and skills of construction professionals in the industry and enable them to contribute more effectively to disaster resilience building efforts.

Originality/value

The paper provides an extensive analysis of the gaps in the knowledgebase of construction professionals that are undermining their ability to contribute to the development of a more disaster resilient society. Accordingly, the paper recommends major changes in construction education, research, policy and practice with respect to mainstreaming disaster resilience within the construction process.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 9 no. 4/5
Type: Research Article
ISSN: 1759-5908

Keywords

Open Access
Article
Publication date: 24 March 2020

Robby Soetanto, Ferry Hermawan, Alistair Milne, Jati Utomo Dwi Hatmoko, Sholihin As'ad and Chusu He

Recent years saw a paradigm shift from ex post (reactive) to ex ante (proactive) approaches (e.g. insurance) to disaster risk financing for building resilience of communities in…

2801

Abstract

Purpose

Recent years saw a paradigm shift from ex post (reactive) to ex ante (proactive) approaches (e.g. insurance) to disaster risk financing for building resilience of communities in developing countries. To facilitate adoption, the approaches should be adapted so that they can be technically feasible and culturally desirable to the local context. This paper aims to report an exploratory study to elaborate the existing arrangements to deal with the impacts of disaster and the potential to shift to a more proactive disaster risk financing in Indonesia.

Design/methodology/approach

A series of stakeholder engagement activities in Semarang and Solo, Indonesia was conducted to ascertain the existing arrangements for disaster risk financing at local government level, the challenges/barriers to the adoption of insurance, education and policies to facilitate the transformation from reactive to proactive process. Thematic analysis was applied to transcribed conversations during interviews, focus groups and workshops. Identification of emerging issues/themes was also guided by the researchers’ notes during the events, and facilitated by qualitative analysis software, Atlas Ti®. This was complemented by an analysis of regulations and documents provided by the local stakeholders.

Findings

The local governments heavily rely on contingency fund, which is not enough and often significantly delayed to fund recovery and reconstruction of public infrastructure. The use of insurance is limited in both public and private sectors, particularly in the majority of low-income communities. Various barriers and challenges were identified under several categories, namely, institutional, cultural, affordability, lack of awareness and knowledge, insurance arrangement process and lack of trust. The findings also suggest that improving insurance education should involve multiple stakeholders, and both formal and informal routes should be pursued.

Originality/value

The research fills the gap of knowledge in disaster risk financing in the context of developing countries, specifically in local governments and communities in Indonesia. The findings may be replicable for other developing countries with low adoption of ex ante financial instruments for dealing with the impacts of disaster.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 11 no. 3
Type: Research Article
ISSN: 1759-5908

Keywords

Open Access
Article
Publication date: 22 August 2022

Annisa Triyanti, Gusti Ayu Ketut Surtiari, Jonatan Lassa, Irina Rafliana, Nuraini Rahma Hanifa, Mohamad Isnaeni Muhidin and Riyanti Djalante

This paper aims to identify key factors for a contextualised Systemic Risk Governance (SRG) framework and subsequently explore how systemic risks can be managed and how local…

2044

Abstract

Purpose

This paper aims to identify key factors for a contextualised Systemic Risk Governance (SRG) framework and subsequently explore how systemic risks can be managed and how local institutional mechanisms can be tweaked to deal with the complex Indonesian risk landscape.

Design/methodology/approach

Using a case study from Palu triple-disasters in Central Sulawesi, Indonesia, the authors demonstrate how inland earthquakes in 2018 created cascading secondary hazards, namely tsunamis, liquefactions and landslides, caused unprecedented disasters for the communities and the nation. A qualitative analysis was conducted using the data collected through a long-term observation since 2002.

Findings

The authors argue that Indonesia has yet to incorporate an SRG approach in its responses to the Palu triple-disasters. Political will is required to adopt more appropriate risk governance modes that promote the systemic risk paradigm. Change needs to occur incrementally through hybrid governance arrangements ranging from formal/informal methods to self- and horizontal and vertical modes of governance deemed more realistic and feasible. The authors recommend that this be done by focusing on productive transition and local transformation.

Originality/value

There is growing awareness and recognition of the importance of systemic and cascading risks in disaster risk studies. However, there are still gaps between research, policy and practice. The current progress of disaster risk governance is not sufficient to achieve the Sendai Framework for Disaster Risk Reduction (2015–2030) unless there is an effective governing system in place at the local level that allow actors and institutions to simultaneously manage the interplays of multi-hazards, multi-temporal, multi-dimensions of vulnerabilities and residual risks. This paper contributes to these knowledge gaps.

Details

Disaster Prevention and Management: An International Journal, vol. 32 no. 1
Type: Research Article
ISSN: 0965-3562

Keywords

1 – 10 of 54