1 – 10 of 494This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors…
Abstract
Purpose
This research studies the behavior choice of key actors in the construction supply chain and constructs a model which includes the benefit function of the government, contractors and owners, aiming at improving the coverage of green buildings.
Design/methodology/approach
In this paper, tripartite dynamic game is studied and simulated based on duplicate dynamic equation. The tripartite game under government intervention is rarely considered, and government punishment measures are seldom introduced into the research.
Findings
According to the simulation results, the practical insights in line with the development of green supply chain are put forward. Rewards and punishments affect the development of the supply chain. New technologies and new materials accelerate the development of green supply chain and then improve the coverage of green buildings.
Research limitations/implications
This paper constructs a dynamic model based on complete information rationality, which is difficult to realize in practice, for information is incomplete and human rationality is limited.
Originality/value
In fact, the government has not issued a punishment document to introduce a new variable adjustment model.
Details
Keywords
Joseph Kuruneri and Wiston Zivanai
Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to…
Abstract
Purpose
Governments worldwide seek to optimize value in public project bids. Social procurement (SP) has become a global tool for achieving project goals. The purpose of this study is to assess the understanding of SP among contractors and identify its drivers to optimize the value associated with public projects.
Design/methodology/approach
A total of 15 major contractors were interviewed to obtain their views on SP, appreciate their current practices and identify the main drivers of SP in projects. A semistructured interview was used to gather relevant data. Neo-institutional theory is the lens of the study used to provide the focus of the research. The collected data were analyzed using the thematic data analysis technique.
Findings
The study found that SP is understood as corporate social responsibility and is not handled in a structured manner guided by policies or clearly defined procedures. Additionally, research has shown that compliance requirements, rather than value and goodwill, are the main inspiration for SP practices.
Research limitations/implications
The study’s limitation is the fact that it was conducted in the context of Botswana and only used the interview technique as the solo data collection method. The other limitation is the lack of empirical literature on SP concerning the lack of SP policy in Botswana.
Originality/value
This study raises awareness of the concept of SP among contractors in Botswana and eases its implementation within the industry.
Details
Keywords
The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants'…
Abstract
Purpose
The purpose of this research is to identify the constraints and restrictions and their impact on the construction projects in Saudi Arabia from three key participants' perspectives for the planning stage.
Design/methodology/approach
Using a descriptive-analytical approach, this research described and analyzed the frequency and severity of failure factors in construction projects in the planning stage using a five-Likert scale questionnaire in Saudi Arabia construction between 2019 and 2020. A total of 100 experts from contractors, consultants and owners were included in the study.
Findings
The findings have shown that time dispute was the major factor affecting the projects to be failed. Similarly, cost overrun and total abandonment have an impact on project failures. The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.
Research limitations/implications
Further research is needed to investigate the relationship between failure characteristics and project success measures in the same stage, in addition to, factors of failure for construction projects' life-cycle stages.
Originality/value
The findings have indicated that government officials were involved in delaying the projects while contractors also failed in the project deliveries.
Details
Keywords
Inimbom Walter Isang and David Ojimaojo Ebiloma
Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction…
Abstract
Purpose
Covid-19 pandemic have raised serious health concerns, work disruptions and job loss. Thus, Nigeria’s Covid-19 challenges can hinder project performance in the construction sector. By integrating the principle of sustainable construction, it can minimise the environmental and socio-economic impact of Covid-19. This research therefore aims at developing strategies to achieve sustainable project performance in the post-Covid era in Nigeria.
Design/methodology/approach
A qualitative research method was used. Data was collected from 13 stakeholders in the built environment. Percentages and thematic analysis were used to analyse data from the interviews.
Findings
The study reveals that stakeholders are encountering operational and financial challenges: Increased price of materials, labour and material shortage and project delays were key operational challenges. The financial challenges were related to increased construction cost, reduced profit and payment delays. To address these challenges, the study developed managerial, contractual and governmental strategies: Market survey and bulk purchase, remote working and adherence to Covid-19 protocols were among the key managerial strategies. For the contractual strategies: contracts reviews, smart contracts, working overtime and night shift were developed, while governmental strategies included provision of funds, loans and incentives for workers.
Originality/value
The study deduced that while environmental sustainability was employed to address the Covid-19 challenges, the economic and social aspects were found to be under-utilized. Therefore, the study concluded that a holistic application of environmental, economic and social sustainability themes while incorporating managerial, contractual and governmental strategies is significant for achieving sustainable project performance in the post-Covid era in Nigeria.
Details
Keywords
AbdulLateef Olanrewaju, Jack Son Khor and Christopher Nigel Preece
Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad…
Abstract
Purpose
Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad health each year. Scaffolding accidents are the second cause of accidents on construction sites. Therefore, this present research provided answers to the following questions: (1) what are the causes of scaffolding accidents and (2) what are the possible measures to reduce scaffolding accidents?
Design/methodology/approach
The research developed a questionnaire instrument that included 24 causes of scaffolding accidents and 21 remedial actions. The research was based on a cross-sectional survey questionnaire administered to 129 members of construction organizations.
Findings
Data revealed that scaffolding-related cases caused a total of 70% of the deaths/injuries on sites. Furthermore, scaffolding accidents were mainly caused by a lack of guard rails on scaffoldings, poor inspections, improper assembly, a poor safety culture, poor attitudes towards safety, poor footing of scaffoldings and unsecured planking. To reduce scaffolding accidents, there must be a lifeline on scaffolding, proper guardrails and proper assembling of scaffoldings, and preventing access to incomplete or defective scaffoldings. The 24 causes are structured into six factors through factor analysis and the 21 remedial actions into six factors.
Originality/value
This research serves as the first attempt to conduct broad research on the causes and remedial actions concerning scaffolding accidents on construction sites in Malaysia. Theoretically, the research has provided fresh insights into the impact of scaffolding accidents.
Details
Keywords
In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the…
Abstract
Purpose
In addressing the housing deficits for the less privileged citizens, the South African government began constructing social housing after coming to power in 1994. However, the construction of these houses is bedevilled with many issues; prominent among them are poor quality of the constructed houses. This study seeks to develop a quality management framework for achieving quality and efficiency in public-sector housing construction, a hallmark of the country's procurement goals.
Design/methodology/approach
Telephone interviews were conducted with construction professionals involved in constructing government social houses across South Africa, chosen randomly. The data gathered were analysed using the content analysis method.
Findings
The study found that the most significant cause of poor quality government-constructed social housing is multifaceted, categorised into project management-related, procurement-related, contractor-related, corruption-related and political-related.
Practical implications
Failure to develop and implement a quality management framework on government-constructed social housing leads to poor quality social housing.
Originality/value
The study has identified quality-related issues and has developed a Quality Management (QM) framework for the stakeholders involved in the construction of the houses to guide them in the project implementation process to ensure project success and quality standards.
Details
Keywords
Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Godspower C. Amadi and Okechukwu Dominic Saviour Duru
In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business…
Abstract
Purpose
In most developing countries, indigenous emerging construction contractors (ECCs) face severe problems of not adopting a project management framework (PMF) in their business activities. It has increased their business risk and threatened their sustainability. Studies showed that government policy support (GPS) helps mitigate business risks. Thus, there is a paucity of literature concerning GPS on emerging Nigerian construction contractors' business sustainability. Therefore, the paper aims to investigate the moderating effect of GPS on the relationship between PMF and ECCs in Nigeria.
Design/methodology/approach
SmartPLS was used to analyse the collected data from the useable 310 questionnaires retrieved from respondents in Abuja and Lagos, Nigeria. Systems Theory was used to support the developed framework.
Findings
Findings show that government policy support significantly moderates the relationships between PMF and ECCs in the Nigerian construction sector. It implies that the study's results offer more understanding regarding issues affecting construction entrepreneurs' sustainable business cycle via applying PMF to mitigate business sustainable associated risks.
Practical implications
The study will stir Nigeria's ECCs and policymakers to promote construction business sustainability for a new entrepreneur, emphasising business risk management via PMF and GPS to enhance the sustainable business cycle.
Originality/value
The research (PMF and GPS) is strategies to enhance ECCs business sustainability in the Nigerian construction sector and other developing countries with similar political and economic attributes. Besides the study guiding old and intending ECCs and policymakers in the developing countries industries, it would contribute to bridge the theoretical gap regarding PMF and ECC, especially ECCs in developing countries with similar business sustainability issues.
Details
Keywords
Yazeed A. Alragabah and Mohd. Ahmed
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of…
Abstract
Purpose
There is a limited number of research work on critical success factors (CSFs) in public construction projects in Saudi Arabia. In response to this knowledge gap, the objective of this paper is to assess the impact of CSFs on the government construction projects in Saudi Arabia. The success factors are investigated from a broader consideration of failure criteria, from consideration of most effectiveness in successful project completion and also from consideration of the impact of implementing control processes for successful project completion.
Design/methodology/approach
This study has analysed the impact of success factors on construction projects in Saudi Arabia using a descriptive methodology. An exhaustive literature survey is undertaken to identify the success and failure factors related to government construction projects in Saudi Arabia. The survey data are sorted out and analysed by cost, schedule, technical, context and finance dimensions of the projects based on project types, engineering complexity, size, modality, jurisdictional control and funding approach. To evaluate the influence of success factors implementation, qualitative data were collected in a survey via a web-based questionnaire that was sent to officials working and occupying a responsible position in national project guidelines organizations and in government construction organizations in Saudi Arabia. In all, 28 CSFs were identified, ranked and evaluated for their impact on project success. The four identified factors belong to process categories of construction projects, nine factors belong to management of construction projects and 15 success factors are identified for impact assessment of implementation in construction projects.
Findings
The study's findings have identified and ranked the top five CSFs that significantly influence project outcomes, including meeting time targets, adhering to financial budgets, delivering desired outcomes for all stakeholders, effectively managing risks and assembling the appropriate team while optimizing resource allocation. Additionally, the research indicates that hindrances to projects primarily stem from execution, economic, human and political factors. The study advocates for strict controls over incomplete engineering designs and advises against contractors independently handling design work to ensure project success. Additionally, addressing contractors' qualifications and financial matters is crucial for project success. By highlighting these CSFs and challenges, the research provides actionable insights to enhance project management practices in the construction industry.
Research limitations/implications
This study is limited to the infrastructure projects constructed by governmental bodies with the participation of officials from government organizations. Further study, including private projects and officials working on private projects, may be needed to generalized the research outcome.
Originality/value
Numerous studies have investigated CSFs in construction projects, but few have examined their relevance to Saudi Arabian government projects. This study aims to fill this gap by identifying key CSFs specific to Saudi Arabian public sector construction projects and assessing their impact on project success. It advocates for stringent controls in the Saudi Arabian construction sector, emphasizing the importance of preventing incomplete or altered engineering designs by contractors to increase the success rate of public sector projects. This research offers practical insights to stakeholders, advancing project management practices in Saudi Arabia's construction sector for improved outcomes and resource utilization.
Details
Keywords
The paper aims to investigate the prevailing institutional logics that underpin the organisational behaviours of Chinese contractors and the institutional complexity they face…
Abstract
Purpose
The paper aims to investigate the prevailing institutional logics that underpin the organisational behaviours of Chinese contractors and the institutional complexity they face across several strategic areas when they undertake projects abroad.
Design/Methodology/Approach
The paper draws mainly on industry literature, reports and government websites to develop a typology of two ideal types of institutional logics that prevail among Chinese international contractors. The configurations of institutional complexity in different strategic areas are analysed through pattern-matching.
Findings
Two main logics are identified, namely, construction and investment logics. These logics in turn lead to patterns of volatile complexity in the strategic areas of business, technology, human resources and marketing; patterns of aligned complexity in operational and information technology strategic areas; and patterns of segregated complexity in financial strategic area.
Research Limitations/Implications
The paper presents an ongoing doctoral research. It provides a preliminary understanding of the institutional logics affecting Chinese international contractors and sets out the first step to understand the relationship between complex institutional environments and organisational responses.
Practical Implications
Chinese international contractors commonly face resistance, and at times resentment, from the local industries in the countries they operate. The findings of this paper are a first step towards a better understanding of why this is the case and what can be done to rectify the situation and improve long and short-term project performance.
Originality/Value
This paper provides practical implications for Chinese contractors to understand their internal context of institutional complexity and provides the basis for further understanding of Chinese contractors’ strategic responses.
Details
Keywords
Corey Mack, Clay Koschnick, Michael Brown, Jonathan D. Ritschel and Brandon Lucas
This paper examines the relationship between a prime contractor's financial health and its mergers and acquisitions (M&A) spending in the defense industry. It aims to provide…
Abstract
Purpose
This paper examines the relationship between a prime contractor's financial health and its mergers and acquisitions (M&A) spending in the defense industry. It aims to provide models that give the United States Department of Defense (DoD) indications of future M&A activity, informing decision-makers and contributing to ensuring competitive markets that benefit the consumer.
Design/methodology/approach
The study uses panel data regression models on 40 companies between 1985 and 2021. The company's financial health is assessed using industry-standard financial ratios (i.e. measures of profitability, efficiency, solvency and liquidity) while controlling for economic factors such as national productivity, defense budgets and firm size.
Findings
The results show a significant relationship between efficiency and M&A spending, indicating that companies with lower efficiency tend to spend more on M&As. However, there was no significant relationship between M&A spending and a company's profitability or solvency. These results were consistent with previous research and the study's hypotheses for profitability and solvency. However, the effect of liquidity was the opposite of the expected result, possibly due to the defense industry's different view on liquidity compared to previous research.
Originality/value
The paper provides insights into the relationship between a prime contractor's financial health and its M&A spending, a topic with limited research. The findings can inform policymakers and regulators on the industrial base's future M&A activity, ensuring competitive markets that benefit the consumer.