Article
Publication date: 1 November 2022

Zihao Zheng, Yuanqi Li and Jaume Torres

This paper aims to propose a generative design method combined with meta-heuristic algorithm for automating and optimizing the floor layout of modular buildings using typical…

Abstract

Purpose

This paper aims to propose a generative design method combined with meta-heuristic algorithm for automating and optimizing the floor layout of modular buildings using typical standardized module units, which are the room module, the corridor module and the stair module.

Design/methodology/approach

The integrated framework involves the generative design method and optimization for modular construction. The generative rules are provided by geometric relationships and functionalities of the module units. An evaluation function of the generated floor plans is also presented by the combination of project cost and cost penalties for the geometric features. The multi-population genetic algorithm (MPGA) method is provided for the optimization of the combination of costs.

Findings

The proposed MPGA method is demonstrated fast and efficient at discovering the globally optimal solution. The results indicate that when the unit price of modules is high, the transportation distance is long, or the land cost is high, the layout cost, which related to the symmetry, the compactness and the energy is tend to be lower, making the optimal layout economical.

Originality/value

This paper presented an integrated framework of generative floor layout and optimization for modular construction by using typical module units. It fulfills the need for automated layout generation with repetitive units and corresponding assessment during the early design stage.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 8 June 2022

Larissa Statsenko, Aparna Samaraweera, Javad Bakhshi and Nicholas Chileshe

Based on the systematic literature review, this paper aims to propose a framework of Construction 4.0 (C4.0) scenarios, identifying Industry 4.0 (I4.0) enabling technologies and…

1885

Abstract

Purpose

Based on the systematic literature review, this paper aims to propose a framework of Construction 4.0 (C4.0) scenarios, identifying Industry 4.0 (I4.0) enabling technologies and their applications in the construction industry. The paper reviews C4.0 trends and potential areas for development.

Design/methodology/approach

In this research, a systematic literature review (SLR) methodology has been applied, including bibliographic coupling analysis (BCA), co-citation network analysis of keywords, the content analysis with the visualisation of similarities (VOSviewer) software and aggregative thematic analysis (ATA). In total, 170 articles from the top 22 top construction journals in the Scopus database between 2013 and 2021 were analysed.

Findings

Six C4.0 scenarios of applications were identified. Out of nine I4.0 technology domains, Industrial Internet of Things (IIoT), Cloud Computing, Big Data and Analytics had the most references in C4.0 research, while applications of augmented/virtual reality, vertical and horizontal integration and autonomous robotics yet provide ample avenues for the future applied research. The C4.0 application scenarios include efficient energy usage, prefabricated construction, sustainability, safety and environmental management, indoor occupant comfort and efficient asset utilisation.

Originality/value

This research contributes to the body of knowledge by offering a framework of C4.0 scenarios revealing the status quo of research published in the top construction journals into I4.0 technology applications in the sector. The framework evaluates current C4.0 research trends and gaps in relation to nine I4.0 technology domains as compared with more advanced industry sectors and informs academic community, practitioners and strategic policymakers with interest in C4.0 trends.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 August 2022

Yanhu Han, Xiyu Yan and Poorang Piroozfar

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to…

1858

Abstract

Purpose

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to high efficiency, energy saving, low environmental impacts, safety and other advantages of PC. Well-managed supply chain can further leverage the advantages of PC. However, there is a lack of more systematically overview of the prefabricated construction supply chain (PCSC). This paper aims to comb the current status and look into the future direction of PCSC by reviewing the existing research.

Design/methodology/approach

In total, 131 articles related to prefabricated construction supply chain management (PCSCM) from 2000 to 2022 have been collated to (1) conduct a bibliometric analysis by using VOSviewer, including the literature sources, keywords co-occurrence, co-authorships, authorship citation and country active in the field of PCSCM; (2) classify and summarize the status of research in PCSCM through qualitative discussion and (3) point out the future research directions.

Findings

In total, 131 articles are carried out for bibliometric analysis and in-depth qualitative discussion, the visualization maps and the main research themes in the field of PCSCM are obtained. The results show that supply chain intelligentization and informatization are hot topics. Finally, future research directions that should be paid attention to in the field of PCSCM are pointed out.

Practical implications

This study can help project managers understand the current status and problems of PCSC operations and provide a basis for future management decisions.

Originality/value

Compared with previous studies, this study adds the dimension of “article authorship” to the quantitative analysis and discusses the research themes in the field of PCSCM in a comprehensive manner. In addition, this paper deeply discusses the main research topics from both the specific contents and research methods adopted.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 April 2024

Daan Kabel, Jason Martin and Mattias Elg

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it…

Abstract

Purpose

The integration of industry 4.0 has become a priority for many organizations. However, not all organizations are suitable and capable of implementing industry 4.0 because it requires a dynamic and flexible implementation strategy. The implementation of industry 4.0 often involves overcoming several tensions between internal and external stakeholders. This paper aims to explore the paradoxical tensions that arise for health-care organizations when integrating industry 4.0. Moreover, it discusses how a paradox lens can support the conceptualization and proposes techniques for handling tensions during the integration of industry 4.0.

Design/methodology/approach

This qualitative and in-depth study draws upon 32 semi-structured interviews. The empirical case concerns how two health-care organizations handle paradoxical tensions during the integration of industry 4.0.

Findings

The exploration resulted in six recurring technology tensions: technology invention (modularized design vs. flexible design), technology collaboration (automation vs. human augmentation), technology-driven patient experience (control vs. autonomy), technology uncertainty (short-term experimentation vs. long-term planning), technology invention and diffusion through collaborative efforts among stakeholders (selective vs. intensive collaboration) and technological innovation (market maintenance vs. disruption).

Originality/value

A paradox theory-informed conceptual model is proposed for how to handle tensions during the integration of industry 4.0. To the best of the authors’ knowledge, this is the first paper to introduce paradox theory for quality management, including lean and Six Sigma.

Details

International Journal of Lean Six Sigma, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 14 August 2023

Usman Tariq, Ranjit Joy, Sung-Heng Wu, Muhammad Arif Mahmood, Asad Waqar Malik and Frank Liou

This study aims to discuss the state-of-the-art digital factory (DF) development combining digital twins (DTs), sensing devices, laser additive manufacturing (LAM) and subtractive…

Abstract

Purpose

This study aims to discuss the state-of-the-art digital factory (DF) development combining digital twins (DTs), sensing devices, laser additive manufacturing (LAM) and subtractive manufacturing (SM) processes. The current shortcomings and outlook of the DF also have been highlighted. A DF is a state-of-the-art manufacturing facility that uses innovative technologies, including automation, artificial intelligence (AI), the Internet of Things, additive manufacturing (AM), SM, hybrid manufacturing (HM), sensors for real-time feedback and control, and a DT, to streamline and improve manufacturing operations.

Design/methodology/approach

This study presents a novel perspective on DF development using laser-based AM, SM, sensors and DTs. Recent developments in laser-based AM, SM, sensors and DTs have been compiled. This study has been developed using systematic reviews and meta-analyses (PRISMA) guidelines, discussing literature on the DTs for laser-based AM, particularly laser powder bed fusion and direct energy deposition, in-situ monitoring and control equipment, SM and HM. The principal goal of this study is to highlight the aspects of DF and its development using existing techniques.

Findings

A comprehensive literature review finds a substantial lack of complete techniques that incorporate cyber-physical systems, advanced data analytics, AI, standardized interoperability, human–machine cooperation and scalable adaptability. The suggested DF effectively fills this void by integrating cyber-physical system components, including DT, AM, SM and sensors into the manufacturing process. Using sophisticated data analytics and AI algorithms, the DF facilitates real-time data analysis, predictive maintenance, quality control and optimal resource allocation. In addition, the suggested DF ensures interoperability between diverse devices and systems by emphasizing standardized communication protocols and interfaces. The modular and adaptable architecture of the DF enables scalability and adaptation, allowing for rapid reaction to market conditions.

Originality/value

Based on the need of DF, this review presents a comprehensive approach to DF development using DTs, sensing devices, LAM and SM processes and provides current progress in this domain.

Article
Publication date: 22 January 2024

Xin Jin, Geoffrey Shen, Lizi Luo and Xin Zhou

Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in…

Abstract

Purpose

Modular integrated construction (MiC) is an innovative and effective manufacturing-based method of construction that has become the mainstream development direction of projects in Hong Kong (HK). However, large-scale promotion of MiC practice still needs efforts. A pressing concern is that the impact of relevant policies on stakeholders during project implementation is rarely explored in depth. Therefore, to fill the research gap, this study aims to investigate the influence of policies on stakeholders to drive the successful implementation of MiC in HK.

Design/methodology/approach

This study uses a strategy of multiple methods. First, a comprehensively literature review and survey were adopted to identify critical policies and stakeholders. Second, semi-structured interviews with 28 experts were conducted to quantify their relationships. Third, three policy–stakeholder networks at initiation, planning and design and construction stages were established using social network analysis.

Findings

Environmental protection policy, COVID-19 pandemic policy and environmental protection policy and quality acceptance standard for project completion are found to be the most important policies of the three stages, respectively. The HK government and developers are highlighted as prominent stakeholders influencing policy implementation at all three stages. The dynamics of the influence stakeholders receive from critical policies at different stages of MiC are discussed. Valuable recommendations are accordingly proposed to enhance the successful implementation of MiC projects from the perspective of various stakeholders.

Originality/value

This study contributes to the body of knowledge by considering the mediating influence of stakeholders during policy implementation in the MiC uptake, and is valuable in helping policymakers to deeply understand the influence of policies to further forward successful MiC implementation and practicality in HK.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 March 2024

Keyu Chen, Beiyu You, Yanbo Zhang and Zhengyi Chen

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction…

Abstract

Purpose

Prefabricated building has been widely applied in the construction industry all over the world, which can significantly reduce labor consumption and improve construction efficiency compared with conventional approaches. During the construction of prefabricated buildings, the overall efficiency largely depends on the lifting sequence and path of each prefabricated component. To improve the efficiency and safety of the lifting process, this study proposes a framework for automatically optimizing the lifting path of prefabricated building components using building information modeling (BIM), improved 3D-A* and a physic-informed genetic algorithm (GA).

Design/methodology/approach

Firstly, the industry foundation class (IFC) schema for prefabricated buildings is established to enrich the semantic information of BIM. After extracting corresponding component attributes from BIM, the models of typical prefabricated components and their slings are simplified. Further, the slings and elements’ rotations are considered to build a safety bounding box. Secondly, an efficient 3D-A* is proposed for element path planning by integrating both safety factors and variable step size. Finally, an efficient GA is designed to obtain the optimal lifting sequence that satisfies physical constraints.

Findings

The proposed optimization framework is validated in a physics engine with a pilot project, which enables better understanding. The results show that the framework can intuitively and automatically generate the optimal lifting path for each type of prefabricated building component. Compared with traditional algorithms, the improved path planning algorithm significantly reduces the number of nodes computed by 91.48%, resulting in a notable decrease in search time by 75.68%.

Originality/value

In this study, a prefabricated component path planning framework based on the improved A* algorithm and GA is proposed for the first time. In addition, this study proposes a safety-bounding box that considers the effects of torsion and slinging of components during lifting. The semantic information of IFC for component lifting is enriched by taking into account lifting data such as binding positions, lifting methods, lifting angles and lifting offsets.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 April 2023

Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Paramjit Singh Jamir Singh, Mohamad Shaharudin Samsurijan and Mahathir Yahaya

This study presents the results of an assessment of the barriers that can hinder the deployment of robotics and automation systems in developing countries through the lens of the…

Abstract

Purpose

This study presents the results of an assessment of the barriers that can hinder the deployment of robotics and automation systems in developing countries through the lens of the Nigerian construction industry.

Design/methodology/approach

A scoping literature review was conducted through which barriers to the adoption of robotics and automation systems were identified, which helped in the formulation of a questionnaire survey. Data were obtained from construction professionals including architects, builders, engineers and quantity surveyors. Retrieved data were analyzed using percentages, frequencies, mean item scores and exploratory factor analysis.

Findings

Based on the mean scores, the top five barriers were the fragmented nature of the construction process, resistance by workers and unions, hesitation to adopt innovation, lack of capacity and expertise and lack of support from top-level managers. Through factor analysis, the barriers identified were categorized into four principal clusters namely, industry, human, economic and technical-related barriers.

Practical implications

This study provided a good theoretical and empirical foundation that can be useful to construction industry stakeholders, decision-makers, policymakers and the government in mapping out strategies to promote the incorporation and deployment of automation and robotics into the construction industry to attain the safety benefits they offer.

Originality/value

By identifying and evaluating the challenges that hinder the implementation of robotics and automation systems in the Nigerian construction industry, this study makes a significant contribution to knowledge in an area where limited studies exist.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 22 March 2024

Qianmai Luo, Chengshuang Sun, Ying Li, Zhenqiang Qi and Guozong Zhang

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the…

Abstract

Purpose

With increasing complexity of construction projects and new construction processes and methods are adopted, more safety hazards are emerging at construction sites, requiring the application of the modern risk management methods. As an emerging technology, digital twin has already made valuable contributions to safety risk management in many fields. Therefore, exploring the application of digital twin technology in construction safety risk management is of great significance. The purpose of this study is to explore the current research status and application potential of digital twin technology in construction safety risk management.

Design/methodology/approach

This study followed a four-stage literature processing approach as outlined in the systematic literature review procedure guidelines. It then combined the quantitative analysis tools and qualitative analysis methods to organize and summarize the current research status of digital twin technology in the field of construction safety risk management, analyze the application of digital twin technology in construction safety risk management and identify future research trends.

Findings

The research findings indicate that the application of digital twin technology in the field of construction safety risk management is still in its early stages. Based on the results of the literature analysis, this paper summarizes five aspects of digital twin technology's application in construction safety risk management: real-time monitoring and early warning, safety risk prediction and assessment, accident simulation and emergency response, safety risk management decision support and safety training and education. It also proposes future research trends based on the current research challenges.

Originality/value

This study provides valuable references for the extended application of digital twin technology and offers a new perspective and approach for modern construction safety risk management. It contributes to the enhancement of the theoretical framework for construction safety risk management and the improvement of on-site construction safety.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79331

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords