Search results

1 – 10 of 196
Case study
Publication date: 7 August 2024

Soroush Dehghan Salmasi, Mehran Sepehri and Yashar Dadashzadeh

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and…

Abstract

Learning outcomes

After reading the case and answering the case assignments, students will be able to understand and explain the challenges and opportunities for engineering, procurement and construction (EPC) contractors and their subcontractors; understand and critically analyse the advantages and disadvantages of insourcing and outsourcing of engineering, procurement and construction in EPC projects; determine which situations merit insourcing or outsourcing within each of engineering, procurement and construction in EPC projects; understand and identify the competencies and qualifications that a subcontractor must possess if any EPC activity is outsourced to them; and develop a decision-making framework to determine which EPC activities must be kept in-house or outsourced in EPC projects.

Case overview/synopsis

In mid-March 2021, PetroSahand International Group, a leading EPC contractor specializing in the oil, gas and petrochemicals industries in Iran, encountered significant challenges with its subcontractors in engineering and construction. These issues resulted in widespread repercussions for the company, including project delays and mounting debts. At the peak of these crises, PetroSahand’s senior management embarked on a thorough examination of whether to insource or outsource various aspects of their operations, such as engineering, procurement and construction. Their objective was twofold: to prevent similar setbacks in future projects and to navigate existing projects with minimal disruption to the company’s reputation. To address this critical dilemma, PetroSahand enlisted the expertise of a consulting team from Sharif University of Technology. Comprising esteemed professors, graduates and students from one of Iran’s most respected institutions, this team undertook an exhaustive analysis of the insourcing versus outsourcing debate across EPC domains. Subsequently, they presented their comprehensive findings, thereby confronting PetroSahand’s senior management with a pivotal choice regarding the optimal approach for each activity.

Complexity academic level

The audience of this work is undergraduate and graduate students who are enrolled in project management courses, both fundamentals and advanced. In addition, this case helps senior managers of EPC contractors gain a deeper and more comprehensive understanding of insourcing or outsourcing different project activities.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 7: Management science.

Details

Emerald Emerging Markets Case Studies, vol. 14 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Abstract

Subject area

Public Sector Management and Strategy

Study level/applicability

This case will be useful for courses in information technology (IT) innovation, public–private partnership (PPP) and strategic management. However, the use of the case will differ on the basis of the target audience who could be students of master's course or executive development course. Detailed discussion can be done on co-innovation strategy followed in a public–private partnership and to understand how a PPP can be successful in enterprise solutions. Further, the understanding on how e-procurement and e-tendering solutions work can be gained through this case. This case should be positioned when the discussion for the planning strategy of IT innovation takes place.

Case overview

SAP was a market leader in enterprise application software and empowered people across the globe to work more efficiently. The e-procurement solution for OILGIAN was managed by SAP LABS India. OILGIAN entrusted SAP with the task to design and implement the e-tendering solution. SAP appointed Ramakrishna Potluri, Lead Consultant, SAP, to manage the design and implementation of the e-tendering module as a part of e-procurement solution for the public sector. The reporting and the security concerns were stated by OILGIAN, and Potluri reassured that his competent team would comply with the needs. The main predicaments that he was going through were that how best he could take the proposition forward. Should he create the innovative solutions in-house or co-create with the customers? Which business models should he follow for this public–private co-innovation to be a predecessor of successful projects?

Expected learning outcomes

The case illustrates the following objectives: to discuss the co-innovation strategy followed in a public–private partnership; to understand how a public–private partnership can be successful in enterprise solutions; and to understand how e-procurement and e-tendering solutions work.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Details

Emerald Emerging Markets Case Studies, vol. 4 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 28 September 2022

Zehra Waheed

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each…

Abstract

Learning outcomes

The key teaching objectives of the case are the following:▪ to develop an awareness of a megaproject’s external environment (through PESTLE) in terms of challenges from each source;▪ to introduce theory that allows students to identify, characterise and describe factors that can lead to inter-organisational conflict during construction projects;▪ to develop the ability to apply the typology of causal factors (identified in Objective 2) to a given context, answering why each factor may have contributed to the given contractual dispute;▪ to develop an understanding of the procurement and contract management process wherein contracts are not only the logical outcome of the procurement process but also the primary vehicles for clarifying responsibilities (for task completion) and risk transfer; and▪ to understand specific dynamics of construction projects that make disputes inevitable and ways to overcome these.

Case overview/synopsis

Priced at US$1.63bn (in 2015), the Orange Line Metro Train (OLMT) project in Lahore was one of Pakistan’s earliest (and costliest!) transport infrastructure megaprojects ever undertaken. Devised to ease congestion in Lahore, promote ecofriendly, efficient, modern and affordable transport systems and lead to improved mobility across Lahore, the OLMT was a socially, politically and economically important project.The case is seen through the eyes of the protagonist, Uzair Shah, a seasoned public servant and an experienced Transport Engineer. At the time of the decision, Shah was General Manager – Operations at the newly established Punjab Metrobus Authority (PMA – the project sponsor) and was also the project lead of OLMT’s Project Management Unit (PMU). Through Shah’s eyes, students approach the project at a juncture when the most serious contractual dispute in the project’s history has erupted. The parties at the interface were Lahore Development Authority (LDA), PMU’s technical interface with contractors and consultants and Maqbool-Colson Joint Venture (MCJV), one of the two civil work contractors hired for OLMT’s civil works.While quality issues had been emerging with MCJV for a few months, LDA had maintained unilateral communications and remained considerably adversarial in their dealings with MCJV. Eventually, in October 2016, this relationship had soured to such an extent that it appeared irreconcilable. It was only then that LDA had recommended Shah to take the contractor to court for non-performance.The decision that Uzair faced was whether to take LDA’s advice and take the contractor to court (terminate the contract, claim performance guarantee and appoint a new contractor) or negotiate and continue with the current contract. The decision had huge financial, legal, reputational, political and schedule-related implications. The decision needed to be taken by the protagonist in the context of all these factors.

Complexity academic level

The case was initially developed for use within a Procurement and Contracts Management course for a (business) executive audience. The case is intended for the business school audience or students enrolled in courses related to the construction management discipline.Courses where the case can be used include Construction Project Management, Public Sector Projects, Contracts and Procurement and Strategic Projects and Practice (or similar). The case can also be used within an MBA setting.

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS: 9: Operations and Logistics.

Case study
Publication date: 13 December 2013

Zhuo Jun, Phan Chanvicheka and Gao Shuai

Management science, operational and financial risk of overseas enterprises.

Abstract

Subject area

Management science, operational and financial risk of overseas enterprises.

Study level/applicability

This case is mainly applicable to international business course and project management course.

Case overview

Since 1992, the Great Mekong sub-regional economic cooperation between China and ASEAN countries was officially launched and set free economic zone. Hydropower is starting to develop in recent years in Cambodia, and it is a good significance to Cambodia's industry. Furthermore, most of hydropower plants in Cambodia are built by Chinese companies. Thus, this paper will analyze the current risk and condition of Kamchay hydropower, as well as the development of Chinese enterprise for Cambodia economic and social development.

Expected learning outcomes

This case study provides students concepts on international business, project management, and operational risk of overseas enterprises. The principle of project contracting, labor cooperation, and project financial in international process are considered together with the implications they have for advancing understanding of the problem of the host country's government interests and the various risk of enterprises in international BOT projects.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Details

Emerald Emerging Markets Case Studies, vol. 3 no. 8
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 15 February 2022

Saad Tahir and Asher Ramish

This case study aims to be taught at an MBA level. Specifically, those students who are majoring in supply chain would benefit the most from this case study. This case study has…

Abstract

Learning outcomes

This case study aims to be taught at an MBA level. Specifically, those students who are majoring in supply chain would benefit the most from this case study. This case study has elements of supply chain management, supply chain strategy, warehousing and logistics, and a digital supply chain for Industry 4.0. The learning outcome of this case study could be seen if the students are able to identify the challenges and opportunities of a digital supply chain for Industry 4.0 and how it could be implemented methodically. Teaching Objective 1: Students should be able to identify what challenges organizations face if they implement a digital supply chain for Industry 4.0. Teaching Objective 2: Students should be able to identify what opportunities can be tapped if Big Data Analytics are used in a supply chain teaching. Objective 3: Students should layout a methodical plan of how an analogue company can gradually achieve the objective of implementing a digital supply chain for Industry 4.0 in procurement function.

Case overview/Synopsis

Based in the Lahore region of Pakistan, Xarasoft is a footwear manufacturing company which has undertaken a decision to transcend to a digital supply chain for Industry 4.0 by 2027. Asif, who is the Head of the Department of Supply Chain, has to come up with a plan to present in the next meeting with the CEO. Xarasoft is a company that preferred to work in an analogue routine. The company set production targets and sold goods through marketing. With no forecast or exact demand, the company had decided to procure 140 million units of raw material and carrying a huge inventory, a percentage of which had to be thrown away as it started to degrade. While the company did have machinery on the production floor, they were operated manually and were a generation behind. Asif faced the question of what challenges he would face and exactly how would a digital supply chain for Industry 4.0 be implemented in the company.

Complexity academic level

Masters level supply chain courses

Supplementary materials

Teaching notes are available for educators only.

Subject code

CSS 9: Operations and Logistics.

Abstract

Subject area

Information Systems – IT Strategy Design and Implementation.

Study level/applicability

The case can be discussed in Marketing Management courses and IT Strategy classes in MBA, executives from NGOs who are participating in Management Development Programs, etc. It can also be used in entrepreneurship classes. The case serves as an illustration to entrepreneurship projects, and so this case can be discussed in training program for budding entrepreneurs intending to implement cloud in its IT infrastructure.

Case overview

E-commerce is big nowadays in India. In e-commerce, particularly e-tail in India is witnessing a boom with players reporting achieving revenue targets earlier than anticipated. Though e-tail sites are now ubiquitous and dime a dozen with multiple offerings or specialized offerings, the e-grocery model is yet to take off on a large scale across India. E-grocery model has its unique challenges on both supply as well as distribution side unlike other e-tail business. As it deals with perishable items, it faces challenges in supply chain, procurement, inventory management, cold storage management, quality and logistics. To solve such problems, high degree of localization is needed for players in this business. It requires them to open up multiple warehouses at strategic locations in a city if they decide to have control over the goods they sell. Start-ups in this space face the problems in monitoring inventory levels across warehouses where they use disparate Point of Sales (POS) systems. There is a lack of synchronization among the POS applications across the warehouses for which they are able to take the benefit of economies of scale during procurement and distribution. Also, they face stock out and excess inventory across stock keeping units (SKUs). To solve this problem, a strategy is needed so that they can maintain data for all its warehouses through a single database and also by which they can scale up easily and at a lower investment without disturbing continuity in business.

Expected learning outcomes

Following are the learning outcomes: to learn about the business model and market ecosystem of an e-tailing business dealing in grocery items in a tier-II city in its introduction phase of organizational life cycle, to learn about various processes involved in online ordering of an item from an e-commerce website, to understand the various challenges faced by an organization dealing in e-tailing business in its introduction phase and to find out whether IT Strategy can be of help to overcome these challenges, to have an understanding of the Balance Score Card and Departmental Score Card, to understand how cloud can be of help to overcome the challenges and what are the possible cloud architectures to address such problems, to get an idea about how return on investment can be measured for finding feasibility of investment in cloud and to have the understanding of risk associated with implementing cloud and the cost of mitigating those risks.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Subject code

CSS:11 Strategy.

Details

Emerald Emerging Markets Case Studies, vol. 6 no. 3
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 17 October 2012

Japhet Gabriel Mbura

This case study intends to add knowledge and understanding of supply chain management particularly with respect to international logistics.

Abstract

Subject area

This case study intends to add knowledge and understanding of supply chain management particularly with respect to international logistics.

Study level/applicability

The case study can be used in both undergraduate and postgraduate levels. Students pursuing Master of Science in Logistics, Supply Chain Management and those doing bachelor degrees in the same areas can have a better insight and special interest of the case. Professional boards may also use the case to empirically make students understand this area.

Case overview

The railway sub-sector in East Africa – Tanzania in particular – is an important transport mode but has a declining performance. The market share is estimated at only 4 percent of the freight market. Still knowledge about traffic, particularly for freight, is scant. The main dilemma is whether traffic of the central corridor is more intra- or inter-Tanzania. The case studies techniques appropriate for meaningful traffic forecasting and through a simple regression model it resolves the freight conflicts between Kenya rail and the Central Corridor. It provides students with applied traffic forecasting tools.

Expected learning outcomes

The case focuses on techniques of traffic forecasting, development of traffic scenarios and on issues related to intermodal transport especially between road, rail and ocean. At the end of using this Case students should be able to: explain the methods, techniques and models used in traffic forecasting; understand intermodal linkages in international Logistics; use different approaches to make logistics market assessment; and forecast traffic in all modes using different scenarios.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or e-mail support@emeraldinsight.com to request teaching notes.

Abstract

Subject area

Management Strategy.

Study level/applicability

Management Graduates and Post-Graduates.

Case overview

Today, tourism is one of the fastest growing industries throughout the world. The tourism industry plays a very crucial role in the country’s economy, as it not only contributes towards the national income but also brings beneficial spillover directly or indirectly on the other industries. Tourism is the most important source of income for many emerging countries. India, a newly emerging economy, also depends, to a great extent, on tourist income. However, this sector continues to not make optimal contribution in India. In today’s competitive arena, the state tourism corporations must use all possible means to maximise growth and profitability through pegging up the rate of tourist arrivals. There is a general agreement in the tourism industry at the theoretical level about the imperative of a public – private partnership (PPP) in serving this objective. PPP aims to synergise the efforts of the two components in the general development of society and increase in competitiveness. The public–private partnership in tourism industry is at an emerging stage and could be developed in various ways. This case study highlights the key learning from Delhi Tourism’s experience on how PPP can be implemented in the tourism sector. This case study discusses an opportunity for Delhi Tourism which can alter the landscape of the tourism industry of India and also the rejuvenation of Delhi Tourism, a public sector corporation, through PPP.

Expected learning outcomes

The case will give a clear understanding of the dynamics and environmental factors governing a mixed economy like India. The reasons for the PPP can be analysed through the case. Students can understand the strategic choice of taking a private partner by a public sector in a very dynamic industry, i.e. the tourism sector.

Supplementary materials

Teaching notes are available for educators only. Please contact your library to gain login details or email support@emeraldinsight.com to request teaching notes.

Details

Emerald Emerging Markets Case Studies, vol. 5 no. 4
Type: Case Study
ISSN: 2045-0621

Keywords

Case study
Publication date: 20 January 2017

David Besanko and João Tenreiro Gonçalves

Rede Alta Velocidade, SA (RAVE), the state-owned company responsible for planning and developing a major high-speed rail project in Portugal, must persuade both public officials…

Abstract

Rede Alta Velocidade, SA (RAVE), the state-owned company responsible for planning and developing a major high-speed rail project in Portugal, must persuade both public officials and lenders that the project is worth undertaking. It must also make a recommendation on the appropriate organizational form for the enterprise. Specifically, it must determine the role of the Portuguese government in financing and operating the high-speed rail network, with options ranging from full development and management of the project by the public sector to completely private development and management. Lying in between these two polar cases were a variety of hybrid models, often referred to as public-private partnerships (PPPs). Using data in the case, students have the opportunity to perform a benefit-cost analysis of the project. They also must think carefully about the optimal role of the government in a major new infrastructure project.

After analyzing and discussing the case, students will be able to:

  • Understand the nature of a global public good

  • Perform a back-of-the-envelope benefit-cost analysis of polio eradication

  • Discuss the appropriate strategy for eradicating an infectious disease

  • Apply game theory to analyzing which countries would be likely to contribute funds toward global polio eradication

  • Discuss the role of private organizations in the provision of global public goods

Understand the nature of a global public good

Perform a back-of-the-envelope benefit-cost analysis of polio eradication

Discuss the appropriate strategy for eradicating an infectious disease

Apply game theory to analyzing which countries would be likely to contribute funds toward global polio eradication

Discuss the role of private organizations in the provision of global public goods

Details

Kellogg School of Management Cases, vol. no.
Type: Case Study
ISSN: 2474-6568
Published by: Kellogg School of Management

Keywords

Case study
Publication date: 30 January 2024

Anyu Wang and Nuoya Chen

This case is about “Red”, a cross-border e-commerce platform developed from a community which was built to share overseas shopping experience. With sharp insights into the…

Abstract

This case is about “Red”, a cross-border e-commerce platform developed from a community which was built to share overseas shopping experience. With sharp insights into the consumption behavior of urban white-collar women and riding on its community e-commerce advantage, “Red”, a cross-border e-commerce startup, pulled in three rounds of financing within just 16 months regardless of increasingly competitive market. On the other hand, well-established platforms such as T-mall International and Joybuy also stepped in, and their involvement will also speed up the industry integration and usher in a reshuffling period. Confronted with the “price war” started by those e-commerce giants, in what ways can “Red” adjust its shopping experience and after-sales services to enhance the brand value and sharpen its edge?

Details

FUDAN, vol. no.
Type: Case Study
ISSN: 2632-7635

1 – 10 of 196