Search results

1 – 10 of over 17000
Article
Publication date: 30 August 2019

Yang Wang, Jing Liu, Jian Zuo and Raufdeen Rameezdeen

The purpose of this paper is to investigate driving factors that improve the project management efficiency (PME) in centralized public procurement systems.

1102

Abstract

Purpose

The purpose of this paper is to investigate driving factors that improve the project management efficiency (PME) in centralized public procurement systems.

Design/methodology/approach

Employees in four public-sector organizations in China were surveyed. The structural equation modeling was employed to examine the relationship amongst those variables.

Findings

Organizational culture (OC) is an effective method to improve PME, and employee quality is the most critical factor of OC in this system. Job satisfaction (JS) is another significant contributor to PME and satisfaction with fairness of salary in this system being the key factor of JS. Job analysis (JA) has indirect influence on PME through JS and OC, whereas the job structure in this system is the most critical factor for JA.

Practical implications

An operational way to improve PME is to implement it from the perspectives of employee, organization and technique. At the organizational level, it is imperative to strengthen the OC by a well-structured recruitment system and to improve PME via well-design training. At the person level, both financial (i.e. income and welfare) and career incentives (i.e. promotion opportunities and a sense of belonging) are proposed to achieve employees’ JS to improve PME. At the technique level, JA approach (i.e. job rotation) is recommended to enlarge the positive influence of OC and JS on PME. These can not only ensure the management professionalism in a centralized public procurement system but can also motivate employees and maximize PME.

Originality/value

PME in a centralized public procurement system will be improved by addressing these key factors and their interrelationships. This provides detailed pathways for the centralized public procurement system to achieve better PME via optimal OC and JS and reasonable JA in China. In addition, the institutional and administrative traditions may vary significantly across cities, regions and countries. Therefore, such contextual differences should be taken into consideration for the improvement of PME in a centralized public procurement system.

Details

Engineering, Construction and Architectural Management, vol. 27 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2010

Mi Jung Lee

There are Increasing applications of e-procurement by government along with active e-commerce by the private sector in an advanced information society. The Korea e-Procurement

Abstract

There are Increasing applications of e-procurement by government along with active e-commerce by the private sector in an advanced information society. The Korea e-Procurement System (G2B) is recognized as a successful example of substantially enhancing procurement process efficiency by making it transparent and professional. An analytic work is needed to systematically assess the functionality and role of the system. This paper's purpose is the exploratory study on a mature indicator of evaluation of public e-procurement systems. This paper compares Korea’s case with those of the U.S., Australia, and New Zealand to show that in Australia and New Zealand, which are adopting a as dispersive supply method, the e-procurement system is not developed on a large scale in comparison with the US and Korea that are adopting a central supply method. There are some differences among the four countries according to the trait of their procurement institution and base value in terms of capability of system. Different usefulness for e-procurement depends on the public procurement institution in each country. This paper suggests that eprocurement systems can be used helping purchasing goods and services most reasonably. This paper can help us evaluating substantial value of eprocurement system clearly.

Details

Journal of Public Procurement, vol. 10 no. 3
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 March 2012

Robert E. Lloyd

This paper examines automated contract writing systems, a vital aspect of public procurement which has replaced the more manual methods of drafting of contracts used in the past…

Abstract

This paper examines automated contract writing systems, a vital aspect of public procurement which has replaced the more manual methods of drafting of contracts used in the past. Using the system of the U.S. federal government as an illustration, the various components of a contract writing system are detailed and discussed, distinguishing contract writing from eprocurement and demonstrating how a bifurcated approach has been adopted for contracting automation. The larger implications of this dual nature are analyzed along with misconceptions about contract writing systems and the contrast between the perspectives of procurement versus finance. Future research devoted more to cross-disciplinary issues and human factors affecting contract writing, rather than just systems development issues, may offer an opportunity to improve the effectiveness of public procurement automation.

Details

Journal of Public Procurement, vol. 12 no. 3
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 March 2016

Youssef G. Saad

Taints of corruption in public procurement (PP) exist in both developed and developing countries alike- though in different scales and with different characteristics and impacts…

Abstract

Taints of corruption in public procurement (PP) exist in both developed and developing countries alike- though in different scales and with different characteristics and impacts. Attempts to achieve a taint-free procurement regulation have failed even in the most robust and mature jurisdictions due to an inherent complexity and difficulty given the paradigms used. PP systems today remain fragile to various shocks2 coming mainly from markets and corruption. This paper proposes a paradigm shift in the way in which a PP System (PPS) should be designed and practiced rendering it as “antifragile”3 as possible to benefit from shocks, stresses and disorder. Antifragile PPS design revolutionizes not only the regulations but also the frameworks and institutional setups and the whole practice of the public procurement profession in a manner that permits growth and evolution at times of stress or distress. This paradigm shift is based on a design of the PPS as a complex system.

Details

Journal of Public Procurement, vol. 16 no. 4
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 April 2001

Khi V. Thai

Academically, public procurement has been a neglected area of study even though governmental entities and public procurement practitioners have diligently worked to improve public

1937

Abstract

Academically, public procurement has been a neglected area of study even though governmental entities and public procurement practitioners have diligently worked to improve public procurement practices. This article will identify common elements of public procurement knowledge through a brief analysis of the literature and will provide a summary of government efforts to improve public procurement practices. In addition, this article will comprehensively re-examine public procurement by using a systems approach as a method of inquiry. Finally, implications of the proposed public procurement system regarding future research and study will be discussed.

Details

Journal of Public Procurement, vol. 1 no. 1
Type: Research Article
ISSN: 1535-0118

Open Access
Article
Publication date: 16 November 2022

David Špaček and Zuzana Špačková

Scholarly research on e-procurement has been limited and, like e-government, e-procurement has been researched primarily from the perspective of adoption/non-adoption. This paper…

1620

Abstract

Purpose

Scholarly research on e-procurement has been limited and, like e-government, e-procurement has been researched primarily from the perspective of adoption/non-adoption. This paper aims to focus on public administration employees’ perceptions of the quality of národní elektronický nástroj (NEN) – the Czech national e-procurement tool they are required to use.

Design/methodology/approach

The paper is based primarily on statistical analysis of data obtained through two questionnaire surveys addressed to contacts from of all Czech central state administration bodies using NEN; 175 completed questionnaires were gathered in 2020 and 128 in 2022 and subjected to statistical analysis in SPSS.

Findings

NEN was launched as fully operational in August 2015. The research indicates that in 2022 there were still important gaps in the quality of NEN as perceived by public employees.

Social implications

The paper has important practical implications for e-procurement policymakers. It shows that making the e-procurement system compulsory is not sufficient. The government needs to guarantee that it would be competitive with tools that would otherwise be preferred. Otherwise, the application of the digital-by-default principle may lead to institutionalisation of services that are not user-friendly. This has important implications for e-government/e-procurement management and change management.

Originality/value

Little is known about public employees’ perceptions of the quality of e-government and e-procurement. Although e-procurement is an area where the digital-by-default principle was implemented rather early, the quality of e-procurement has still received limited attention in research.

Details

Journal of Public Procurement, vol. 23 no. 1
Type: Research Article
ISSN: 1535-0118

Keywords

Abstract

Details

Public Procurement Fundamentals
Type: Book
ISBN: 978-1-78754-608-0

Article
Publication date: 1 March 2008

Benon C. Basheka

The contribution of planning in facilitating an efficient and effective performance of public sector organizations is generally undisputed in both developed and developing…

Abstract

The contribution of planning in facilitating an efficient and effective performance of public sector organizations is generally undisputed in both developed and developing countries. Its contribution can be at both central and local government levels of public sector management. This article examines the relationship between procurement planning and accountability of local government procurement systems in Uganda. The findings arose from a study that was conducted among 99 local government stakeholders selected from 11 Districts of Uganda, using a correlation research design. The data was analyzed using principal component factor analysis that aimed at identifying the critical components of procurement planning and accountable local governments systems in Uganda. Consequently, correlation analysis to establish the direction and magnitude to which the two variables were related was conducted and results are presented. The findings revealed a significant positive relationship between procurement planning and accountable local government procurement systems in Uganda. These results are compared to international research findings, and suggestions are offered for management, policy making, future research and efficient accountable local government operations.

Details

Journal of Public Procurement, vol. 8 no. 3
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 April 2017

Emmanuel Botlhale

Public procurement accounts for a big proportion of public budget outlays, hence, it is important that there be demonstrated Value for Money (VfM) in public purchases. To ensure…

Abstract

Public procurement accounts for a big proportion of public budget outlays, hence, it is important that there be demonstrated Value for Money (VfM) in public purchases. To ensure VfM in public procurement, Botswana introduced a modern public procurement system in early 2001. The system is yet to be subjected to VfM analysis. Using document analysis, this paper explores two main research questions: (i) what are key public procurement challenges in Botswana?; and (ii) how can public procurement in Botswana be improved? It is concluded that the public procurement system in Botswana is not constructed on a VfM basis. It is consequently suggested that there is a need for public procurement reforms and the adoption of various private sector continuous improvement tools such as Lean, Kaizen and Six Sigma.

Details

Journal of Public Procurement, vol. 17 no. 3
Type: Research Article
ISSN: 1535-0118

Article
Publication date: 1 March 2006

Kishor Vaidya, A. S. M. Sajeev and Guy Callender

This paper presents the results of a literature survey developed to support a proposed model of the Critical Success Factors (CSFs) likely to impact the success of e-Procurement

1460

Abstract

This paper presents the results of a literature survey developed to support a proposed model of the Critical Success Factors (CSFs) likely to impact the success of e-Procurement initiatives in the public sector. It identifies a number of relevant variables for each CSF and presents a model for future research. It also analyses the relative importance of different CSFs and observes that organization and management factors are the most important category for success of e-Procurement initiatives. If e-Procurement initiatives in the public sector are to assist the development of e-Procurement across the information economy, there should be wider discussion and agreement on what constitutes the relevant CSFs and how the achievement of success can be assessed.

Details

Journal of Public Procurement, vol. 6 no. 1/2
Type: Research Article
ISSN: 1535-0118

1 – 10 of over 17000