Article
Publication date: 5 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Tianxin Li and Mengqi Yuan

Off-site construction (OSC) has been regarded as a clean and efficient production approach to help the construction industry towards sustainability. Different levels of OSC…

Abstract

Purpose

Off-site construction (OSC) has been regarded as a clean and efficient production approach to help the construction industry towards sustainability. Different levels of OSC technologies vary greatly in their implementations and adoptions. Compared to low OSC level technologies have been applied widely, the adoption of high OSC level technologies (HOSCLTs) in practice remains limited. The adoption mechanism for HOSCLTs by firms has not been clear, hindering their promotion. This study aims to explore the mechanism combining subjective and objective adoption for HOSCLTs.

Design/methodology/approach

This study developed an integrated model illustrating mechanism for HOSCLTs adoption based on the technology acceptance model (TAM), which has strong capacity to explain potential adopters' subjective intentions to adoption, and the task-technology fit (TTF) theory, which well describes the linkages between the task, technology and performance in technology adoption. The proposed model was then empirically evaluated through a survey of 232 practitioners in the Chinese OSC industry using partial least squares structural equation modeling.

Findings

The results indicate that both task characteristics (TAC) and technology characteristics (TEC) positively affect TTF of HOSCLTs. TAC, TTF, firm conditions and stakeholder influence have significant positive effects on perceived usefulness (PU), which further positively influence attitude towards adoption. TEC and firm conditions are significantly related to perceived ease of use (PEU). TTF, PEU and attitude towards adoption are good predictors of behavior intention to HOSCLTs adoption. PEU only significantly influences adoption intention and is not observed to influence attitudes and PU, unlike prior research on common OSC adoption.

Originality/value

This study contributes to the body of knowledge by exploring HOSCLTs adoption in the industry based on distinguishing the levels of OSC technologies and supplementing an integrated model for explaining the mechanism with the combination of subjective and objective adoption. The study also provides useful insights into understanding and promoting HOSCLTs adoption for policy makers and stakeholders actively involved in the OSC field.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 3 May 2023

Lars Stehn and Alexander Jimenez

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels…

Abstract

Purpose

The purpose of this paper is to understand if and how industrialized house building (IHB) could support productivity developments for housebuilding on project and industry levels. The take is that fragmentation of construction is one explanation for the lack of productivity growth, and that IHB could be an integrating method of overcoming horizontal and vertical fragmentation.

Design/methodology/approach

Singe-factor productivity measures are calculated based on data reported by IHB companies and compared to official produced and published research data. The survey covers the years 2013–2020 for IHB companies building multi-storey houses in timber. Generalization is sought through descriptive statistics by contrasting the data samples to the used means to control vertical and horizontal fragmentation formulated as three theoretical propositions.

Findings

According to the results, IHB in timber is on average more productive than conventional housebuilding at the company level, project level, in absolute and in growth terms over the eight-year period. On the company level, the labour productivity was on average 10% higher for IHB compared to general construction and positioned between general construction and general manufacturing. On the project level, IHB displayed an average cost productivity growth of 19% for an employed prefabrication degree of about 45%.

Originality/value

Empirical evidence is presented quantifying so far perceived advantages of IHB. By providing analysis of actual cost and project data derived from IHB companies, the article quantifies previous research that IHB is not only about prefabrication. The observed positive productivity growth in relation to the employed prefabrication degree indicates that off-site production is not a sufficient mean for reaching high productivity and productivity growth. Instead, the capabilities to integrate the operative logic of conventional housebuilding together with logic of IHB platform development and use is a probable explanation of the observed positive productivity growth.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 20 September 2022

Sara Rankohi, Mario Bourgault and Ivanka Iordanova

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration…

Abstract

Purpose

Recent construction literature has been focusing more on integrative contracting approaches such as integrated project delivery (IPD). However, conceptual studies on integration in IPD literature are scattered and fragmented, that is, most of the studies only focused on the segmented dimension of integration. A systemic understanding of the concepts of integration in IPD project-based context is still lacking. To fill this gap, this paper analyzes two aspects of integration (dimensions and directions) in IPD literature and explores their extent in construction projects.

Design/methodology/approach

Grounded theory review and focus group discussion approaches were employed to perform a thorough conceptual review of the literature, frame the research into the theory and increase the fundamental understanding of the concept of integration in IPD literature.

Findings

In this study, IPD integrating techniques were identified and their integration dimensions and directions were discussed. Results show that integration in the project-based environment of IPD is a multidimensional construct. Based on organizational, contractual and operational characteristics of IPD projects, twenty-four integration mechanisms were identified and framed into seven clusters. The integration directions over project life-cycle were demonstrated in three contexts: (1) an on-site construction project, delivered traditionally, (2) an on-site construction project, delivered with IPD and (3) an off-site construction project, delivered with IPD.

Originality/value

This paper gathers the segments of integration into a comprehensive overview, which can help researchers and practitioners explore elements of IPD project success more precisely. A theoretical framework of integration clusters is developed, based on IPD literature. The impact of IPD on on-site versus off-site construction is illustrated from an integration direction perspective. Finally, future areas of studies for researchers and practitioners about the concept of integration in an IPD context are discussed. This paper provides a point of departure for future theoretical and empirical explorations.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79331

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 14 April 2023

Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Paramjit Singh Jamir Singh, Mohamad Shaharudin Samsurijan and Mahathir Yahaya

This study presents the results of an assessment of the barriers that can hinder the deployment of robotics and automation systems in developing countries through the lens of the…

Abstract

Purpose

This study presents the results of an assessment of the barriers that can hinder the deployment of robotics and automation systems in developing countries through the lens of the Nigerian construction industry.

Design/methodology/approach

A scoping literature review was conducted through which barriers to the adoption of robotics and automation systems were identified, which helped in the formulation of a questionnaire survey. Data were obtained from construction professionals including architects, builders, engineers and quantity surveyors. Retrieved data were analyzed using percentages, frequencies, mean item scores and exploratory factor analysis.

Findings

Based on the mean scores, the top five barriers were the fragmented nature of the construction process, resistance by workers and unions, hesitation to adopt innovation, lack of capacity and expertise and lack of support from top-level managers. Through factor analysis, the barriers identified were categorized into four principal clusters namely, industry, human, economic and technical-related barriers.

Practical implications

This study provided a good theoretical and empirical foundation that can be useful to construction industry stakeholders, decision-makers, policymakers and the government in mapping out strategies to promote the incorporation and deployment of automation and robotics into the construction industry to attain the safety benefits they offer.

Originality/value

By identifying and evaluating the challenges that hinder the implementation of robotics and automation systems in the Nigerian construction industry, this study makes a significant contribution to knowledge in an area where limited studies exist.

Details

Smart and Sustainable Built Environment, vol. 13 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 12 April 2023

Arpit Singh, Vimal Kumar, Ankesh Mittal and Pratima Verma

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Abstract

Purpose

This study aims to set out to identify and evaluate potential obstacles to successfully implementing lean construction (LC) as a result.

Design/methodology/approach

Several indicators were recognized as major obstacles following an exhaustive assessment of the literature and a multicriteria decision analysis based on the analytic hierarchy process (AHP) of information obtained from a questionnaire survey that was directed to practitioners in the Indian construction industry.

Findings

The results of this AHP model suggest that “Managerial” and “Inadequate resources” categories with a priority weight of “0.361” and “0.309” have the highest levels of influence, respectively, while “Inadequate knowledge” and “just in time (JIT)” categories with a priority weight of “0.053” and “0.034” have the lowest levels of influence, respectively.

Research limitations/implications

Construction companies can use the study’s findings as a guide to determine whether they are ready to embrace LC, learn more about the components needed for implementation or investigate any challenges that may arise. These businesses can then create plans to promote the adoption and application of the lean philosophy.

Originality/value

The Indian construction industry may see great success with LC management initiatives. LC concepts have been adopted by many nations, but during the past 20 years, there has only appeared to be a limited amount of lean implementation in the Indian construction industry. It seems that several structural and cultural barriers are preventing its effective implementation. Organizations will not be able to determine what improvement efforts are required, where these efforts should be directed or which initiatives could provide the best outcomes if they are unaware of the elements that influence the effective implementation of LC.

Details

Construction Innovation , vol. 24 no. 1
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 22 September 2023

Ayodeji Emmanuel Oke, John Aliu, Patricia Fadamiro, Feyisetan Leo-Olagbaye, Paramjit Singh Jamir Singh and Mohamad Shaharudin Samsurijan

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their…

Abstract

Purpose

Global construction sector studies have significantly explored the impact of automation techniques, revealing their transformative potential. However, research on their application within specific local contexts, especially in developing countries like Nigeria, is sparse. Nigeria presents a unique context marked by challenges such as skilled labor shortage, safety concerns and cost efficiency. Therefore, investigating the implementation of automation techniques in the Nigerian construction industry is crucial to address these challenges, bring transformative advancements and contribute to a more balanced global discourse on automation adoption. This study aims to fill this significant research gap.

Design/methodology/approach

A mixed research method was deployed which combined both qualitative and quantitative data collection and analysis. Two focus group discussions conducted with 23 experts from both industry and academic institutions (qualitative) yielded 17 drivers which were used to formulate a well-structured questionnaire (quantitative), which was disseminated to construction professionals. Collected data underwent analysis through various statistical techniques, including percentages, frequencies, mean item scores and exploratory factor analysis.

Findings

Principal component analysis (PCA) yielded four driver clusters namely: (1) performance-related drivers, (2) visualization and efficiency-related drivers, (3) technological and human-related drivers and (4) economic-related drivers.

Practical implications

The study provides empirical insights that can aid stakeholders, decision-makers, policymakers and the government in formulating strategies to promote automation techniques in the Nigerian construction industry and beyond.

Originality/value

This study's originality lies in its exploration of the untapped potential of automation techniques in the Nigerian construction industry, offering novel perspectives on how these technologies can address specific challenges such as skilled labor shortage, safety concerns and cost efficiency, thereby paving the way for transformative advancements in the sector.

Details

Built Environment Project and Asset Management, vol. 13 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 11 August 2022

Yanhu Han, Xiyu Yan and Poorang Piroozfar

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to…

1858

Abstract

Purpose

As a strand in industrialization movement in architecture, engineering and construction (AEC) industry, prefabricated construction (PC) has gained widespread popularity due to high efficiency, energy saving, low environmental impacts, safety and other advantages of PC. Well-managed supply chain can further leverage the advantages of PC. However, there is a lack of more systematically overview of the prefabricated construction supply chain (PCSC). This paper aims to comb the current status and look into the future direction of PCSC by reviewing the existing research.

Design/methodology/approach

In total, 131 articles related to prefabricated construction supply chain management (PCSCM) from 2000 to 2022 have been collated to (1) conduct a bibliometric analysis by using VOSviewer, including the literature sources, keywords co-occurrence, co-authorships, authorship citation and country active in the field of PCSCM; (2) classify and summarize the status of research in PCSCM through qualitative discussion and (3) point out the future research directions.

Findings

In total, 131 articles are carried out for bibliometric analysis and in-depth qualitative discussion, the visualization maps and the main research themes in the field of PCSCM are obtained. The results show that supply chain intelligentization and informatization are hot topics. Finally, future research directions that should be paid attention to in the field of PCSCM are pointed out.

Practical implications

This study can help project managers understand the current status and problems of PCSC operations and provide a basis for future management decisions.

Originality/value

Compared with previous studies, this study adds the dimension of “article authorship” to the quantitative analysis and discusses the research themes in the field of PCSCM in a comprehensive manner. In addition, this paper deeply discusses the main research topics from both the specific contents and research methods adopted.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 June 2022

Emmanuel Itodo Daniel and Olalekan Oshodi

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Abstract

Purpose

The purpose of this study is to present an overview of the existing knowledge on the combined application of lean, off-site and simulation (LOS) in housing delivery.

Design/methodology/approach

A systematic literature review approach was adopted. Based on a comprehensive search using Scopus, Web of Science and the International Group for Lean Construction databases, 66 relevant journal articles were identified and analysed.

Findings

This study found that the most significant impacts of the combined application of LOS in housing delivery are the capacity to visualise the production processes as a whole in real time, exposure and removal of non-value-adding activities from the production and faster delivery. However, the combined application of LOS is low compared to a single application of each technique in housing delivery.

Practical implications

The results provide relevant stakeholders and actors in the housing sector (private and public housing developers, off-site housing manufacturers and constructors, housing associations and government housing agencies, among others) with the information needed to improve the outcomes of housing delivery through the application of LOS.

Originality/value

This study contributes to the ongoing debate on addressing the global housing shortage by presenting an integrated overview of the existing knowledge on the impact of the nexus of LOS and providing compelling evidence for its usage in housing delivery. It also demonstrates how the combined application of LOS supports the achievement of the flow and value view in the transformation flow value model, which was not previously reported.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords